Text
7
JUL 82
1981
Docket No. 50-397
w
iE pi~E <<@
Washington Public Power Supply System
P. 0. Box 968
Richland, washington
99352
Attention: Mr. R.
G. Matlock
Program Director
Gent'Iemen:
Subject:
NRG INSPECTION
- I
0J
o,- egg/(p)
'IQG
g
.Co~ 1S9~EAF02E
10M
q
This refers to the routine inspection
conducted by Mr-. A. Toth of this office
during June
1981, of activities authorized
by NRC Construction Permit No. CPPR-93,
and to the discussions
of.our findings held by Mr. Toth with Mr. R. Johnson
and
other members of -your staff at the conclusion of the inspection.
'Areas
examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observa-
tions by the inspector.
No items of noncompliance with NRC requirements
were identified within the scope
of this inspection.
In accordance
with 10
CFR 2.790 of the Commission's regulations,
a copy of this
letter and the eneTosed
inspection report will be placed in the
NRC's Public
Document-Room.
If this report contains
any information that you believe to be
exempt from disclosure
under
10 CFR 9.5(a)($ ), it is necessary
that you (a)
notify this office by telephone within ten <10) days from the date of this letter
of your intention to file a request f'r withholding; and (b) submit within 25
days from the date of thCs letter
a written application to this office to
withhold such information. If your receipt of this letter
has
been
delayed
such
that less
than seven
(7) days are available for your review, please notify this
office promptly so that
a new date
may be established.
Consistent with section
2.790(b)(l),
any such application must be accompanied
by an affidavit executed
by the owner of the inforaption which identifies the document or part sought to
be withheld,
and which coritains
a full statement of the basis
on which it is
claimed that the information should te withheld from public disclosure.
This
section further requires
the statement to address
with specificity the consider a-
tions listed in 10
CFR 2.790(b)(4).
The information sought to be withheld shall
8108040263
810722
ADOCK 05000397
8
OFFICEP
SURNAME/
OATE f>
. QV.; qg
.A... 1;oth.~..'.,
7//g /81
8....Eau]
enber.
7/oX/81
~ ~
~
~ ~
NRC FORM 318 ROI80) NRCM 0240
OFFICIAL RECORD COPY
1 USGPO: 19~29.824
Washington Public Power Supply System -2-
JUL 2Z 88~
be incorporated
as far
as possible into
a separate
part of the affidavit. If
we do not hear from you in this regard within the specified periods
noted
above,
the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection,
we wil] be glad to
discuss
them with you.
Sin ere
B.
H. Faulkenberry,
Chief
,
Reactor Construction Projects
Branch
Enclosure:
IE Inspection
Report.
No. 50-397/81-11
cc w/o enclosure:
W.
C. Bibb, Project
Manager
R.
B. Glasscock,
(juality Assurance
Director
Sent to
DAB for
DCS processing.
Distributed by RV:
RV PDR
RHE (w/o enclosure)
Resident
Inspectors
(3)
State of WA (Lewis)
lf
I
i
I
II
c
P
H
II i
1
vi
IJ
'