JUL 10

1981

Docket

Ho. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Hr. R. G. Hatlock

Program Director

Gentlemen:

Subject:

NRC Inspection

46 ElLe 0IYIIy

'gt'Q'lUG

03 1981 ~

6

ks4 181QEAR RtaRhlI3&

O7m18SII7q

This refers to the routine inspection

conducted

by Mr . A. Toth of this office

during Hay 1981 of activities authorized

by .NRC Construction Permit No.

CPPR- 93,

and to the discussion of our findAngs held by Hr. Toth with Hr, R.

G. HatlocF

and othe~ members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are descibed

in the enclosed

inspection

report..

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personne'l,

and obser-

vations

by the inspector.

ttto items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the NRC's

Public Document

Room.

If this report contains

any information that you believe

to be exampt from. disclosure

under

10 CFR 9.5(a (4), it is necessary

that you

{a) notify this 6'@ice by telephone within ten

10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit within

25 days from the date of this letter

a written app'lication to this office to

withhold such information. If your receipt of this letter has

been delayed

such that less than seven

(7) days are available for your review, please notify

this office promptly so that

a new due date

may be established.

Consistent

with section 2.790(b)(l),

any such application must be accompanied

by an affidavit

executed

by the owner of the inf6(mation which identifies the document, or part

sought to be withheld,

and which contains

a full statement of the reasons

on

the basis

which it is claimed that the information should be withheld from

public disclosure.

This section further requires

the statement

to address

with

specificity the considerations

listed in 10 CFR 2.790(b){4).

The information

I

8i08040240 8i07i0

PDR

ADOCK 05000397'gI7(

, 8

PDR

OFFICE/

SURNAME

OATE$

7S F/

~KF-

NRC FORM 318 (9.76) NRCM 0240

4 U.S. GOVERNMENT PRINTING OFFICE: 1979.289.369

4

nl

VR

r

ii np

V

11

W

~V+VV

EV'i

VER

P"I'. ER lr

RN

.Ci~'V'I~~

i,E

n

==+V ~

E

'

~ n

n

r

'

'E

nn

1

E

I

~

E

n'JE

R

'

I'I

E r

~

~

E

J

R

1

0,

Washington Public Power Supply System -P-

JUQ $ Q ]9@

sought to he withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear. from you in this regard Mithin the

speci6ied periods

noted above,

the report will be placed in the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Enclosure:

IE Inspection Report

Ho. 50-397/81-10

Original si.gned

by

T.

M. Bishop for

B. H. Fau1kenberry,

Chief

Reactor Construction Projects

Branch

cc w/o enclosure:

W. C. Bibb, Project Manager

R. B. Glasscock, guality Assurance Director

G.

C.

Sorensen

Sent to Reproduction,

Hg, for distribution

Distributed

by RV:

RV "PDR

Engelken (ltr)

State of NA (Lewis)

Resident

Inspector ('9$

v

l

>r, ly

4 ll

F

F

lw

1

I

'4!