DOCKETO 05000335 i
05000389 I
REGULATORY FORMATION DISTRIBUTION SYIiM (RIBS)
ACCESSION NBR08003170250,DOCBDATE:
79/10/05 NOTARIZED:
NO FACIL:50-335 St ~ Lucie Planti Unj t li Florida Power 8 L'ight Co.
50 389 St ~ Lucia Planti Unit 2i Florida Power L Light Cos AUTH~ NAME, AUTHOR AFFILIATION MACDOUGALLiE~ A, Brookhaven National L'aboratory RECIP ~ NAME RECIPIENT AFFILIATION SYLVESTERrE ~
Plant Systems Branch SUBJECT!
Forwards J Towneley 790927 ltt re amount of hose at hose houses 8
inadequacy of breathing air sys,Concurs w/comments, DISTRIBUTION CODE:
A006S COPIES RECEIVED:LTR g ENCL'I SIZE!
TITLE: Fire Protection Information (After Issuance of OP, Lic ~
)
N
~ mw~mmwmmmmwmmmmmmmmmwwm MmWWMMWWM~ WMMWWFW&MWOOMMM~ W%a RECIPIENT ID COOK/HANK ACTION:
05 BC ~FIQ~ +
INTERNALS G
09 14 PLANT SYS BR 20 NURANAKAgR COPIES LTTR ENCL 1
1 2
2 5
5 1
1 02 NRC PDR 12 AUXIL SYS BR 19 NAMBACH OELD 1
1 2
2 1
1 1
0 RECIPIENT COPIES ID CODE/NAME LTTR ENCL EXTERNAL: 03 LPDR 22 ACRS 1
1 16 16 04 NSIC 1
1
'5C TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
~
I I
(<
tf g
ll
> I f
e F
W 'I" s
~
A II [
1
'il "
N l
gf II,
',I
<I i ',,
tlj
'0 P S C
k, 0,
- a~ ~
I
'$ I 1I'I' V
1 JCI
't II Il
.f-i!i:slR.~ "
g tl l'
~
'epartment of Nuclear Energy BROOKHAVEN NATIONALLABORATORY ASSOCIATED UNIVERSITIES, INC.
Upton, New York 11973 (51/) 345-2362 October 5, 1979 Mr. Ernest Sylvester Plant Systems Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Ernie:
Attached is a copy of John Townely's comments on the St. Lucie Nuclear Power Plant's manual systems.
We concur with his thoughts on both the amount of hose and other items required at the hose housesand the inadequacy of the breathing air system as presently described.
Very,truly yours, Edward A. MacDougall Reactor Engineering Analysis EAM:sd attachment cc.:
R.
Cerbone R.
Ferguson R. Hall W. Kato
- 6. Lainas wo/att.
8008170
W
,1 4
I' n
n"
SEP 27 1s79 JOHN P. TOWNLEY 913 Southeast 15th Court Deerfield Beach, Florida 33441 305/426.0335 September 22, 1979
< >+
Iory/qq ~ g p,A'4 t</t/r+
cf Mr. Robert E. Hall, Group Leader Reactor Engineering Analysis Brookhaven I<ational Laboratory
- Upton, Hew York 11973
Dear Bob:
On this date I received a copy of the S.E.R. for St.
Lucie Plant, Unit rl-1 and I reviewed the document to determine if all necessary areas of manual fire protection were covered.
Based upon the information contained in the S.E.R., I find that there are some areas that I do not agree should be considered acceptable.
I did not participate in the site visit for this
- plant, and therefore may not be aware of conditions that would make the positions acceptable.
The areas to which I refer are'. 3.1.3 Fire 5'later Piping Systems That portion of this section referring to,the hose houses does not list a sufficient amount and type of equipment contained therein to be acceptable.
The listing calls for only 100'f 2+2" hose and l00'f'$
" hose while the hydrants are spaced at approximate 200'ntervals and there are only six hose houses.
At all plants that I evaluated, the amount of hose available was based upon the distances from the hydrants to safety related areas with sufficient
~$
hose to enable effective hose streams to be brought to bear on the fire area.
In no case can I recall ever accepting less than 200'f 2~" hose and usually 200'f 1$" hose.
P$
Other necessary equipment not provided include:-1 forcible entry tool, 1'
battery powered handlight and spare coupling gaskets for both 2~e" and 1$" hose couplings.
4.4.3 Breathing Eaniyment I do not agree that the equipment as described I>>
V n
constitutes an adequate supoly of breathing air.
There should be 2, spare air cylindezs for each SCBA, and there should be some designation of how many units are dedicated to emergency use.
The capacity of the cascade system to be provided is not specified.
The number of units stated totals 42 cylinders.
