JUL 10
1981
Docket
Ho. 50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Hr. R. G. Hatlock
Program Director
Gentlemen:
Subject:
NRC Inspection
46 ElLe 0IYIIy
'gt'Q'lUG
03 1981 ~
6
ks4 181QEAR RtaRhlI3&
O7m18SII7q
This refers to the routine inspection
conducted
by Mr . A. Toth of this office
during Hay 1981 of activities authorized
by .NRC Construction Permit No.
CPPR- 93,
and to the discussion of our findAngs held by Hr. Toth with Hr, R.
G. HatlocF
and othe~ members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are descibed
in the enclosed
inspection
report..
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personne'l,
and obser-
vations
by the inspector.
ttto items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the NRC's
Public Document
Room.
If this report contains
any information that you believe
to be exampt from. disclosure
under
10 CFR 9.5(a (4), it is necessary
that you
{a) notify this 6'@ice by telephone within ten
10) days from the date of this
letter of your intention to file a request for withholding; and (b) submit within
25 days from the date of this letter
a written app'lication to this office to
withhold such information. If your receipt of this letter has
been delayed
such that less than seven
(7) days are available for your review, please notify
this office promptly so that
a new due date
may be established.
Consistent
with section 2.790(b)(l),
any such application must be accompanied
by an affidavit
executed
by the owner of the inf6(mation which identifies the document, or part
sought to be withheld,
and which contains
a full statement of the reasons
on
the basis
which it is claimed that the information should be withheld from
public disclosure.
This section further requires
the statement
to address
with
specificity the considerations
listed in 10 CFR 2.790(b){4).
The information
I
8i08040240 8i07i0
ADOCK 05000397'gI7(
, 8
OFFICE/
SURNAME
OATE$
7S F/
~KF-
NRC FORM 318 (9.76) NRCM 0240
4 U.S. GOVERNMENT PRINTING OFFICE: 1979.289.369
4
nl
VR
r
ii np
V
11
W
~V+VV
EV'i
VER
P"I'. ER lr
RN
.Ci~'V'I~~
i,E
n
==+V ~
E
'
~ n
n
r
'
'E
nn
1
E
I
~
E
n'JE
R
'
I'I
E r
~
~
E
J
R
1
0,
Washington Public Power Supply System -P-
JUQ $ Q ]9@
sought to he withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear. from you in this regard Mithin the
speci6ied periods
noted above,
the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
Enclosure:
IE Inspection Report
Ho. 50-397/81-10
Original si.gned
by
T.
M. Bishop for
B. H. Fau1kenberry,
Chief
Reactor Construction Projects
Branch
cc w/o enclosure:
W. C. Bibb, Project Manager
R. B. Glasscock, guality Assurance Director
G.
C.
Sorensen
Sent to Reproduction,
Hg, for distribution
Distributed
by RV:
RV "PDR
Engelken (ltr)
State of NA (Lewis)
Resident
Inspector ('9$
v
l
>r, ly
4 ll
F
F
lw
1
I
'4!