ML17275A823
| ML17275A823 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/23/1981 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8102190467 | |
| Download: ML17275A823 (1) | |
Text
~pA RECy
~
(4 tpo Cy p1~
0 pe
'+n +***+
UNITED STATES
~
NUCLEAR REGULATORY COMMISSION IREGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 January 23, 1981 Docket No.
50-397 Washington Public Power Supply System P.
0.
Box 968 3000 George Washington Way
- Richland, Washington 99352 Attention:
Mr.
R.
G. Matlock Program Director, WNP-2 Gentlemen:
The enclosed IE Circular No. 81-01 contains recommendations that may be applicable to your facility with regard to design problems associated with the subject indicating pushbutton switches.
Should you have any questions regarding this circular or the recommendations contained
- therein, please contact this office.
Sincerely, R.
H. Engelken Director
Enclosures:
1.
IE Circular No. 81-01 2.
Recently issued IE Circulars cc w/enclosures:
M.
E. Witherspoon W.
C. Bibb G.
C. Sorensen g -9 I t-.~
.'gg(i%b "-
JgII9'i'I9III~
~ II1gJQ5QN II'~>pWlgI08