Text

7

JUL 82

1981

Docket No. 50-397

w

iE pi~E <<@

Washington Public Power Supply System

P. 0. Box 968

Richland, washington

99352

Attention: Mr. R.

G. Matlock

Program Director

Gent'Iemen:

Subject:

NRG INSPECTION

  • I

0J

o,- egg/(p)

'IQG

g

.Co~ 1S9~EAF02E

10M

q

This refers to the routine inspection

conducted by Mr-. A. Toth of this office

during June

1981, of activities authorized

by NRC Construction Permit No. CPPR-93,

and to the discussions

of.our findings held by Mr. Toth with Mr. R. Johnson

and

other members of -your staff at the conclusion of the inspection.

'Areas

examined during this inspection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observa-

tions by the inspector.

No items of noncompliance with NRC requirements

were identified within the scope

of this inspection.

In accordance

with 10

CFR 2.790 of the Commission's regulations,

a copy of this

letter and the eneTosed

inspection report will be placed in the

NRC's Public

Document-Room.

If this report contains

any information that you believe to be

exempt from disclosure

under

10 CFR 9.5(a)($ ), it is necessary

that you (a)

notify this office by telephone within ten <10) days from the date of this letter

of your intention to file a request f'r withholding; and (b) submit within 25

days from the date of thCs letter

a written application to this office to

withhold such information. If your receipt of this letter

has

been

delayed

such

that less

than seven

(7) days are available for your review, please notify this

office promptly so that

a new date

may be established.

Consistent with section

2.790(b)(l),

any such application must be accompanied

by an affidavit executed

by the owner of the inforaption which identifies the document or part sought to

be withheld,

and which coritains

a full statement of the basis

on which it is

claimed that the information should te withheld from public disclosure.

This

section further requires

the statement to address

with specificity the consider a-

tions listed in 10

CFR 2.790(b)(4).

The information sought to be withheld shall

8108040263

810722

PDR

ADOCK 05000397

8

PDR

OFFICEP

SURNAME/

OATE f>

. QV.; qg

.A... 1;oth.~..'.,

7//g /81

8....Eau]

enber.

7/oX/81

~ ~

~

~ ~

NRC FORM 318 ROI80) NRCM 0240

OFFICIAL RECORD COPY

1 USGPO: 19~29.824

Washington Public Power Supply System -2-

JUL 2Z 88~

be incorporated

as far

as possible into

a separate

part of the affidavit. If

we do not hear from you in this regard within the specified periods

noted

above,

the report will be placed in the Public Document

Room.

Should you have any questions

concerning this inspection,

we wil] be glad to

discuss

them with you.

Sin ere

B.

H. Faulkenberry,

Chief

,

Reactor Construction Projects

Branch

Enclosure:

IE Inspection

Report.

No. 50-397/81-11

cc w/o enclosure:

W.

C. Bibb, Project

Manager

R.

B. Glasscock,

(juality Assurance

Director

Sent to

DAB for

DCS processing.

Distributed by RV:

RV PDR

RHE (w/o enclosure)

Resident

Inspectors

(3)

State of WA (Lewis)

lf

I

i

I

II

c

P

H

II i

1

vi

IJ

'