Forwards List of Documents Not in Docket Files Re Qa,Qc & Design Deficiencies,Per 831007 Request
ML17277A982
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/18/1983
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17277A983 List:
References
NUDOCS 8311080362
Download: ML17277A982 (8)


Text

MEMORANDUM FOR:

J.

B. Martin, Regional Administrator Region V

FROM:

H.

R. Denton, Director Office of Nuclear Reactor Regulation

SUBJECT:

LIST OF DOCUMENTS CONCERNING WNP-2 ON QA, QC AND DESIGN DEFICIENCIES Per your request dated October 7, 1983, we have searched our Branch files for documents concerning QA, QC and design deficiencies at WNP-2 and find that most of these documents are in the Central Files.

Attached is a list of additional documents which are not in the Docket Files.

If you have any questions, please call R. Auluck, WNP-2 Project Manager, at (FTS) 492-8547.

gdghel Spate bg H. R. Bt.ntaa

Attachment:

As stated H.

R. Denton, Director Office of Nuclear Reactor Regulation I

  • SEE PREVIOUS PAGE FOR CONCURRENCES DL:LB82/PM*

DL:LB82/BC*

DL:AD/L* DL:DIR*

RAuluck:pt ASchwencer TMNovak DGEisenhut 10/14/83 10/14/83 10/14/83 10/14/83 NR8'/7 Case HRRnton 10/I'3 10/()/83 83ii080362 83iOi8 PDR ADOCK 05000397 PDRI

C H

)I UI 4

'4

~

UHU

e DATED:

October 18, 1983 YELLOW TICYET Dl STRIBUTIOH:

~Document Control 50-397

  • Local

'PDR~RC PDR*

PRC*

NSIC*

<(w/ incoming)

LB-..2 File RAul uc ):

EHylton PO'Bri en/TNova k DEi senhut/RPurpl e

NJambor HDenton/ECase

ELJordan, DEQA: IE
JHTaylor, DRP: IE
Paton, OELD

w

~

/

F'

Guy H. Cunningham, ELD to H.

R. Denton, dated October 14,

1982,

,"Corinission Decision on WNP-1 and WNP-2 CP Extension Hearing Petitions."

Daily Highlight, dated February 28,

1983, "Board Decision on Request for Hearing Filed by the Coalition for Safe Power."

R. Auluck to T. Novak, dated October 20,

1982, "Commission Decision on WNP-2 CP Extension Hearing Petition."

K. L. Leu to R. Auluck, dated October 15,

1982, "Containment Out-of-Roundness."

K. C.

Leu to R. Auluck, dated December 27,

1982, "WNP-2 Containment Out-of-Roundness."

P. Witley to R. Auluck, dated April 16,

1982, "Containment Out-of-Roundness."

Report dated April 20,

1983, "WNP-2 Design Reverification Status Meeting."

Report dated November 10,

1982, "WNP-2 Plant Verification Meeting with NRC."

R.

H. Engelken to H.

R. Denton, dated October 5, 1982, "Self-initiated Evaluation of Washington Public Power Supply, Unit 2."

J.

L. Crews to T. M. Novak, dated April 6,

1983, "WNP-2 Independent Design Verification Program."

R.

F. Heishman to G. Bagchi, dated August 2, 1983, "Rigid Conduit Connections to Electrical Equipment Enclosures at WNP-2."

K. C.

Leu to G. Lear, dated July 13,

1983, "WNP-2 Construction Problem and its Potential Impact on the Licensing Schedule."

J.

M. Taylor to R. Vollmer, dated July 1, 1983, "WNP-2 Component Support Design and Construction."

D.

M. Sternberg to A. Schwencer, dated February 13,

1983, "FSAR Amendment No. 27, WNP-2, Docket No. 50-397."

F.

Rosa to B. J.

Youngblood, dated April 17,

1981, "WNP-2 Cable'-

Separation Criteria."

S.

Rhow to M. Srinivasan, "Trip Report on Site Visit of WNP-2 (May 1982)."

r

EP,g REGS 0

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FROM: J.

MARTIN, REGION V ORIG.

DUE DATE:, 1:0/14/8Z ICKET NO:

839339

'OC DATE:

10/07/83 TO:

DENTON/DEYOUNG FOR SIGNATURE OF:

DENTON

>< YELLOW RR RCVD DATE:

10/li/83 DESC:

~ Q'S L.DOCUMENTS.'RE WNP-. 2-FOR-REP.:WEAVER>

REFERRED TO:

DL DATE: 10/1 1/83 CONTACT: ~EI HUT~

Q0W ggr ($

CC:

DENTON/CASE FUNCHES 1.

VOLLMER 2.

MATTSON 3.

THOMPSON 4.

SPEIS 5.

GRACE 6.

SNYDER P~~

/+

tO]~

PLEASE REVIEW THE DUE DATE IMMEDIATELY:

IF THE DUE DATE DOES NOT ALLOW ADEQUATE TIME TO RESPOND TO THIS TICKET, YOU MAY REQUEST A REVISED DUE DATE.

THE REQUEST MUST INCLUDE A VALID JUSTIFICATION AND BE MADE THROUGH YOUR CORRESPONDENCE CO-ORDINATOR TO THE NRR MAIL ROOM (KAREN BOWMAN OR MELANIE GARVER).

REQUESTS FOR REVISION OF YELLOW TICKET DUE DATES MAY BE MADE, WITH JUSTIFICATION, THRU THE WEEKLY WITS UPDATE UP TO ONE REEK AFTER ASSIGN-MENT BY NRR MAIL ROOM ~

THE NEW DUE DATE, IF APPROVED BY NRR MAILROOM, WILL BE USED TO TRACK DIVISION COR-RESPONDENCE COMPLETION SCHEDULES.

PLEASE DO NOT HAND CARRY CONCURRENCE PACKAGES TO DIRECTORS OFFICE WITHOUT FIRST GOING THRU THE NRR MAIL ROOM.

t e

I C

h H

  • 'll V

f c

Mg'