ML17272A717

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Action Required
ML17272A717
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 11/08/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 7911260382
Download: ML17272A717 (1)


Text

6D,g RECOC Tp0>~i

~by( I cl UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 November 8, 1979 Docket Nos. 50-397, 50-460, 50-508 50-509, 50-513 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Attention:

Mr. N. 0. Strand Managing Director Gentlemen:

Enclosed is IE Bulletin No. 79-02, Revision 2 which requires action by you with regard to your power reactor facility(ies) with an operating license or a construction permit.

Should you have any questions regarding this Bulletin revision or the actions required by you, please contact this office.

Sincerely, R. H. Engelken Director

Enclosure:

IE Bulletin No. 79-02 Revision No.

2 cc w/enclosure:

M. E. Witherspoon, WPPSS A. D. Kohler, WPPSS J.

P.

Thomas, WPPSS W. J. Talbott, WPPSS G.

C. Sorensen, WPPSS