Assuming that they are rated one half hour, which we accept as 20 minute duration, there would be a total of 14. hours of air.
Divide the available air by the minimum fire brigade size would result in 2.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of air per man, providing all cylinders are full.
Two spare cylinders for each unit would provide an additional l~> hours per man (five men) which coupled with a cascade system of designed capacity to refill one half the cylinders would be more realistically acceptable.
Finally I would suggest that you check with our Fire Protection Engineering consultants to be sure that they are satisfied with the statements in 3.10.2 and 3.12.3 regarding the polyurethane pipe insulation.
Very truly yours, J'ohn P. Townley
1
UNfTEDSTATES NUCLEAR REGULATGRY COMMISSI WASHINGTON,D.C. 20555 OFFICE OF THE SECRETARY June 18,'1980
',c<>
Director Office of the Federal Register National Archives and Records-Seryjce Washington, D. C, 20403
Dear Sir:
Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled; FLORIDA PQWER AND LIGI!T COMPANY Docket No. 50-335 NOTICE OF ISSUANCE OF ANENNEI!T TO FACILITY OPEPATING LICENSE Publication of the above document at the earliest possible date would be appreciated.
This material is to be charged to requisition number F-131, Sincerely, n
+Sa e
J, Chilk Secretary of the Commission
Enclosures:
Original and 2 certified copies bcc:
ecor Services Branch 0
.1ce of Public Affairs Executive Legal Director Office of Congressional Affairs Office of the General Counsel
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-335 FLORIDA POWER AND LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 35 to Facility Operating License No. DPR-67, issued to Florida Power and Light Company, which revised Technical Specifications for operation of the St. Lucie Plant, Unit No.
1 (the facility) located in St. Lucie County, Florida.
The amendment is effective May 5, 1980.
The amendment modifies Technical Specification 4.7.1.2 to allow the St.
Lucie Plant, Unit No. 1, to proceed from Mode 4 to Mode 3 to allow steam turbine driven Auxiliary Feedwater pump surveillance to be post-poned in operating Mode 3 instead of Mode 4.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission s rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commission's rules and r egulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this amendment was not required since the amendment
- does, not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 651.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the formal application for amendment dated May 5, 1980, (2) Amendment No.
35 to License No.
DPR-67, and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N.W., Washington, D. C. and at the Indian River Community College Library, 3209 Virginia Avenue, Ft. Pierce, Florida.
A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.
- 20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this l3thday of. Jurie.
FOR THE NUCLEAR REGULATORY COMMISSION Robert A. Clark, Chief Operating Reactors Branch No.
3 Division of Licensing
Docket No. 50-25 50-257 50-335 UNITED STATES NUCLEAR REGULATORYCOMMISSION 7
VVASHINGTON,O.C. $Q555 R. Ingram K. Parrlsh
~
Apr)1 22 1980 ORM4 Rdg
~
~
~ ~
Addressees:
See next page
Subject:
TURKEY POINT PLANT, UNITS NQS. 3 AND 4 Sr. I.UCIE PLANT, UNIT No.
1
~ ~
~
s
~ e w ~ r
~
~r The following documents concerning our review of the subject facility are transmitted foryour information:
. C3 Notice of Receipt of Application.
r
. Draft/Final Environmental Statement, dated 1
r 4 J I
'LJ Safety Evaluation, or Supplement No., dated
= LJ:Nottce"-of Hearing on Application for Construction Permit.
" -= LJ Notice of Consideration of Issuance of Facility Operating License.
-LJ Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated r
Q Const'ruction Permit No. CPPR-
. dated
-Facility Operating License No. DPR-I Amendment'No. 'o CPPR-or DRR-, dated Other:
, dated any 1980.
Dfvfffon of Operating Reactors, ORM'4 Office of Nuclear Reactor Regulation
Enclosures:
As stated cc:
OF F IC6 ORB84: DOR R. Ingram nat san 0A76 NRC-21 (6-761
tl
y I'lorioa PoÃe, K Light Company Divi U.
S Hash s i on o-.
Ecol ogi ca 1 Servi ces au o= Spor. Fisheri s
E Mildli e De. a rt.:ant o; the 1nte, i or ino ".", D.
C.
20240
~
~
~ 4 Direc.or
)ia.'o.
=- i 'Oceanographic Data Center
<Y il 0.:en
~ = 1 Da a Servi ce ti'ational 0=ear>.'c h Atmosprieric Admiinistration L~. S.
D=-i-ar';=-nt o; Co-,.~ rce
'i'ashincton, D.
C.
20235 I I
~\\
James 7.
Ta nne r or a 1 5"."ea u o= Sta nda r ds
~ OI
~'d i i c inc 2~0
- ngton, D.C.
