ML17276A192

From kanterella
Jump to navigation Jump to search
Advises That 811013 Draft Preliminary SER Re Applicant 771103 Fire Protection Evaluation Identified Many Areas of Noncompliance W/Nrc Guidelines.Revised Fire Hazards Analysis Prepared by Applicant Received Too Late for Evaluation
ML17276A192
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/06/1981
From: Cohn B
GAGE-BABCOCK ASSOCIATES, INC.
To: Benaroya V
Office of Nuclear Reactor Regulation
References
7917-3, NUDOCS 8111130599
Download: ML17276A192 (4)


Text

RKGULAfl'DRY INFOR>>RA>>TIDE DISTRIBUTION SYS E'M~ (RIDS)

ACCESSIO>>VI NBR'.81.11130599 DOC ~ DA>>TEt! 81/41/06 NOTARIZED:" NO DOCKER'I 0 FACXLb50.'97 NPPSS Nuclebr Pi ojie'ct~ Und t" 2< Washington Publ ic'bwel 05090397 AUTH~ iVAMK! AUTHOR AFFILIATKON COHNg B'~ 4I!~ Gage&Bhbcocki Ahsociates'~, Inc, REC IP ~ VAi4IKI RECK PZKNT AFF IL>>IATI0>>V>>

BENAROiYA>>r Yi Chemiical Enginee'r>>ing, B'ranch.

SUBJECT:

" Advises'hat>> 811013 draft pr elimgner y SER re( applicanti 771103>> f ir e protection>> ek aluat>>ion>> )debts f i ed many arabs of noncompl iance /xNRC'uidelines".Relised fire hangar ds encl ysis>>

prewar ed>> by applicant received>> too late> for eValuation>>,

D>>ISTRiIBUT'ION CODEI: 80928'OPIES RECEIVED'LA'R 'NCLl 'IZES T>>ITLEf:: Fire( pi ate'et%on (Prior>> to Issuance>> of OL0.

NOTES'.2'opies all matlcPH. 050903!97 RECXPXKNT~ COPZ RKCX PL ENT" I0< C 0 9 E'/N A M K I ESTTR EiVC Lt ID- CODE'/NAME!!

COPZEB'ITYRI ENCL(

ACTKONe~-'IICl BR 02>> BC AULUCKg R ~ 01~

INTERNALS'LO~ 1 I8 El 07 NRR>>/DKyADgQE 1 I

06'KG NRR'/DSI YASB 1 F > 0/4 EXTERNALr.- ACR8 10. 16 1 LPDR>> 03>>

NRCI PDRl 02>> 1 Jt %SIC[ 054 NT'I 8 1 TOiTAL NU.~iBERI OF COPIES" REQUIRED:: LA'TR ~ ENCL( Pf'

E GAGE-BABCOCK 8 ASSOCIATES, INC.

CHICAGO OFFICE ~ 135 ADDISON AVENUE, ELMHURST, IL 60126 ~ (312) 530-1494 PAUL D. SMITH. P.E.. President BERT M. COHN. P.E,. Senior Vice President November 6, 1981 File 7917-3 U.S. Nuclear Regulatory Commission Chemical Engineering Branch, NRR Washington, D.C. 20555 Attn: Mr. V. Benaroya Gentlemen: Review of WPPSS Nuclear Project No'.2 Fi'r'ePro't'e'cti'o'n 'Pro'am Our review of the WPPSS Nuclear Project No. 2 fire protection program consisted of the review of the "WPPSS Nuclear Project.

No. 2, Fire Protection Evaluation" submitted by the applicant by cover letter dated November 3, 1977.

A draft, Preliminary Safety Evaluation Report was prepared by GBA and submitted to NRC on October 13, 1981. The draft SER, which was based entirely on the November 3, 1977 submittal from the applicant, identified many areas where the WPPSS Nuclear Project No. 2 fire protection program is not in compliance with the guide-lines contained in Appendix A to BTP ASB 9.5-1, Appendix R to 10 CFR Part 50, and NUREG-0800, USNRC Standard Review Plan for the Fire Protection Program.

A completely revised Fire Hazards Analysis prepared by the appli-cant was received on October 26, 1981, too late to be reviewed and evaluated prior to the expiration of this task order.

Very truly yours, Bert M. Cohn Project Director 8iffi30599 8fii06 PDR ADOCK F 05000397 PDR ENGINEERS AND CONSULTANTS IN FIRE PROTECTION. SAFETY ANO SECURITY CHICAGO ~ SAN FRANCISCO ~ LOS ANGELES ~ NEW YORK ~ WASHINGTON

S

A lt, g ~ II 1~

41>>

t

\