ML17276A130

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-16 During Aug 1981.No Noncompliance Noted
ML17276A130
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/29/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17276A131 List:
References
NUDOCS 8110230483
Download: ML17276A130 (2)


See also: IR 05000397/1981016

Text

SEP 29

19SI

~~~zrzcoe>

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director

Gentlemen:

Subject:

NRC INSPECTION

This refers to the routine inspection conducted

by Mr. A. Toth of

this office during August, 1981, of activities authorized

by NRC

Construction Permit No. CPPR-93,

and to the discussion of his findings

held by Mx, Toth with Mr.

W. Bibb, Mr. R. Johnson

and othex

members of

your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection. report.

Within these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified with-

in the scope of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a

copy of this letter and the enclosed inspection report will be placed

in the NRC's Public Document

Room. If this report contains

any infor-

mation that you believe to be exempt'rom disclosure

under

10 CFR 9.5

(a)(4), it is necessary

that yo'u (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within 25 days from"

the date of this letter a written application to this office to with-

hold such information. If your receipt of this lettex

has

been delayed

such that lesss

than seven

(7) days are available for your review, please

notify this office promptly so that a new due date

may be established.

Consistent with section 2.790(b)(1),

any such application must be

accompanied

by an affidavit executed

by the owner of the information

which identifies the document or part sought to be withheld, and claimed

that the information should be withheld from public disclosure.

This

section fuxther requires

the statement to address

with specificity

the considerations

listed in 10 CFR 2.790(b)(4).

The information sought

OFFICEI

SURNAME/

DATEP

A....Znkh.....

9/p,IL/81

R.... Dadds.....

9/g.</81

NRC FORM 318 IIO/80) NRCM 0240

~ ~ ~ ~ ~

~

\\

R...Za.

9/g4/81

anb

OFFICIAL RECORD COPY

rry

~ 8 $ fppgp48p

8fp9p9

I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

PDR AoacK osooo39r

~ I

"i 6

PQQ

o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~

~ ~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

  • USGPO. 19~29 824

I

I

C

I

~