ML17276A166

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-20 on 810914-18.No Noncompliance Noted
ML17276A166
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/26/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17276A167 List:
References
NUDOCS 8111050674
Download: ML17276A166 (4)


See also: IR 05000397/1981020

Text

s

OCT 29

19h)

Docket No. 50-397

IZHQZZLEC~

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director, WNP-2 Project

Sg

-'- a<Kigg '-

htOV04 tesi~: g

U.S. NUCSSAII ECOUI~+

COANIQQQ

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Pro)ect

No.

2 (WNP-2)

This refers to the inspection

conducted

by Mr. D. P, Haist of this office

on September

14-18,

1981 of activities author ized by

NRC Construct1on

Permit

No. CPPR-93,

and to the discussion of our findings held by Mr. Haist with

Mr. R. T. Johnson

and other members of your staff at the conclusion of the

inspection.

Areas

examined during this inspection

are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy

of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If th1s report contains

any information that

you (or your contractors)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the

date of this letter.

a written application to th1s office to withhold such

information. If your rece1pt of this letter

has

been delayed

such that

less than seven

(7) days are available for your review, please notify this

office promptly so that

a new due date

may be established.

Consistent

with section 2.790(b)(1),

any such applicat1on

must be accompanied

by an

affidavit executed

by the owner of the information which identifies the

document or part sought to be withheld,

and which contains

a full statement

of the bas1s

on which it 1s cla1med.that

the informat1on should

be withheld

from public disclosure.

This section further requires

the statement

to

+~0

address with specificity the considerations

11sted in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorporated

as far as possible

OFFICE/

SURNAME)

......xcgor.C

in the

DATEP

~ ~

efff05067

PDR

ADQCK

PDR

(

~ ~ ~ ~ ~

NRC FORM 318

Q

wi-r-talAL

1Q)g..-ge.ape

$f')ed period

ublic Documen

Room.

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ s ~ ~ ~ ~ ~ ~

Qo 0 ~ ~ ~ ~

noted above,

HAI ST@%

""-

$0jjg'/81

the report wi

DODDS

10'/

RECORD COPY

1 be plac

FAULKENBE

10/~+81

RV/dot

'.I USGPO: 198~29 824

'

  • -

<<4

t

P

4

4

<>t

~

~

4

~ "4

~

~

\\ ~

4

4

4

I

"'

I'

4

\\

I

P

'I

~

4

~

~

4

4

I

4

4>

P

4

4

4

4

4

I

~

>>tt

~f

I

4

4 ~ flgtt

VS 4'>>

W "

I~

~

4

~

~ I Jt ~

4.

4 ~ I

~

4

J

I

I

0

'

)

Washington Public Power Supply System

-2- -'

'Should you.have

any questions

concerning this inspection,

we ><ill be glad

to. discuss, them with you.

Sincerely,

Qg

gP) 4'y 7 kg/l<<P

B.

H,

aulkenberry,

Chief

Reactor Construction

Pr ojects

Branch

Enclosure:-

IE Inspection

Repor t

No. 50-397/81-20

cc w/o 'enclosure:

R.

B. Glasscock, guality Assurance Director

W. C. Bibb, Project Nanager,

WNP-2 Project,

G. C. Sorensen,

WPPSS

bcc:

DMB/Document Control Desk

(RIDS)

Distributed by RV:

State of WA (Lewis)

Resident

Inspectors

(3)

RHE (w/o enc)

0

%iiia

-'I

,,1

<t.

g p r~'

~ ~))(~."

g,.i)((q

0

'1

w'

'LK'

t

)w

'

t

~

~

I

cl(ps

'

'. y,

'>,sPii<

l

'I/

-

'

g >e,

'

.

,J

>I "

I

)

4

g, ll

L"

1

J

8

)5

3

(~ ~IS)

A29G

I 0 f~'fC3 ~ A9"IQOV(8""

'Q3H

VH yd 4st~id'rzfziQ

(8'433) FJ

Vo of~i93

('->

a~oP~

qz.~r "n~br~e".~

(~re eg;~)

3HA