ML17272A690

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Failure of Spent Fuel Pool Cooling Sys
ML17272A690
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/18/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17272A691 List:
References
GO2-79-191, NUDOCS 7910230482
Download: ML17272A690 (3)


Text

REGULATORY ORMATION DISTRIBUTION SY M (RIDS)

ACCESSIPA NBR:7910230482 DOC ~ DATE: 79/10/18 NOTARIZED; NO DOCKET FACIL.50-397 'WPPSS Nuclear Pro]ect~ Unit 2~ PIashington Public Powe 05000397 AUTH, NAME AUTHOR AFFILIATION RENBERGER,D,L. washington Public Power Supply System RECIP ~ NAME'ECIPIENT AFFILIATION ENGELKENtR ~ Hs Region 4i Dallas~ Office of the Director

SUBJECT:

Forwards interim deficiency rept re spent fuel pool coo'Iing sys ~

oIsTRISUTioN coDE,; so>9s covIss REcsIYEo:LTR I, EscL g Construction Deficiency Repor t (10CFR50,55E) sIzsi L 4J 'ITLE:

NOTES; 2 C WWWMSIWS\ + +L 0

I MATL.

MWMORMM\O~M~MWtMWMW 00\04$ 0$ 00%%%&WOMW~OWWMWQ\WWWW\fWWM&WO4'IA RECIPIENT COPIES RECIPIENT COPIES ACTION:

ID CODE/NAME 14 PM~ I- /AC H 20 LAl LTTR ENCL

] 15 BCL 21 AD L

~~M ID CODE/NAME

~~ Q LTTR ENCL 1

1 1

1 INTERNAI: F 1 1 02 NRC PDR 1 1 05 ISE 2 2 07 EDO L STAFF 1 1 08 NPA 1 1 09 DEPY DIR DPN 1 '1 10 QAB 1 1 11 STANDRDS DEV 1 1 12 JORDANgE/IE 1 1 13F IELD COOR/IE 1 1 16 AD FOR ENGR 1 1 17 AD PLANT SYS 1 1 17 AD REAC SFTY 1 1 22 DIR DPM 1 1 23 OELD 1 1 AD/SITE TECH 1 1 DIRECTOR DSE 1 GEOSC IENCES BR 1 1 I&C SYS BR 1 NATL ENG BR 1 1 MECH ENG BR 1 1 PONER SYS BR 1 1 S HANAUER 1 STRUCT ENG BR 1 1 EXTERNAL: 03 LPDR 1 1 04 NSIC 24 ACRS 1 6 16 g4>9't9 0g TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ NCI 89 8?tt( ~

J II ll

p Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. 8OX 9ee 3OOO 0CO. W*SHINCYON WAY RICHLAND, WASHINGTON 99352 PHONC (509) 375 5000

/

October 18, 1979 G02-79-191 Nuclear Regulatory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 Attention: Mr. R. H. Engelken, Director

Subject:

WPPSS NUCLEAR PROJECT NO. 2 DOCKET NUMBER 50-397, CPPR-93 REPORTABLE DEFICIENCY - 10CFR50.55(e)

Dear Mr. Engelken:

In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on September 21, 1979, of a reportable condition involving the spent fuel, pool cooling system which is not designed to Seismic Category 1 standards.

Attached is our report of this deficiency. Action to correct this condition is currently being evaluated. A final report of action taken will be forwarded to your office before November 30, 1979.

Please contact us if you have additional questions.

Very truly yours, D. L. RENBERGER Assistant Director Technology DLR/GLC/jdb

Attachment:

As stated cc: JJ Verderber - B&R, w/att JJ Byrnes - B&R, w/att JR Lewis - BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att WNP-2 Files, w/att

>910230 Qpg