ML17271A327
| ML17271A327 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 08/21/2017 |
| From: | Walton R NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Walton R | |
| Shared Package | |
| ML17068A434 | List: |
| References | |
| SVPLTR 17-0022 | |
| Download: ML17271A327 (2) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Station Date of Exam: 8/21/17 Operating Test No.: 2017-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U
- 1,4 RX 2
2 2
1 NOR 1
1 1
I/C 3,4 5,6 3,4 5
3,5 9
4 MAJ 7,8 7,8 7,8 6
2 TS 4,5 2
2 RO SRO-I SRO-U
- 2,5 RX 2
6 2
1 NOR 1
1 2
1 I/C 3,5 2,3 4,5 4,6 8
4 MAJ 7,8 7,8 7,8 6
2 TS 3,4 2
2 RO SRO-I SRO-U
- 3,6 RX 6
2 2
1 NOR 1
1 1
3 1
I/C 4,6 2
3,4 5,6 7
4 MAJ 7,8 7,8 7,8 6
2 TS 3,4 6
3 2
RO SRO-I SRO-U
- 7 RX 2
2 2
1 NOR 1
1 1
I/C 3,4 5,6 3,5 6
4 MAJ 7,8 7,8 4
2 TS 4,5 2
2 RO SRO-I SRO-U
- 8 RX 2
2 2
1 NOR 1
1 1
I/C 3,5 3,4 5,6 6
4 MAJ 7,8 7,8 4
2 TS 3,4 6
3 2
ES-301 Transient and Event Checklist Form ES-301-5 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.