Docket No.

50-..397 l DEC 3 0

1981 f1EMORANDUM FOR:

A. Schwencer, Chief Licensing Branch No. 2, DL FROM:

SUBJECT:

R. Auluck, Project Manager Licensing Branch No. 2, DL FORTHCOMING l1EETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

DATE & TINE:

LOCATION'URPOSE:

January 12, 13

& 14, 1982

'8.'30 AM WPPSS Headquarters 3000 George Washington Way Richland, Washington Management Review Meeting (Agenda Attached)

'>F.Cl"""Ã>'"'l JP,N 51S82~

PARTICIPANTS:

NRC F. Allenspack, D. Sternberg, T. Young, M. Nodel, D. Osborn and R. Auluck MPPSS WPPSS Management OR'IEiml signed dy

Attachment:

Agenda cc:

See next page R. Auluck, Project Manager Licensing Branch No.

2 Division of Licensing Distribution see nex page OFFICE IP SURNAME$

DATE Q

..P:,L 8

ph

..1.2L.X~..J.Ol QL.'J.MZ.

ASchwen

.~u. ~.,j81 820ii90069 8ii230

~ -". PDR ADOCK 05000397 A

PDR NRC FORM 318 OO-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~5 990

. ~ Il 4I J

4-I'D%

-I

~ 4

~

II

~ ~. I 4 ~ 4 ~ j

ter.

R. L. Ferguson Managing Director Mashington Public Poser Supply System P. 0.

Box 968 3000 George Mashington Way

Richland, Washington 99352 cc:

Nicholas Reynolds, Esquire Debevoise 8 Liberman 1200 Seventeenth Street,'.

W.

Washington, D. C.

20036 Richard Q. Quigley, Esquire Washington Public Power Supply System P.

0 Box 968 Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council 820 East Fifth Avenue Olympia, Wahington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O.

Box 968 Richland, Washington 99352 Nr. 0. K. Earle, Project Licensing Supervisor

.Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 ter. Albert D. Toth U.S. N.R.C. Resident Inspector WPPSS-2 NPS P.O.

Box 69 Richland, Washington 99352

MANAGEMENT REVIEW WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 Specific Matters to be Covered:

1.

Overall corporation organization, showing the organizational units that will provide overall management and technical support for the operation of WNP-2.

Particular emphasis should be placed on:

a)

Latest organizational transitions completed or planned, such as the lines of authority and reporting for startup and testing, Nuclear Safety Function, Health Safety and Security, and the Independent Safety Engineering Group.

b)

Technical support to be provided by the Technology Directorate vice the technical support to be provided by WNP-2 Program (Project Management) c)

Numbers and qualifications of technical support personnel d)

Relationship between corporate support elements and the plant staff 2.

The organizational structure for the preoperational and startup test program.

Technical support to be provided to the program from the home office, G.E.

and BSR.

The numbers and qualifications of support personnel.

The involvement of the home office and plant staff in the preoperational testing and startup program.

3.

The provisions for maintaining and transferring the plant knowledge gained in the design and construction phase to the operating organization (home office and plant staff).

k'

4.

Updates, if any, on the plant staff organization, including numbers of personnel on board (status of hiring) and the projected number for fuel loading.

gualification requirements for plant staff positions.

5.

The projected shift manning and number of operators in the training pipeline to meet shift staffing objectives.

6.

Training organization and programs for both plant staff and home office.

Responsibilities of Power Generation Training Manager vice Plant Staff Training Supervisor.

Provisions for unlicensed operator training, training for mitigating core

damage, and fire brigade training.

7.

Provisions for meeting the following Task Action Plan items.

I a.

I.A.1.2; I.C.3: Shift Supervisor Responsibilities b.

I.C.2; Shift and Relief Turnover Procedure c.

I.C.4; Control Room Access d.

I.C.5; Proceudres for Feedback of Operating Experience to the Plant Staff e.

I.C.6; Guidance on Procedures for Verifying Correct Performance of Operating Activities 8.

Administrative controls over the initial test program including:

a.. System used to develop, review and approve individual test procedures b.

Controls that govern conduct of major phase of test program to assure prerequisites are met, means to assure that shortcomings found as a

result of the test are resolved c.

Procedures that govern the review, evaluation, and approval of test results

References:

NUREG-0800 -

SRP Sections 13.1, 13.2.2,'3.4 and 13.5.1 NUREG-0?31 - Draft Report - September 1980

A I

V

~

~

'filfG 3

11 1991 Docket File(s)

NRC PDR Local PDR Branch Reading File NSIC TERA TIC E.

G.

Case D.

G. Eisenhut/R.

P N. Hughes T. Novak S.

Yarga T. Ippolito R. A. Clark J.

F. Stolz (ORB=::4)

R. Tedesco B. J.

Youngblood A. Schwencer F. Miraglia E.

Adensam (LB-..4)

J.

R. Miller G. Lainas D.

M. Crutchfield B. T. Russell J. Olshinski R.

H. Vollmer R. J. Mattson S.

H. Hanauer T. Murley.

J.

P. Knight ii. Johnston (AD/Mlat D.

R. Muller P.

S.

Check M.

E. Kreger L. S.

Rubenstein F. Schroeder M. L. Ernst ACRS (16)

OI&E (3)

OSD (7)

Attorney, OELD J.
LeDoux, I&E Y. Moore B. Grimes urpl e erials

& gualif. Engr)

I&E Region I I&E Region II I&E Region III

'I&E Region IV I&E Region V

NRC Partici ants:

bcc:

Applicant Service List Branch Licensing Branch No.

2 Project Hanger k'e PjU-(u+

Licensing Assistant Mi. Service 4l e

J 5

E

'eQvp

I ss 5

~

~