ML17277A984
| ML17277A984 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/07/1983 |
| From: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Harold Denton, Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17277A983 | List: |
| References | |
| NUDOCS 8311080390 | |
| Download: ML17277A984 (6) | |
Text
m",,>>.,"(
> ~
arne W I
dsy
+v i
~'s jt v
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 14GO h1ARIA LANE,SUITE 210 WALiNUTCREEK, CALIFORNIA1I4596 v
I'r I~
3t va id 8
i*
Jrd rm',
. avaa
~ZA"-tr
~ V
%rv t'
rr
= r+
m d
I, MEMORANDUM FOR:
H. Denton, Director, Office of Nuclear Reactor Regulation R.
C.
DeYoung, Director, Office of Inspection and Enforcement J.
B. Martin; Regional Administrator QUESTIONS AND REQUEST FOR DOCUMENTS CONCERNING WASHINGTON PUBLIC POWER SUPPLY SYSTEM (MNP-2)
BY REPRESENTATIVE JIM WEAVER FROM:
SUBJECT:
83110803St0 831018, ~
a>>a~
PDR ADOCK 05000397 A
PDR L
B Martin Regional Administrator cc:
D. Eisenhut, NRR R. Yollmer, NRR R. Auluck", NRR J. Taylor; IE R. Heishman, IE 1.
- Rehm, EDO The subject request was made by Representative Weaver in a letter to ChairiIIan Palladino dated September 28, 1983, a copy of which was provided to you by EDO on October 5, 1983 (Principal Correspondence Control No. 13616).
Region V has the lead assignment in responding to Representative Weaver'.
Your assistance is necessary in our efforts to prepare a proper response.
Specifically, your assistance is requested in preparing a list of the documents referred to in the n xt to last paragraph on page 2 of Representative Weaver'
.d. "... d td ii tt d
t. i i
i t i
dd re orts and memoranda, on ualit assurance, ual it contI ol, desi n deficiencies~
or manaaiement problems at WPPSS Z wbicCc were writ en b
, sent to or,routed throII h HRC since 1980 This list need not include documents contained in t e ublic records of NRC roceedin sma In particular, documents of the nature described above could relate, but not necessar i'}y be 1imited, to the civil penalty and 50.54{f) actions of June
- 1980, the ongoing independent 'design review (IDVP) program and the recent.
CAT inspection efforts at HNP-2.
To meet r current sche for response, we need your listing of documents by COB o
October 14, 1983.
This request has been discussed by J.
L, Crews of this o '+
rs (R. Auluck and R. Heishman) of your staffs.
Your cooperation in this request is appreciated.
Contact:
J.
L. Crews (FTS 463-3735)/P.
Johnson (FTS 463-3745).
~ -'
d aced
'sr i ni'-
~a
P t
~
~
4
~
10 11 03 AOU'flNG,AHf)
RANSMITTAL'I.IP
.Ot i'Nome, office symbol, room number, building, Agency/Post)
DL Initials Date ctlon roval s Ac uestod Ircuiate omment Coordination REMAAKS File For Clearance For Correction For Your Information Investigate Justlf Noto and Return Per Conversation Preparo Ac I
See Mo Signature TIIIS IS A CONTROLLED ACTIOW DOCUNEIIT BUT COULD HOT BE ASSIGNED.,A IIUf1BER TODAY.
IT IS BEIIIG FORWARDED lfITHOUT A YELLOll TICKET NUf1BER DUE TO THE TINE ELEMENT Il'IVOLVED.
~ yy
~ y
,1
~
~
l DO NOT use this form as a
RECORD of approvals, concurrences, dlsposais, clearances, and similar actions FROM: (Nome, org. symbol, Agency/Post) tIRR f1ai1 Room Room No.Bldg.
P-428 Phone No.
24966 S061-101
- GPO y 1980 0 - 311 156'6)
OPTIONAL FOAIyl 41 (Rev. 7<<76)
Prescribed by OSA
~
PPMn (41 CFn) 101 11.306
L.
S J
~P,q Afct
">>*<<~
e
~
'NITED STATES NUCLEAR REGULATORY COMMISSION REGIOfiI V 1450 MARIAI.ANE, SUITE 210 WALNUTCREEK, CALIFORNIA94596 Ot:T 7 ms3 MEMORANDUM FOR:
- g. Denton, Director, Office of Nuclear Reactor Regulation R.
C.
DeYoung, Director, Office of.Inspection and Enforcement FROM:
SUBJECT:
J.
B. Martin, Regional Administrator QUESTIONS AND REQUEST FOR DOCUMENTS CONCERNING WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WNP-2)
BY REPRESENTATIVE JIM WEAVER The subject request was made by Representative Weaver in a letter to Chairman Palladino dated September 28, 1983, a 'copy of which was provided to you by EDO on October 5, 1983 (Principal Correspondence Control No. 13616).
Region V has the lead assignment in responding to Representative Weaver.
Your assistance is necessary in our efforts to prepare a proper response.
Specifically, your assistance is requested in preparing a list of the documents referred to in the next to last paragraph on page 2 of Representative Weaver' letter, e.g. "...
rovide a list of all documents, includin internal staff re orts and memoranda on ualit assurance, ualit control, desi n deficiencies
~orrmana ament roblems at WPPSS 2 which were written b
, sent to, or routed throu h
NRC since 1980.
This list need not include documents contained in the ub ic records of NRC roceedin s".
In particular, documents of the nature described above could relate, but not necessarily be limited, to the civil penalty and 50.54(f). actions of, June
- 1980, the ongoing independent design review (IDVP) program and the recent CAT inspection efforts at WNP-2.
To meet our current schedule for response, we need your listing of documents by COB on October 14, 1983.
This request has been discussed by J.
L. Crews of this office with members (R. Auluck and R. Heishman) of your staffs.
Your cooperation in this request is appreciated.
Contact:
J.
L. Crews (FTS 463-3735)/P.
Johnson (FTS 463-3745).
cc:
DE Eisenhut, NRR R. Vollmer, NRR R. Auluck, NRR J. Taylor, IE R. Heishman, IE T.
- Rehm, EDO J.
B. Martin Regional Administrator
0 0
%j
~w
"/
~ J