Docket No. 50-397
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94696
January
9,
1981'ashington
Public Power Supply system
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr. R.
G. Matlock
t!NP-2 Program Director
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Mr. A. Toth of this office during
November
1980 of activities authorized
by
NRC Construction Permit No.
CPPR-93,
and to the discussion of our findings held by Mr. Toth with Mr. R. Johnson
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described
in the enclosed
inspection
report.
Mithin these areas,
the inspection consisted of selective examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No items of noncompliance with NRC requirements
were identified witnin the
scope of this inspection.
In accordance
with Section 2.790 of the
HRC's "Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter
and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this
report contains
any information that you believe to be proprietary, it is
necessary
that you submit
a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared
so that any proprietary information identified is contained in
an enclosure to the application, since the application without the enclosure
will also
be placed in the Public Document
Room. If we do not hear from
you in this regard within the specified period, the report will be placed
in the Public Document
Room.
sxoso40Ã7
t
N
lffI
n
1>
Ib
~ q
'.ll
Washington Public Power Supply System
-2-
January
9,
1981
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Report
No. 50-397/80-20
cc w/enclosure:
tl. E. >litherspoon
equal ity Assurance
Director
G. S. Spencer,
Chief
i
Reactor Construction
and Engineering
Support
Branch
(