ML17275A867
| ML17275A867 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/02/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8103160191 | |
| Download: ML17275A867 (4) | |
Text
((~
Docket No~50-397 Mashington Publ.ic Power Supply ATTN:
Mr. R. L. Ferguson Managing Director 3000 George Washington Nay P. 0.
Box 968
- Richland, Washington 993S2
SUBJECT:
RE/VEST FOR MATERIAL Dist.
/Dock~et FFiiliee TERA filAR p *l9S1 NRC/PDR L/PDR ED LB¹I Rdg P
DEisenhut BJYoungblood ii DLycch Sy Ji~~
U 9
MRushbrook
't O.d t99 ~ 'Tedesco RVollmer TMurley DRoss RHartfield, MPA VNoonan PROPERTIES OF THE NNP-2 PRIMARY CONTAINMENT OELD OIE (3) bcc:
TERA NSIC TIC ACRS (16 In our letter to you, dated October 30, 1980, we requested detailed information about the design and construction of the MNP-2 free-standing, steel containment.
This request was in support of TMI Action Plan Task II.B.
i<hiIe we received most of the information requested, you did not submit the material properties test reports for the steel shell and reinforcing members; i.e., Item 4 of our October 30th letter.
To assist you in responding on this matter, we are ident-ifing in this letter the six specific material properties which we seek.
These are the modulus of elasticity, Poisson's ratio, the yield stress, the ultimate stress and the fracture stress of the plates and reinforcing members which form the primary containment.
The latter material property is that value obtained under conditions of plane strain which can be used in a fracture mechanics analysis to determine whether a oc'rack will propagate or gross yielding will occur.
Additionally, provide >the value of the bolt yield stress.
If possible, present the requested material properties as a mean value and an associated standard deviation.
Additionally, indicate the type of statistical distribution employed (e.g.,
normal or log normal).
If you have any questions on this matter, please contact the Project Manager, M. D.. Lynch, at 301/492-8413.
Sincerely, original signed by
>r~ g. Miraglia It Robert L. Tedesco, Assistant Director for Licensing Division of Licensing 8188 189I OFFICEI SURNAME/
DATEP DL:LB¹1 0Lyh,ch/ps......
2/Zg/81 BJ.ou la 8
DL:
c+)
2 1
NRC FORM 338 RD/80) NRCM 024D OFF ICIAL R ECOR D COPY
- USGFO: 198~29.824
~ ~ r fggf i
/,~ff.)3~
rG.L<'"
i
Mr.
R. L. Ferguson Managing Director Washington Public Power Supply System P.
0.
Box 968 3000 George Washington Way Richland, Washington 99352 ccs:
Nicholas Reynolds, Esq.
Debevoise 5 Liberman 1200 Seventeenth
- Street, N.
W.
Washington, D.
C.
20036 Richard Q. Quigley, Esq.
Washington Public Power Supply System P.
0.
Box 968
- Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council 820 East Fifth Avenue Olympia, Washington 98504 Mr. 0.
K. Earle Licensing Engineer P. 0.
Box 968
- Richland, Washington 99352 Mr. Albert D. Toth Resident Inspector/HPPSS-2 NPS c/o U.
S. Nuclear Regulatory Commission P.
0.
Box 69
- Richland, Washington 99352
I V
m,
~
yg 9h i9'