Forwards IE Insp Rept 50-397/80-21 on 801202-04.No Noncompliance Noted
ML17275A790
Person / Time
Site: Columbia 
Issue date: 12/24/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A791 List:
References
NUDOCS 8101210110
Download: ML17275A790 (3)


See also: IR 05000397/1980021

Text

-gpss AEVI

~c"

Wp0

0O

+

I

I

"o'W

@yg

++**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

IrvALNUTcREEK, cALIFDRNIA94596

8

/

December

24,

1980

Docket No. 50-397

Washington Public Power Supply System

P.

0.

Box 968

Richland, Washington

99352

Attention:

R.

G. Matlock

Program Director,

WNP-2

Gentlemen:

Subject:

NRC Inspection of WNP-2 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Hr. J.

Garison of this

office on December 2-4,

1980, of activities authorized

by

NRC Construction

Permit No.

CPPR-93,

and to the discussion of our findings held by the

inspector with Hr.

G. Afflerbach and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,'

copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any information that you believe to be

proprietary, it is necessary

that you submit

a written application to

this office, within 20 days of the date of this letter, requesting

that

such information be withheld from public disclosure.

The application

must include

a full statement of the reasons

why it is claimed that the

information is proprietary.

The application should

be prepared

so that

any proprietary information identified is contained in an enclosure

to

the application,

since the application without the enclosure

wi11 also

be placed in the Public Document

Room.

If we do not hear from you in

this regard within the specified period, the reqport will be placed in

the Public Document

Room.

Washington Public Power Supply System -2-

QEC 24 5g

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Si der ly,

<<J.

Lq

C ews, Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

IE Inspection Report

No. 50-397/80-21

cc w/o enclosure:

K. T. Perkins,

HPPSS

J.

D. Martin,

LIPPSS

'4r'et

  • I"

4

V

g

0

~

~

E

J

E*

'I

~

~ I

0

  • ~

03

'

'%hi&!.1

lA

. 8g

'tl

'tAW

4 )7

%%

1 '

'll 0 lt'ACAI

0