Forwards IE Insp Rept 50-397/80-18 on 801001-31.No Noncompliance Noted
ML17275A808
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/16/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A809 List:
References
NUDOCS 8101290643
Download: ML17275A808 (3)


See also: IR 05000397/1980018

Text

~s nehru

0

Cy

n0l

(o

n +**++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

('ecember

16,

1980

Docket No. 50-397

Washington Public Power

Suoply System

P. 0.

8ox 968

Richland, Washington

99352

Attention:

Mr.

R.

G. Matlock

Program Director,

WNP-2

t

Gentlemen:

Subject:

NRC Inspection of Washington Nuclear Project

No.

2

This refers to the inspection

conducted

by Mr. A. Toth of this office

during October

1980 of activities authorized

by

NRC Construction

Permit

No.

CPPR-93,

and to the discussion of our findings held by Mr. Toth with

Mr.

R. Johnson

and other members of your staff at the conclusion of the

inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records, inter-

views with personne'),

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office; within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

the i nformation is proprietary.

The application should

be prepared

so

Wasington Public Power Supply System

-2-

December

16,

1980

that any proprietary information identified is contained

in an enclosure

to the application,

since the application without'the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

.

Enclosure:

IE Inspection Report

No.'50-397/80-18

P Jl

G.

S.

Spencer,

Chief

Reactor Construction

and

Engineering

Support Branch

cc w/o enclosure:

M.

E. Witherspoon, guality Assurance

Director

W.

C. Bibb, Project Manager

WNP-2 Project