GO2-79-191, Forwards Deficiency Rept Re Spent Fuel Pool Cooling Sys Not Designed to Category 1 Seismic Stds
| ML17272A712 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/18/1979 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17272A710 | List: |
| References | |
| GO2-79-191, NUDOCS 7911200051 | |
| Download: ML17272A712 (1) | |
Text
55 P. O. ODX 9OO 3000 GL'O. WASHINC'ION WAY RICHLAND, WASHINCTDN 99353 PHOHC (509) 375.5000 Washington Public Power Supply System A JOINT OPERATING AGENCY Nucl ear Regulatory Commission Region V
Office of,Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 October 18, 1979 602-79-191 Attention:
Mr. R.
H. Engelken, Director
Subject:
MPPSS NUCLEAR PROJECT NO.
2 DOCKET NUMBER 50-397, CPPR-93 REPORTABLE DEFICIENCY - 10CFR50.55(e) c)- g,-
Dear. Mr'. Engelken:
In accordance with the provisions of 10CFR50.55(e),
your staff was informed by telephone on September 21, 1979, of a reportable condition involving the spent fuel pool cooling system which is not designed to Seismic Category 1 standards.
Attached is our report of this deficiency.
Action to correct this condition is currently being evaluated.
A final report of action taken will be forwarded to your office before November 30, 1979.
Please contact us if you have additional questions.
Very truly yours, DLR/GLC/jdb
Attachment:
As stated D. L.
RENBERGER Assistant Director Technology cc:
JJ Verderber - BSR, w/att JJ Byrnes - BER, w/att JR Lewis - BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att MNP-2 Files, w/att Vesta OD 05 L 5'-I 2-9