ML17272A427

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-07, Seismic Stress Analysis of Safety-Related Piping. Licensee Action Required
ML17272A427
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 04/14/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 7905070110
Download: ML17272A427 (1)


Text

6I,R IlKDy

~

~C Wp f)'l o

."::.'JIN<P,.="

++*+~

KITED STATF.S NUCLEAR REGULATORY COMMISSION*

REGION V SUITE 202, V/ALNUTCREEK PLAZA 1990 N. CALIFORNIA IIOULEVARO lVALNUTCREEK, CALIFORNIA 94596 April 14, 1979 Docket t~

.'50-4

7 8, 50-50

, 50-513 Hashington Public Power Supply System P. 0.

Box 968 3000 George Hashington Hay Richland, Hashington 99352 Attention:

Mr. N. 0. Strand Managing Director Gentlemen:

Enclosed is IE Bulletin No. 79-07 which requires action by you with regard to your power reactor facility(ies) with an operating license or a construction permit.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely,

Enclosure:

IE Bulletin No. 79-07 with Enclosures A> >.~g=

R.

H. Engelken Director cc w/enclosure:

M. E. Hitherspoon, HPPSS A.

D. Kohler, HNP-2, HPPSS J.

P.

Thomas, HPPSS H. J. Talbot, HPPSS G.

C. Sorensen, HPPSS 79050'V'ot II'