ML17272A926

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/80-05 on 800310-12.No Noncompliance Noted
ML17272A926
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/24/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A927 List:
References
NUDOCS 8004280272
Download: ML17272A926 (5)


See also: IR 05000397/1980005

Text

R<COc

Pp0

Cy

p %~

I

0O

h

P

0

, ++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP-2 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Messrs.

P.

Johnson

and

J.

Carlson of this office on March 10-12,

1980, of activities authorized

by

NRC Construction

Permit No.

CPPR-93,

and to the discussion of our

findings held by the inspectors with Mr. J. Martin and other members of

your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations'y

the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from, public disclosure.

The applica-

tion must include

a full statement

of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

808428p

Q ~+@,

e

0

Washington Public Power Supply System

that any proprietary information identified is contained in an enclosure

to the application,

since the application without the enclosure .will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/80-05

cc w/o enclosure:

K. T. Perkins, Assistant Director,

Generation,

HPPSS

J.

D. Martin, Plant Manager,

l!NP-2

eacto

Operations

and

Nuclear Support Branch

ALITY CLASS t MATPRIAL AND

BS

-0

CONTRACTOR SUPPLIED

PRE-PURCHASED

-ONSTRUCTION tNSTALI.ATION

NO PURTHER

ACTION REQUIRED

QA

PROGRAM APPROVED

BY

NRC

NO PURTHER

ACTION REQUt

IS

IS A CRI-

ICAL CONSTRUCTION

ACTIVtTY

YES.

NO FURTHER

NO

ACTION REQUIRED

IS

ACTIVITY OR

MATERIAL/ITEM

S

CRITICAL?

REVIEW IOB of

CRITICAL RECORD

AS REQUIRED

QZ.O

COVERED SY

OTHER OVERALL RE-

INSPECTIONS/

EVALUATIONS

~22

NO

REVIEW IOT of

CRITICAL RECORD

AS REQUIRED

COVERED

BY

.OTHER OVERALL RE-

.INSPECTIONS/EVALUATIONS

.S.BASELINE,RAYCHEN

NEVI~ CRITICAL

SITE~NEO

RECO~

ING IN-

SPECT

UN PERFORMED

NO

BY THE CONTRACTOR

IDENTIFI CRITICAL INSPECTION

ACTIVITIES- REI"ISPECT

MATERIAL/ITEMSIRECORDS

REVIEW

No

IDENTIFY

CRITICAL

RECORDS

REVIEW

CRITICAL RECORDS

IN VENDOR'S

SHOP

YES

CRITICAL

RECORDS

RETAINED BY THE

VENDOR(S)

NO

IS

CONTRACTOR'

CEIVCNG INSPECTION

EQUATE SUFFICIENT

DEPTH

YES

SAMP

REINSPECT

CRIT~ MATERIAL

ITIVE

NO

Zp

.'tATERIAL/ITEMS

Q

IDENTIFY CRITICAL INSPECTION

ACTIVITIES,REINSPECT

NO FURTHER

CTION REQUI

NO

ARE

DEPICIENCIES

IDENTIFIED

YES

NO PURTHER

NO

ACTION REQUIRED

ARE

ANY -='ICIENCIES

NTIFIED

INCREASE

SAMPLE SIZE

AS RE UIRED

ADDRESS SIGNIfICANCE OF

PROBLEMS AND DETERMINE

CORRECTIVE ACTION(S)

W

P

B I

POWER

S

PL

STEM

P

IO

PROGRAM

7-80

9'O~ L)Z$ O)- l~