ML17272A690

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Failure of Spent Fuel Pool Cooling Sys
ML17272A690
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/18/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17272A691 List:
References
GO2-79-191, NUDOCS 7910230482
Download: ML17272A690 (3)


Text

REGULATORY ORMATION DISTRIBUTION SY M (RIDS)

ACCESSIPA NBR:7910230482 DOC ~ DATE: 79/10/18 NOTARIZED; NO DOCKET FACIL.50-397

'WPPSS Nuclear Pro]ect~

Unit 2~ PIashington Public Powe 05000397 AUTH,NAME AUTHOR AFFILIATION RENBERGER,D,L.

washington Public Power Supply System RECIP ~ NAME'ECIPIENT AFFILIATION ENGELKENtR ~ Hs Region 4i Dallas~ Office of the Director

SUBJECT:

Forwards interim deficiency rept re spent fuel pool coo'Iing sys

~

oIsTRISUTioN coDE,;

so>9s covIss REcsIYEo:LTR I, EscL g sIzsi L 4 J

'ITLE:

Construction Deficiency Repor t (10CFR50,55E)

NOTES; 2 C

+ +L I

MATL.

WWWMSIWS\\ 0 MWMORMM\\O~M~MWtMWMW00\\04$ 0$00%%%&WOMW~OWWMWQ\\WWWW\\fWWM&WO4'IA RECIPIENT COPIES ID CODE/NAME LTTR ENCL ACTION:

14 PM~ I- /AC H

]

20 LAl RECIPIENT COPIES ID CODE/NAME LTTR ENCL 15 BCL~~M Q 1

1 21 AD L ~~

1 1

INTERNAI:

05 ISE 08 NPA 10 QAB 12 JORDANgE/IE 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD DIRECTOR DSE I&C SYS BR MECH ENG BR S

HANAUER F

1 1

2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 02 NRC PDR 07 EDO L STAFF 09 DEPY DIR DPN 11 STANDRDS DEV 13F IELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/SITE TECH GEOSC IENCES BR NATL ENG BR PONER SYS BR STRUCT ENG BR 1

1 1

1 1

'1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: 03 LPDR 24 ACRS 1

1 1 6 16 04 NSIC 0g g4>9't9 89 TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

NCI 8?tt(

~

J II ll

p Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. 8OX 9ee 3OOO 0CO. W*SHINCYON WAY RICHLAND, WASHINGTON 99352 PHONC (509) 375 5000

/

October 18, 1979 G02-79-191 Nuclear Regulatory Commission Region V

Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 Attention:

Mr.

R.

H. Engelken, Director

Subject:

WPPSS NUCLEAR PROJECT NO.

2 DOCKET NUMBER 50-397, CPPR-93 REPORTABLE DEFICIENCY - 10CFR50.55(e)

Dear Mr. Engelken:

In accordance with the provisions of 10CFR50.55(e),

your staff was informed by telephone on September 21, 1979, of a reportable condition involving the spent fuel, pool cooling system which is not designed to Seismic Category 1 standards.

Attached is our report of this deficiency.

Action to correct this condition is currently being evaluated.

A final report of action taken will be forwarded to your office before November 30, 1979.

Please contact us if you have additional questions.

Very truly yours, DLR/GLC/jdb

Attachment:

As stated D. L.

RENBERGER Assistant Director Technology cc:

JJ Verderber - B&R, w/att JJ Byrnes - B&R, w/att JR Lewis - BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att WNP-2 Files, w/att

>910230 Q p g