ML17272A926
| ML17272A926 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/24/1980 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17272A927 | List: |
| References | |
| NUDOCS 8004280272 | |
| Download: ML17272A926 (5) | |
See also: IR 05000397/1980005
Text
R<COc
Pp0
Cy
p %~
I
0O
h
P
0
, ++*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. N. 0. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection of WNP-2 (Preoperational
Test Phase)
This refers to the inspection
conducted
by Messrs.
P.
Johnson
and
J.
Carlson of this office on March 10-12,
1980, of activities authorized
by
NRC Construction
Permit No.
CPPR-93,
and to the discussion of our
findings held by the inspectors with Mr. J. Martin and other members of
your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, inter-
views with personnel,
and observations'y
the inspectors.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section
2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from, public disclosure.
The applica-
tion must include
a full statement
of the reasons
why it is claimed that
the information is proprietary.
The application should
be prepared
so
808428p
Q ~+@,
e
0
Washington Public Power Supply System
that any proprietary information identified is contained in an enclosure
to the application,
since the application without the enclosure .will
also
be placed in the Public Document
Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Report
No. 50-397/80-05
cc w/o enclosure:
K. T. Perkins, Assistant Director,
Generation,
HPPSS
J.
D. Martin, Plant Manager,
l!NP-2
eacto
Operations
and
Nuclear Support Branch
ALITY CLASS t MATPRIAL AND
BS
-0
CONTRACTOR SUPPLIED
PRE-PURCHASED
-ONSTRUCTION tNSTALI.ATION
NO PURTHER
ACTION REQUIRED
PROGRAM APPROVED
BY
NRC
NO PURTHER
ACTION REQUt
IS
IS A CRI-
ICAL CONSTRUCTION
ACTIVtTY
YES.
NO FURTHER
NO
ACTION REQUIRED
IS
ACTIVITY OR
MATERIAL/ITEM
S
CRITICAL?
REVIEW IOB of
CRITICAL RECORD
AS REQUIRED
QZ.O
COVERED SY
OTHER OVERALL RE-
INSPECTIONS/
EVALUATIONS
~22
NO
REVIEW IOT of
CRITICAL RECORD
AS REQUIRED
COVERED
BY
.OTHER OVERALL RE-
.INSPECTIONS/EVALUATIONS
.S.BASELINE,RAYCHEN
NEVI~ CRITICAL
SITE~NEO
RECO~
ING IN-
UN PERFORMED
NO
BY THE CONTRACTOR
IDENTIFI CRITICAL INSPECTION
ACTIVITIES- REI"ISPECT
MATERIAL/ITEMSIRECORDS
REVIEW
No
IDENTIFY
CRITICAL
RECORDS
REVIEW
CRITICAL RECORDS
IN VENDOR'S
SHOP
YES
CRITICAL
RECORDS
RETAINED BY THE
VENDOR(S)
NO
IS
CONTRACTOR'
CEIVCNG INSPECTION
EQUATE SUFFICIENT
DEPTH
YES
SAMP
REINSPECT
CRIT~ MATERIAL
ITIVE
NO
Zp
.'tATERIAL/ITEMS
Q
IDENTIFY CRITICAL INSPECTION
ACTIVITIES,REINSPECT
NO FURTHER
CTION REQUI
NO
ARE
DEPICIENCIES
IDENTIFIED
YES
NO PURTHER
NO
ACTION REQUIRED
ARE
ANY -='ICIENCIES
- NTIFIED
INCREASE
SAMPLE SIZE
AS RE UIRED
ADDRESS SIGNIfICANCE OF
PROBLEMS AND DETERMINE
CORRECTIVE ACTION(S)
W
P
B I
POWER
S
PL
STEM
P
PROGRAM
7-80
9'O~ L)Z$ O)- l~