ML17275A846
| ML17275A846 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/04/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275A842 | List: |
| References | |
| NUDOCS 8103030799 | |
| Download: ML17275A846 (4) | |
See also: IR 05000397/1980016
Text
s ~
gC ~8 RE0II
fp
+
0
Cy
I
O
I
cO
y0 <
0
e+
+st*++
/j
UNITED STATES
NUCLEAR REGULATORY COMMISSlON
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
q 'i980
Docket No. 50-397
Washington Public Power Supply System
P.
0.
Box 968
Richland,
99352
Attention:
Mr.
R. L. Ferguson
Managing Director
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Project
No.
2
This refers to the inspection
conducted
by Mr. A. Toth of this office during
September
1-30,
1980 ot activities authorized
by
NRC Construction
Permit No.
CPPR-93,
and to the discussion of our findings held by Mr. Toth with Mr. W.
C.
Bibb and other
members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective examinations
of procedures
and representative
records, inter views with personnel,
and
observations
by the inspector.
Based
on the results of this inspection, it appears'hat
one of your activities
was not conducted
in full compliance with NRC requi rements,
as set forth in
the Notice of Violation, enclosed
herewith as Appendix A.
This item of
noncompliance
has
been categorized
into a level
as described
in our correspondence
to all
NRC licensees
dated
December
31,
1974.
This notice is sent to you pursuant to the provisions of Section 2.201, of
the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations.
Section 2.201 requires
you to submit to this office, within thirty (30) days
of your receipt of this notice,
a written statement
or explanation in reply
including (1) corrective steps
which have
been
taken
by you and the results
achieved;
2) corrective steps
which will be taken to avoid further violations;
and (3) the date
when full compliance will be achieved.
r
~ A
~
yl g
l
'l
s'
!
Washington Public Power Supply System
-2-
"~)iV:1 /gal{}
In accordance
with Section 2.790 of the
HRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room.
If this
report contains
any information that you believe to be proprietary, it is
necessary
that you submit
a written application to this office, within 30 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include
a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared
so that any proprietary
information identified is contained in an
enclosure
to the applicatiorf,.since
the application without the enclosure will
also
be placed in the Public Document
Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document
Room.
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Enclosures:
A.
B.
IE Inspection
Report
No. 50-397/80-16
L~
G.
S. Spencer,
Chief
Reactor Construction
and Engineering
Support
Branch
cc w/o enclosure
B:
M. E. Witherspoon,
Divisi on Manager
equality Assurance,
'W.
C. Bibb, Manager
WNP-2 Project
(
0