Forwards IE Insp Rept 50-397/81-01 on 810108-30.No Noncompliance Noted
ML17275A916
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/18/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A917 List:
References
NUDOCS 8103240693
Download: ML17275A916 (4)


See also: IR 05000397/1981001

Text

~PJ'S

4EQIj

P

~4

0

+**4+

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

February

18,

1981

V2@g

'ZOil,~

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director,

WNP-2

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Mr. A. Toth of this office during

January

1981 of activities authorized

by

NRC Construction Permit No. CPPR-93,

and to the discussion of our findings held by Mr. Toth with Mr. R. Johnson

and other members of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these areas,

the inspection consisted of selective examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

No items of noncompliance" with NRC requirements

were identified within the

scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part

2,'itle

10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If this

report contains

any information that you believe to be proprietary, it is

necessary

that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure.

The application must include

a full statement of

the reasons

why it is claimed that the information is proprietary.

The application

should

be prepared

so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also

be placed in the Public Document

Room. If we do not hear

from

you in this regard within the specified period, the report will be placed

in the Public Document

Room.

tl

4

I

/

"ti~

  • IP

February

18,

1981

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection Report

No. 50-397/81-01

G. S.

Spe cer, Chief

Reactor Construction

and Engineering

Support

Branch

cc w/enclosure:

M. E. Witherspoon, guality Assurance

Director

W. C. Bibb, Project Manager

WNP-2 Project

0