Forwards IE Insp Rept 50-397/80-20 on 801101-30.No Noncompliance Noted
ML17275A849
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/09/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A851 List:
References
NUDOCS 8103040207
Download: ML17275A849 (4)


See also: IR 05000397/1980020

Text

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94696

January

9,

1981'ashington

Public Power Supply system

P. 0.

Box 968

Richland, Washington

99352

Attention:

Mr. R.

G. Matlock

t!NP-2 Program Director

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Mr. A. Toth of this office during

November

1980 of activities authorized

by

NRC Construction Permit No.

CPPR-93,

and to the discussion of our findings held by Mr. Toth with Mr. R. Johnson

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described

in the enclosed

inspection

report.

Mithin these areas,

the inspection consisted of selective examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

No items of noncompliance with NRC requirements

were identified witnin the

scope of this inspection.

In accordance

with Section 2.790 of the

HRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report contains

any information that you believe to be proprietary, it is

necessary

that you submit

a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared

so that any proprietary information identified is contained in

an enclosure to the application, since the application without the enclosure

will also

be placed in the Public Document

Room. If we do not hear from

you in this regard within the specified period, the report will be placed

in the Public Document

Room.

sxoso40Ã7

t

N

lffI

n

1>

Ib

~ q

'.ll

Washington Public Power Supply System

-2-

January

9,

1981

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/80-20

cc w/enclosure:

tl. E. >litherspoon

equal ity Assurance

Director

G. S. Spencer,

Chief

i

Reactor Construction

and Engineering

Support

Branch

(