Forwards IE Insp Rept 50-397/80-16 on 800901-30 & Notice of Violation
ML17275A846
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/04/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A842 List:
References
NUDOCS 8103030799
Download: ML17275A846 (4)


See also: IR 05000397/1980016

Text

s ~

gC ~8 RE0II

fp

+

0

Cy

I

O

I

cO

y0 <

0

e+

+st*++

/j

UNITED STATES

NUCLEAR REGULATORY COMMISSlON

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

q 'i980

Docket No. 50-397

Washington Public Power Supply System

P.

0.

Box 968

Richland,

Washington

99352

Attention:

Mr.

R. L. Ferguson

Managing Director

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project

No.

2

This refers to the inspection

conducted

by Mr. A. Toth of this office during

September

1-30,

1980 ot activities authorized

by

NRC Construction

Permit No.

CPPR-93,

and to the discussion of our findings held by Mr. Toth with Mr. W.

C.

Bibb and other

members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective examinations

of procedures

and representative

records, inter views with personnel,

and

observations

by the inspector.

Based

on the results of this inspection, it appears'hat

one of your activities

was not conducted

in full compliance with NRC requi rements,

as set forth in

the Notice of Violation, enclosed

herewith as Appendix A.

This item of

noncompliance

has

been categorized

into a level

as described

in our correspondence

to all

NRC licensees

dated

December

31,

1974.

This notice is sent to you pursuant to the provisions of Section 2.201, of

the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201 requires

you to submit to this office, within thirty (30) days

of your receipt of this notice,

a written statement

or explanation in reply

including (1) corrective steps

which have

been

taken

by you and the results

achieved;

2) corrective steps

which will be taken to avoid further violations;

and (3) the date

when full compliance will be achieved.

r

~ A

~

yl g

l

'l

s'

!

Washington Public Power Supply System

-2-

"~)iV:1 /gal{}

In accordance

with Section 2.790 of the

HRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If this

report contains

any information that you believe to be proprietary, it is

necessary

that you submit

a written application to this office, within 30 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include

a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared

so that any proprietary

information identified is contained in an

enclosure

to the applicatiorf,.since

the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosures:

A.

Notice of Violation

B.

IE Inspection

Report

No. 50-397/80-16

L~

G.

S. Spencer,

Chief

Reactor Construction

and Engineering

Support

Branch

cc w/o enclosure

B:

M. E. Witherspoon,

Divisi on Manager

equality Assurance,

WPPSS

'W.

C. Bibb, Manager

WNP-2 Project

(

0