GO2-79-191, Forwards Deficiency Rept Re Spent Fuel Pool Cooling Sys Not Designed to Category 1 Seismic Stds

From kanterella
(Redirected from GO2-79-191)
Jump to navigation Jump to search
Forwards Deficiency Rept Re Spent Fuel Pool Cooling Sys Not Designed to Category 1 Seismic Stds
ML17272A712
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/18/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A710 List:
References
GO2-79-191, NUDOCS 7911200051
Download: ML17272A712 (1)


Text

55 P. O. ODX 9OO 3000 GL'O. WASHINC'ION WAY RICHLAND, WASHINCTDN 99353 PHOHC (509) 375.5000 Washington Public Power Supply System A JOINT OPERATING AGENCY Nucl ear Regulatory Commission Region V

Office of,Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 October 18, 1979 602-79-191 Attention:

Mr. R.

H. Engelken, Director

Subject:

MPPSS NUCLEAR PROJECT NO.

2 DOCKET NUMBER 50-397, CPPR-93 REPORTABLE DEFICIENCY - 10CFR50.55(e) c)- g,-

Dear. Mr'. Engelken:

In accordance with the provisions of 10CFR50.55(e),

your staff was informed by telephone on September 21, 1979, of a reportable condition involving the spent fuel pool cooling system which is not designed to Seismic Category 1 standards.

Attached is our report of this deficiency.

Action to correct this condition is currently being evaluated.

A final report of action taken will be forwarded to your office before November 30, 1979.

Please contact us if you have additional questions.

Very truly yours, DLR/GLC/jdb

Attachment:

As stated D. L.

RENBERGER Assistant Director Technology cc:

JJ Verderber - BSR, w/att JJ Byrnes - BER, w/att JR Lewis - BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att MNP-2 Files, w/att Vesta OD 05 L 5'-I 2-9