Forwards IE Insp Rept 50-397/80-22 on 801201-31.No Noncompliance Noted
ML17275A857
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/27/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A858 List:
References
NUDOCS 8103100029
Download: ML17275A857 (4)


See also: IR 05000397/1980022

Text

g P,R AECfyd

Wp0

as

lap ~P

a

+w*w+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94599

b(g

F>LA

January

27,

1981

Docket No. 50-397

>lashington Public

Power

Supply System

P.

0.

Box 968

Richland,

Washington

99352

Attention:

Mr.

R.

G. Matlock

Program Director,

MNP-2

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Mr. A. Toth of this office

during December,

1980 of activities authorized

by NRC Construction

Permit No.

CPPR-93,

and to the discussion of our findings held

by

Mr. Toth with Mr.

R. Johnson

and other

members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection're. described

in the enclosed

inspection report.

Hithin these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

in-

terviews with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section

2.790 of the NRC's'"Rules of Practice,"

Part

2, Title 10,

Code of Federal

Regulations,

a copy of this letty~ and

the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any information that you believe to be

proprietary, it is necessary

that you submit

a written application to

this office, within 20 days of the date of this letter, requesting

that

such information be withheld from public disclosure.

The application

must include

a full statement of the reasons

why- it is claimed that the

information is proprietary.

The application should

be prepared

so that

any proprietary information identified 1's contained in an enclosure

to

the application,

since the application without the enclosure will also

be placed in the Public Document

Room. If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document

Room.

'0

L

I

n, W I

'~".f 'i

~Cg /

ll

Hashington Public Power

Supply System -2-

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincer ely,

Enclosure:

IE Inspection Report

No. 50-397/80-22

cc w/enclosure:

M.

E. 'Hitherspoon,

guality Assurance Director

H.

C. Bibb, Project Manager,

HNP-2

G.

S. Spencer,

Chief

Reactor

Construction

and

Engineering Support Branch