Forwards IE Insp Rept 50-397/79-19 on 791203-06.No Noncompliance Noted
ML17272A842
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/18/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A843 List:
References
NUDOCS 8003060618
Download: ML17272A842 (4)


See also: IR 05000397/1979019

Text

~y,R RECIJ~

<c< <r

0

~Cy

A0O

+**++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99361

Attention:

Mr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP-2 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Messrs.

P. Johnson

and

J.

Garison of this office on December 3-6,

1979 of activities authorized

by

NRC Construction

Permit No.

CPPR-93,

and to the discussion of our

findings held by the inspectors with Mr. J. Martin and other members of

your staff at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within 'these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If this report contains

any information that you believe to be

proprietary, it is necessary

that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure.

The application

must include

a full statement of the reasons

why it is claimed that

goo3060 gP'

)

i

f

Washington Public Power Supply System

-2-

JAN 18

19M

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this i.nspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/79-19

cc w/o enclosure:

K. T. Perkins, Assistant Director,

Generation,

WPPSS

J.

D. Hartin, Plant Manager,

MNP-2

J.

L. Crews, Chief

Reactor Operations

and

Nuclear Support Branch

t