ML17275A727
| ML17275A727 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/21/1980 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8012040695 | |
| Download: ML17275A727 (4) | |
Text
NOV p 1 1980 Docket No.:
50-397 Washington Public Power Supply System ATTN:
Hr. BciL.CFeS)usorl Managing Director P. 0.
Box 968 Richland, Washington 99352
Dear Hr. Eirguson:
DISTRIBUTION:
Docket File.-DR LBII1 Rdg FSchroeder NRR Rdg JKnight DEisenhut
- RTedesco, RPurple VNoonan JYounqblood RHartfi'eld, MDLynch OELD MRushbrook OIE (3)
PCheck LRubenstein ASchwencer JMiller FMiraglia RVollmer TMurley bcc:
HPA.
C3 I
4/l Po~
mme
)~CIICo m
AI TERA NRC/PDR L/PDR NSIC TIC ACRS (16)
SUBJECT:
NRC REVIEW SCHEDULAR REQUIREMENTS FOR SPECIAL LOll POWER TEST PROGRAHI AND EHERGENCY PROCEDURES To accomp'lish timely review of your application, it is necessary that the following schedular requirements be met..
These requirements specifically relate to NRC review of your Special Low Power Test Program and Emergency Procedures for selected transients and accidents.
The following lead times must be met ff our evaluations are to be completed on a schedule consistent with your schedule for performing tests and proceeding with the power ascension program above 5X of full power.
t 1.
Procedures for conducting the Special Low Power Test Program must be submitted at least 4 weeks prior to authorization to perform the test.
2.
Revised emergency procedures prepared in accordance with staff comments must be submitted at least seven weeks prior to completing our review; procedures walk-throughs in your control room must be completed at least 2 weeks prior to issuance of a full power operating license.
3.
The results of the Special Low Power Test Program must be submitted for NRC review 2 weeks prior to proceeding above 5X of full power.
Implicit in the above requirements is. the assumption that NRC requests for any additional information on the above matters will be answered in 1-1 1/2 weeks.
Sincerely, OriginIIi sign0g i Iro50I"t 7, Tc cc:
See next pa e
Robert L. Tedesco, Assistant Director for Licensing Division of Licensing OFFI SURNAME
.1 ]
~
DATE/...,.......
NRC FORM 318 I9-76) NRCM 0240 I
DL:
s BJ
"" "'21 b oo 0'"'L:
RLT sco 1'1/~/80
'AU.S.
GOVERNMENT PRINTING OFFICE: 1979'289 369
I
~
ty
~t 4a C 'i, ~
II 4
...e, c>>>>.--
i~
C"3 CA'Q
~
~I 1+
U r
P
Nr.
R. L. Ferguson Managing Director Washington Publi'c Power Supply System P.
0.
Box 968 3000 George Washington Way Richland, Washington 99352 ccs:
Joseph B. Knotts, Jr.,
Esq.
Debevoise 5 Liberman 1200 Seventeenth
- Street, N.
W.
Washington, D.
C.
20036 Richard Q. Quigley, Esq.
Washington Public Power Supply System P. 0.
Box 968 Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council 820 East Fifth Avenue Olympia,.Washington 98504 Mr. 0.
K. Earle Licensing Engineer P.
0.
Box 968 Richland, Washington 99352 Mr. Albert D. Toth Resident Inspector/WPPSS-2 NPS clo U.
S. Nuclear Regulatory Commission
,. P.
0.
Box 69 Richland, Washington 99352