UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
SUITE 202, WALNUTCREEK PLAZA
l990 N. CALIFORNIA BOULEVARD
WALNUT CREEK, CALIFORNIA 94596
JAN 24 85
Docket
No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Nr. N. 0. Strand
Managing Director
J
Gentlemen:
Subject:
NRC Inspection at Washington
Nuclear Project
No.
2
(WNP-2)
This refers to the inspection conducted
by Messrs.
T.
W. Bishop,
D. P. Haist and
G. Hernandez of this office on January 3-5, 1979, of
activities authorized
by
NRC Construction
Permit
No. CPPR-93,
and to
the discussion of our findings held by Hr. Bishop with Nr. A. D. Kohler
and other
members of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection report.
Within these
areas,
the inspection consi sted of
selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspectors.
Based
on 4he results of this inspection, it appears
that one of
your activities was not conducted
in full compliance with the
NRC
requirements,
as set forth in the Notice of Violation, enclosed
herewith
as Appendix A.
This item of noncompliance
has
been cate-
gorized into a level
as described
in our correspondence
to all
NRC
licensees
dated
December
31, 1974.
This notice is sent to you pursuant to the provisions of Section
2.201
of the
NRC 's "Rules of Practice," Part 2, Title 10,
Code of Federal
Regulations.
Section
2.201 requires
you to submit to this office,
within thirty (30) days of your receipt of this notice,
a written
statement
or explanation in reply including:
(1) corrective steps
>9082g Og(g
Washington Public
Power Supply System
-2-
J~t)'4 P g
which have
been taken
by you and the results achieved;
(2) corrective
steps
which will be taken to avoid fur'ther violations;
and (3) the
date
when full compliance will be achieved.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter
'nd
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room. If this report contains
any information that you be-
lieve to be proprietary, it is .necessary
that you'ubmit
a written
application to this office, within 30 days of. the date of this letter,
requesting that such information be withheld from public disclosure.
The application must include
a full statement
of the reasons
.why it
,is claimed that the information is proprietary.
The application
should .be prepared
so that any propr ietary information identified, is
contained in an enclosure
to the application,
since the application
without the enclosure will also
be placed in the Public Document
Room.
If we do not hear from you in this regard within the specified
per iod,
the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection,
.we will be
glad to discuss
them with you.
Sincerely,
Enclosures:
1.
Appendix A - Notice of Violation
2.
IE Inspection
Report
No. 50-397/79-01
cc w/o enclosure
2:
H. E. llitherspoon, Division Manager
guality Assuran'ce,
llPPSS
A. D. Kohler, Manager
lNP-2 Project
G. S. Spencer,
ev
Reactor Construction
and
Engineering
Support Branch*