~~"<<cu
0
",:>~+g[g~t"i
++**~
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94595
September
27,
1979
Docket No. 50-397
'llashington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr. N. 0. Strand
Managing Director
Gentlemen:
.
Subject:
NRC Inspection at Washington Nuclear Project
No.
2
(WNP-2)
This refers to the inspection
conducted
by Messrs.
T. M. Bishop and
D.
P. Haist of this office on August 6-9,
1979 of activities authorized
by NRC Construction Permit No.
CPPR-93,
and to the discussion of our
findings held by Mr. Bishop with Mr. A. D. Kohler and other members of
your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and repre'sentative
records, inter-
views with personnel,
and observations
by the inspectors
.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section
2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that. you believe
to be proprietary, it is necessary
that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include
a full statement of the reasons
why it is claimed that
the information is proprietary.
The application should
be prepared
so
that any proprietary information identified is contained in an enclosure
'Sv
C
t'
Washington Public Power Supply System
-2-
September
27,
1979
to the application,
since the application without the enclosure will
also
be placed in the Public Document
Room. If we do not hear
from you
in this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning
this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Encl osur e:
IE Inspection Report
No. 50-397/79-14
G. S. Spencer,
Chief
Reactor Construction
and
Engineering'upport
Branch
cc w/o enclosure:
fl. E. Witherspoon,
Division t1anager,
guality Assurance,
A. D. Kohler, Manager
WNP-2 Project,