ML17276A166
| ML17276A166 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/26/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17276A167 | List: |
| References | |
| NUDOCS 8111050674 | |
| Download: ML17276A166 (4) | |
See also: IR 05000397/1981020
Text
s
OCT 29
19h)
Docket No. 50-397
IZHQZZLEC~
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr. R.
G. Matlock
Program Director, WNP-2 Project
Sg
-'- a<Kigg '-
htOV04 tesi~: g
U.S. NUCSSAII ECOUI~+
COANIQQQ
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Pro)ect
No.
2 (WNP-2)
This refers to the inspection
conducted
by Mr. D. P, Haist of this office
on September
14-18,
1981 of activities author ized by
NRC Construct1on
Permit
No. CPPR-93,
and to the discussion of our findings held by Mr. Haist with
Mr. R. T. Johnson
and other members of your staff at the conclusion of the
inspection.
Areas
examined during this inspection
are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations,
a copy
of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room.
If th1s report contains
any information that
you (or your contractors)
believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the
date of this letter.
a written application to th1s office to withhold such
information. If your rece1pt of this letter
has
been delayed
such that
less than seven
(7) days are available for your review, please notify this
office promptly so that
a new due date
may be established.
Consistent
with section 2.790(b)(1),
any such applicat1on
must be accompanied
by an
affidavit executed
by the owner of the information which identifies the
document or part sought to be withheld,
and which contains
a full statement
of the bas1s
on which it 1s cla1med.that
the informat1on should
be withheld
from public disclosure.
This section further requires
the statement
to
+~0
address with specificity the considerations
11sted in 10 CFR 2.790(b)(4).
The information sought to be withheld shall
be incorporated
as far as possible
OFFICE/
SURNAME)
......xcgor.C
in the
DATEP
~ ~
efff05067
ADQCK
(
~ ~ ~ ~ ~
Q
wi-r-talAL
1Q)g..-ge.ape
$f')ed period
ublic Documen
Room.
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ s ~ ~ ~ ~ ~ ~
Qo 0 ~ ~ ~ ~
noted above,
HAI ST@%
""-
$0jjg'/81
the report wi
DODDS
10'/
RECORD COPY
1 be plac
FAULKENBE
10/~+81
RV/dot
'.I USGPO: 198~29 824
'
- -
<<4
t
P
4
4
<>t
~
~
4
~ "4
~
~
\\ ~
4
4
4
I
"'
I'
4
\\
I
P
'I
~
4
~
~
4
4
I
4
4>
P
4
4
4
4
4
I
~
>>tt
~f
I
4
4 ~ flgtt
VS 4'>>
W "
I~
~
4
~
~ I Jt ~
4.
4 ~ I
~
4
J
I
I
0
'
)
Washington Public Power Supply System
-2- -'
'Should you.have
any questions
concerning this inspection,
we ><ill be glad
to. discuss, them with you.
Sincerely,
Qg
gP) 4'y 7 kg/l<<P
B.
H,
aulkenberry,
Chief
Reactor Construction
Pr ojects
Branch
Enclosure:-
IE Inspection
Repor t
No. 50-397/81-20
cc w/o 'enclosure:
R.
B. Glasscock, guality Assurance Director
W. C. Bibb, Project Nanager,
WNP-2 Project,
G. C. Sorensen,
bcc:
DMB/Document Control Desk
(RIDS)
Distributed by RV:
State of WA (Lewis)
Resident
Inspectors
(3)
RHE (w/o enc)
0
%iiia
-'I
,,1
<t.
g p r~'
~ ~))(~."
g,.i)((q
0
'1
w'
'LK'
t
)w
'
t
~
~
I
cl(ps
'
'. y,
- '>,sPii<
l
'I/
-
'
g >e,
'
.
,J
>I "
I
)
4
g, ll
L"
1
J
8
)5
3
(~ ~IS)
A29G
I 0 f~'fC3 ~ A9"IQOV(8""
'Q3H
- VH yd 4st~id'rzfziQ
(8'433) FJ
Vo of~i93
('->
a~oP~
qz.~r "n~br~e".~
(~re eg;~)
3HA