ML17275A808
| ML17275A808 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/16/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275A809 | List: |
| References | |
| NUDOCS 8101290643 | |
| Download: ML17275A808 (3) | |
See also: IR 05000397/1980018
Text
~s nehru
0
Cy
n0l
(o
n +**++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
('ecember
16,
1980
Docket No. 50-397
Washington Public Power
Suoply System
P. 0.
8ox 968
Richland, Washington
99352
Attention:
Mr.
R.
G. Matlock
Program Director,
WNP-2
t
Gentlemen:
Subject:
NRC Inspection of Washington Nuclear Project
No.
2
This refers to the inspection
conducted
by Mr. A. Toth of this office
during October
1980 of activities authorized
by
NRC Construction
Permit
No.
CPPR-93,
and to the discussion of our findings held by Mr. Toth with
Mr.
R. Johnson
and other members of your staff at the conclusion of the
inspection.
Areas
examined during this inspection are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records, inter-
views with personne'),
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit
a written application
to this office; within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include
a full statement of the reasons
why it is claimed that
the i nformation is proprietary.
The application should
be prepared
so
Wasington Public Power Supply System
-2-
December
16,
1980
that any proprietary information identified is contained
in an enclosure
to the application,
since the application without'the enclosure will
also
be placed in the Public Document
Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
.
Enclosure:
IE Inspection Report
No.'50-397/80-18
P Jl
G.
S.
Spencer,
Chief
Reactor Construction
and
Engineering
Support Branch
cc w/o enclosure:
M.
E. Witherspoon, guality Assurance
Director
W.
C. Bibb, Project Manager
WNP-2 Project