ML17275A857
| ML17275A857 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/27/1981 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275A858 | List: |
| References | |
| NUDOCS 8103100029 | |
| Download: ML17275A857 (4) | |
See also: IR 05000397/1980022
Text
g P,R AECfyd
Wp0
as
lap ~P
a
+w*w+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94599
b(g
F>LA
January
27,
1981
Docket No. 50-397
>lashington Public
Power
Supply System
P.
0.
Box 968
Richland,
99352
Attention:
Mr.
R.
G. Matlock
Program Director,
MNP-2
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Mr. A. Toth of this office
during December,
1980 of activities authorized
by NRC Construction
Permit No.
CPPR-93,
and to the discussion of our findings held
by
Mr. Toth with Mr.
R. Johnson
and other
members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection're. described
in the enclosed
inspection report.
Hithin these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
in-
terviews with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section
2.790 of the NRC's'"Rules of Practice,"
Part
2, Title 10,
Code of Federal
Regulations,
a copy of this letty~ and
the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this report contains
any information that you believe to be
proprietary, it is necessary
that you submit
a written application to
this office, within 20 days of the date of this letter, requesting
that
such information be withheld from public disclosure.
The application
must include
a full statement of the reasons
why- it is claimed that the
information is proprietary.
The application should
be prepared
so that
any proprietary information identified 1's contained in an enclosure
to
the application,
since the application without the enclosure will also
be placed in the Public Document
Room. If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document
Room.
'0
L
I
n, W I
'~".f 'i
~Cg /
ll
Hashington Public Power
Supply System -2-
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincer ely,
Enclosure:
IE Inspection Report
No. 50-397/80-22
cc w/enclosure:
M.
E. 'Hitherspoon,
guality Assurance Director
H.
C. Bibb, Project Manager,
HNP-2
G.
S. Spencer,
Chief
Reactor
Construction
and
Engineering Support Branch