ML17277B353

From kanterella
Jump to navigation Jump to search
Requests Certification That Tech Specs Accurately Reflect Plant,Fsar,Ser Analysis & Other Documentation within 10 Days.Proposed Changes Should Be Identified
ML17277B353
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/08/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8403280283
Download: ML17277B353 (4)


Text

~ LtllR 8

tg@

iDocket No.:

50-397 Mr. D.

W. ltazur Managing Director Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352 STRI BUT ION:

Document Control NRC PDR L

PDR NSIC PRC LB¹2 File EHylton RAuluck

Paton, OELD Region V
ELJordan, IE
NGrace, IE ACRS (16)

Dear Mr. Mazur:

Subject:

WPPSS Nuclear Project No.

2 Technical Specifications You are requested to review within ten (10) days of receipt of this letter, the subject Technical Specifications and provide certification, under oath or affirmation, that to the best of your knowledge they accurately reflect the plant, the FSAR and other documentation, and the SER analyses.

Any proposed changes should be identified in your response.

If you have any questions regarding this matter, please contact R. Auluck, Project Manager.

Sincerely, cc:

See next page Oz ig1na1 sign06 S9'g Darrtk%~'C~ 0'iseYIHA, director Division of Licensing Office of Nuclear Reactor Regulation

  • SEE PREVIOUS CONCURRENCES DL:LB¹2/PM DL:LB¹2/BC RAulucK pt ASchwencer
  • 3/ Oe'84 3/ Og84 D

/L Novak 3/

/84 D

1 ut 3/

/84 8403280283 840308 DOC~ 0~000 PDR

, ii~4 ".

e I

y,I ll ll

-I 4(

I' I

II I

4<> I f'f It+

I I'

I r

I I

~.)t~

OO WNP-2 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Ri chl and, Washington 99352 CC:

Nicholas Reynolds, Esquire Debevoise 8 Liberman 1200 Seventeenth

Street, N.

W.

Washington, D. C.

20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way

Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352 Mr. W. G. Conn, Sr.

N/M Group Supervisor Burns and Roe, Incorporated 601 Wil liams Boulevard

Richland, Washington 99352 Mr. Richard Feil U.S.

NRC Resident Inspector WPPSS-2 NPS P. 0.

Box 69 Richl and, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety 8 Regulatory Programs Washington Public Power Supply System P. 0.

Box 968, MD 650

Richland, Washington 99352 Mr. J.

D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352

~0