ML17275A853
| ML17275A853 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/28/1981 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275A854 | List: |
| References | |
| NUDOCS 8103050729 | |
| Download: ML17275A853 (4) | |
See also: IR 05000397/1980019
Text
~P,A AEONS
Wp0
n
~f
O
gtg
+p*~+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
JAt] g 8
~g8~
Docket No. 50-397
Washington Public Power Supply System
P.
0.
Box 968
Richland, tlashington
99352
Attention:
Mr.
R. L. Ferguson
Managing Director
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Project
No.
2
This refers to the inspection
conducted
by Messrs.
D.
P. Haist, tl. J.
Wagner
and A. J.
D'Angelo of this office on November 4-7,
1980 of activities
authorized
by
NRC Construction Permit No.
CPPR-93,
and to the discussion of
their findings with Nr. H.
C. Bibb and other members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection report.
Within these areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
intev-
views with personnel,- and observations
by the inspector.
No items of noncompliance with NRC requirements
weve identified within
the scope of this inspection.
In accordance
with Section 2.790 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report, will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is'ecessary
that you submit
a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must inc'lude
a full statement of the reasons
why it is claimed that
tl
C
'0
f
i+it
elk
e
~s
!
~ s~"
N
4
Waghington Public Power Supply System
-2-
JAN 28
1981
the information is proprietary.
The application should
be prepared
so
that any proprietary information identified is contained in an enclosure
to the application,
since the application without the enclosure will
also
be placed in the Public Document
Room.
If we do not hear
from you
in this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
G.
S.
Spe'neer,
Chief
Reactor
Construction
and
Engineering
Support
Branch
Enclosure:
IE Inspection Report
No. 50-397/80-19
cc w/o enclosure:
M.
E. Witherspoon, guality Assurance Director
W.
C. Bibb, Project Manager
WNP-2 Project