ML17275A790
| ML17275A790 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/24/1980 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275A791 | List: |
| References | |
| NUDOCS 8101210110 | |
| Download: ML17275A790 (3) | |
See also: IR 05000397/1980021
Text
-gpss AEVI
~c"
Wp0
0O
+
I
I
"o'W
@yg
++**+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
IrvALNUTcREEK, cALIFDRNIA94596
8
/
December
24,
1980
Docket No. 50-397
Washington Public Power Supply System
P.
0.
Box 968
Richland, Washington
99352
Attention:
R.
G. Matlock
Program Director,
WNP-2
Gentlemen:
Subject:
NRC Inspection of WNP-2 (Preoperational
Test Phase)
This refers to the inspection
conducted
by Hr. J.
Garison of this
office on December 2-4,
1980, of activities authorized
by
NRC Construction
Permit No.
CPPR-93,
and to the discussion of our findings held by the
inspector with Hr.
G. Afflerbach and other members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Within these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,'
copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this report contains
any information that you believe to be
proprietary, it is necessary
that you submit
a written application to
this office, within 20 days of the date of this letter, requesting
that
such information be withheld from public disclosure.
The application
must include
a full statement of the reasons
why it is claimed that the
information is proprietary.
The application should
be prepared
so that
any proprietary information identified is contained in an enclosure
to
the application,
since the application without the enclosure
wi11 also
be placed in the Public Document
Room.
If we do not hear from you in
this regard within the specified period, the reqport will be placed in
the Public Document
Room.
Washington Public Power Supply System -2-
QEC 24 5g
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Si der ly,
<<J.
Lq
C ews, Chief
Reactor Operations
and Nuclear
Support Branch
Enclosure:
IE Inspection Report
No. 50-397/80-21
cc w/o enclosure:
K. T. Perkins,
HPPSS
J.
D. Martin,
LIPPSS
'4r'et
- I"
4
V
g
0
~
~
E
J
E*
'I
~
~ I
0
- ~
03
'
'%hi&!.1
lA
. 8g
'tl
'tAW
4 )7
%%
1 '
'll 0 lt'ACAI
0