Forwards IE Insp Rept 50-397/80-19 on 801104-07.No Noncompliance Noted
ML17275A853
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/28/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A854 List:
References
NUDOCS 8103050729
Download: ML17275A853 (4)


See also: IR 05000397/1980019

Text

~P,A AEONS

Wp0

n

~f

O

gtg

+p*~+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

JAt] g 8

~g8~

Docket No. 50-397

Washington Public Power Supply System

P.

0.

Box 968

Richland, tlashington

99352

Attention:

Mr.

R. L. Ferguson

Managing Director

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project

No.

2

This refers to the inspection

conducted

by Messrs.

D.

P. Haist, tl. J.

Wagner

and A. J.

D'Angelo of this office on November 4-7,

1980 of activities

authorized

by

NRC Construction Permit No.

CPPR-93,

and to the discussion of

their findings with Nr. H.

C. Bibb and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

intev-

views with personnel,- and observations

by the inspector.

No items of noncompliance with NRC requirements

weve identified within

the scope of this inspection.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report, will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is'ecessary

that you submit

a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must inc'lude

a full statement of the reasons

why it is claimed that

tl

C

'0

f

i+it

elk

e

~s

!

~ s~"

N

4

Waghington Public Power Supply System

-2-

JAN 28

1981

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear

from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

G.

S.

Spe'neer,

Chief

Reactor

Construction

and

Engineering

Support

Branch

Enclosure:

IE Inspection Report

No. 50-397/80-19

cc w/o enclosure:

M.

E. Witherspoon, guality Assurance Director

W.

C. Bibb, Project Manager

WNP-2 Project