ML17272A806

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-25,Suppl a, Shock Arrestor Strut Assembly Interference. No Written Response Required
ML17272A806
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 01/31/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8002140107
Download: ML17272A806 (2)


Text

spy RECT

~-

~o Cy+

4V 0

,~ g

'4 C 8+

W~

ON Op

+~*~4 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94595 January 31, 1980 Docket Nos. 50-397, 50-460 50-513, 50-508, 50-509 Washington Public Power Supply System P. 0.

Hox 968 3000 George Washington Way

Richland, Washington 99352 Attention:

Hr. N. 0. Strand Managing Director Gentlemen:

The enclosed IE Circular No. 79-25 Supplement A is forwarded to you for in-formation.

No written response to this Circulai is required.

If you have any questions related to the subject, please contact this office.

Sincerely, cA R. H. Engelken Director

Enclosure:

IE Circular No. 79-25 Supplement A

cc w/enclosure:

A. D. Kohler, WPPSS G.

C. Sorensen, WPPSS J.

P.

Thomas, WPPSS W. J. Talbott, WPPSS M. E. Witherspoon, WPPSS 8008140 I G 7