ML17275A914
| ML17275A914 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/13/1981 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8103200901 | |
| Download: ML17275A914 (6) | |
Text
~p,8 AKCy(
wr, Cy
+p*y4 UNITED STATES NUCLEAR REGULATOR Y COMMISSION
'EGION V
1990 N. CALIFORNIABOULEVARO SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 February 13, 1981 Docket No. 50-397 r.
r Washington Public Power Supply System P. 0.
Box 968 3000 George Washington'Way
- Richland, Washington 99352 Attention:
Mr.
R.
G. Matlock Program Director, WNP-2 Gentlemen:
Enclosed is IE Bulletin No. 80-17, Supplement 5 which is transmitted for information with regard to your nuclear power facility.
Should you have any questions regarding this bulletin supplement, please contact this office.
Sincerely,
Enclosures:
l.
IE Bulletin No. 80-17, Supplement 5
2.
List of Recently Issued IE Information Notices R.
H. Engelken
,Director cc w/enclosures:
M. E. Witherspoon, WPPSS W.
C. Bibb G.
C. Sorensen, WPPSS 81P 39 0 pro(
~ <<
t 1
~
g
~
t l
I R
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.
20555 February 13, 1981 SSINS No.: 6820 Accession No.:
801104259 IEB 80-17, Supp.
5 IE BULLETIN NO. 80-17, SUPPLEMENT 5:
FAILURE OF CONTROL RODS TO INSERT DURING A SCRAM AT A BWR Des cri tion of Circumstances:
On July 3, 1980, the NRC issued IE Bulletin No. 80-17, that required actions to be taken by licensees of all operating GE BWRs.
Among the actions required, Item 6(a) required a prompt notification report by telephone to the appropriate Regional Office followed by a telecopy or other written submittal.
These reports were required in the event that any of the systems (HPCI, RCIC, SLCS,
- RPT, RHR/pool cooling, and main steam bypass) were found to be less than fully operable.
These reports have served the purpose of notifying NRC of cases of potential reduction in operability of systems important to the mitigation of consequences of an anticipated transient without scram (ATWS) event.
These reports are no longer necessary since improvements have been accomplished,to increase the reliability of control rod scram.
Actions No Lon er Necessar b
Licensees:
Further reporting is not required in resoonse to Item 6(a) of IE Bulletin No. 80-17.
This does not change the reporting requirements set forth in your license technical specifications.
No written response to IE Bulletin 80-17, Supplement 5, is required.
If you have any questions regarding this matter, please contact the appropriate NRC Regional Office.
Attachment:
Recently issued IE Bulletins
~ ~
W
RECENTLY ISSUED IE BULLETINS Attachment IEB 80-17, Supp.
5 February 13, 1981 Bulletin No.
Sub 'ect Date Issued Issued To 81-01 80-25 Surveillance of Hechanical Snubbers Operating Problems with Target Rock Safety-Relief Valves at BWRs 1/27/81 12/19/80 All power reactor facilities with an OL 8 to specified facilities with CP All B'WR facilities with an OL 8 specified near term OL BWR facilities 5 all BWRs with a CP Supplement 4
Failure of Control Rods to 80-17 to Insert During a Scram at a
BWR 12/18/80 To specified BWRs with an OL 5 All BWRs with a CP 80-24 80-23 80-22 Prevention of Damage Due to Water Leakage Inside Containment (October 17, 1980 Indian Point 2
Event)
Failures of Solenoid Valves Hanufactured by Valcor Engineering Corporation Automation Industries, Hodel 200-520-008 Sealed-Source Connectors 11/21/80 11/14/80 9/11/80 All power reactor facilities with an OL, or CP All power reactor facilities with OL or CP All radiography licensees 80-21 Supplement 3
to 79-01B Supplement 2
to 79-01B Valve yokes supplied by 11/6/80 Halcolm Foundry