Operating Reactors Business Line Fee Estimates Low Estimate of High Estimate Average Level of of Level of Estimate of Business Product Effort in Effort in Staff Level of Effort Line Line Activity Staff Hours* Hours* in Staff Hours* Examples Operating Licensing Amendments - simple 5 2,500 Reactors Operating Licensing NOEDs 7 40 15 Operating Licensing Exemptions 15 350 110 Reactors Operating Licensing NFPA-805 520 1,940 850 Reactors Operating Licensing License Transfers 75 370 170 Reactors Variation in the subjects of Operating Licensing Orders 20 75 35 amendments, providing an average is not useful.

Reactors Operating Licensing Relief Requests 5 400 Reactors Operating Licensing Power Uprates - 225 1,000 Reactors Measurement Uncertainty Recapture Operating Licensing Power Uprates - Stretch 600 2,500 Reactors Uprate Operating Licensing Power Uprates - EPU 4,000 7,500 Reactors Operating Licensing Research and Test NA NA 2,700 Focused review, e.g. DOW and Reactors Reactors/License USGS Renewals Operating Licensing Research and Test 18 200 109 Facility: Penn State (05-Reactors Reactors - Simple 005);1,100kw PWR level; LA

Title:

Amendments Penn State Amendment Exigent Request; TAC: ME9067

Operating Licensing Research and Test 201 500 350 Facility: MURR (50-186);10,000kw Reactors Reactors - Regular PWR level; LA

Title:

U. OF MO. -

Amendments MURR Request to Amend Tech.

Specs to Produce Medical I-131; TAC: MF6514 Operating Licensing Research and Test 501 1,170 743 Facility: Oregon (50-243);1,100kw Reactors Reactors - Complex PWR level; LA

Title:

OREGON ST, Amendments TRIGA MK II - fueled experiment amendment; TAC: ME8443 Operating Licensing Moly 99 Construction NA NA 22,000 SHINE Application Reactors Permit Review Operating Licensing Topical Reports- simple 250 700 600 Amendment to GESTAR Reactors Support Operating Licensing Topical Reports - med 500 2,000 1,350 Westinghouse. WCAP-17769, Reactors Support complex "Reference Fuel Design SVEA-96 Optima 3" Operating Licensing Topical Reports - high 2,000 4,000 3,000 Westinghouse. WCAP-17788, Reactors Support complex "Comprehensive Analysis and Test Program for GSI-191 Closure" Operating Oversight Baseline Inspections 1,625 2,100 1,863 This is relative to the number of Reactors plants, whether the site is a unique site, and/or is a BWR/PWR plant.

The estimate also does not include the recent new Design Basis Assurance inspection indicated separately below.

Operating Oversight Inspection Support 2,022 4,954 3,488 Documentation, Preparation, Reactors Activities Communication of Inspection, SDP, travel to site and Plant Status.

Numbers vary based on Regional and site needs.

Operating Oversight 95001 44 70 57 Reactive Inspections do not occur Reactors at each plant annually. Hours may range based of the severity of an Operating Oversight 95002 122 220 171 event.

Reactors Operating Oversight 95003 790 2,117 1,454 Reactors Operating Oversight Other Inspections and 40 330 185 Includes Event Response, IPE Reactors Assessment TI/SY, 95003 Follow-Up, IMC 0350, NRR Funded ISFSI Inspection, Assessment and Public Outreach

Operating Oversight Design Basis Assurance 765 1,035 900 The DBA inspection is new and was Reactors (DBA) Inspection: first implemented the beginning of Inspection Procedures CY17. As such these are 71111.21M and 71111.21N preliminary estimates. When additional actual data becomes available these estimates may be revised. The DBA inspection is a triennial inspection.

Operating Oversight Research and Test 4,500 5,760 5,130 Low estimate based on all docket-Reactors Reactors direct hours. High estimate includes inspector training, meetings, non-routine site visits, and enforcement and allegation actions, as well as special projects.