20234 Director, Technical Division 0-,7ice o( Radiation (4,-45o)
U.
S.
Environ;.entai r~yq~- 1 ts-11 Assessment Programs Protection Aoency 20460 C
L r., i ii 3
~ D L.,c (C Environmental Protection Aoency on iV C=='ce ElS COUR i.'l. OR Courtla-."'
ree-.,
V,.E.
- nta, F. =r." ';=-
30302
~
~
i
e
~
istribution:
Lf}acket,F,j]es tTEp sTATES R. Ingram NUCLEAR REGULATORYCOMMISSION K. Parrish WASHINGTON, D.C. 20555 ORM4 Rdg.
e April 21 7980 Docket No.
50 250 50-251 50-33
~.<<ree
\\
Addressees:
See next pagi... "=:
Subject:
TURKEY POINT PLANT,.UNITS NOS I AND 4 ST LICIE PLANT, UNIT,. NO I
r r
The following documents concerning our review of the subject facility are transmitted for your information.".
'r 1
Cl'. '
'Notice of Receipt of Application.'
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-
...dated =-
Facility Operating License No. DPR-Amendment No.
to CPPR-or DRR-
. dated Z
Oth' dated Division of Operating Reactors, ORBS&
Office of Nuclear Reactor Regulation-
Enclosures:
As stated
~e CC:
OFFICE %
SUANAME y DATE IdRC 21 (6 76)
ORBS'4: DOR ",:.
"p
)
R. Ingram 4/g/80
1 0ri Ga
. 0'r:e.
K Light Company Chief Di'vi ~
c !rea U. S.
ga shi io;-.
c-.
="colo ical Services o= Spo-.t Fisheri s
K t'ildliife De-art-.,e.",:
o-,.the. interior.
- ngton, D.
C.
20240 l!hationa'i G:ean""raphic Data Center riviron.:en. =- '.
Da a Servi ce tiational G= ar'.c E Atmosphieric Administration Ll. S. -Depart,:-=n: o Co-,.~ere h'ashiino
- oni, D ~
C.
20235
. Or,'.
Dames
- 7. Tanner
'a:ionai
>u. =au o Standards thea 'r Bui I G 1
~ !
243
,'~'ash ng-.on, D. C.
20234
~
~
Directo.,
- echnical Divi 5 ion 0==i ce o-,
?a di ation (A.PSc)
U.
S.
Environ;.iental "rys -1 teal'"2 Arl irlgion, "ircinia Assessiin nt Programs Protection Agency 20460 n
<iec ion I
LI ni lit.
3-'.= Cour L>1a!
vir=n.;iental Protection Agency Pe=re'=-
3930B
Docket No.
50 335 UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, O.C. 20555 April 9, 1980
~ Distribution:
. Docket file R. Ingram ORBIII4 Rdg.
Addressees:
See next page
Subject:
ST LVCIE PLANT, UNIT NO.
1 The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
1 Draft/Final Environmental Statement, dated 0
Safettr Evaluation, or Supplement No.. dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
r Q
Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-
. dated Facility Operating License No. DPR-
,NPP-,
dated Amendment No.
to CppR-or DRR-, dated El Other: F peking II Division of'perating Reactors, ORB84 Office of Nuclear Reactor Regulation Enclosures; As stated CC:
OFFICE Sa SUANAME In DATE NRC-21 I6 76)
ORBII4:DOR
/9 R.
Ingram 4/t0/80'
p
~ t I g
'F 1
'J
'\\
4
~ *'l
})
a~
d I
L a
~
S ll rc t
4 S
e5 ~
y ~
J,t
', O'I
~
I l
n II+
'L t'
K Light ComPany 2-
<'y-'=
L,is
~
,Dt v I Q. ~ ~ sio
=-c"logical Services
=" c
'""".. Fisheri s
E 1'ildii e
- .;;--=;
- , -.
C.
202<0
=-v ron;.:=-n-.a.'ata Servic tl -:.i on=-,
O=ecn'. =
5 Atmospheric Aoministrati on U. S. -De-ar,en. o= Co-..~erce
~'asnl ng..=n, D.
C.
202
~
~ tC : iot' I
p
'l
~.( i il>>
Tanner i
o Sl anCarcs
"; lc ~n: 233 2023-'.
Directo., technical Dsvislcn Assessp.=ni Programs Protection Agency 20460 II V ~
ycc I
~ 1
~
~
~
~ I 'l f
s G o~
~
Coil+
~ I a,C v r i..1e ~ 'l Protection Aoency
~
~'
I i "0 i-""I'V. OP 3030B
e Docket No.
50-335 UNlTE0 STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555 April 8, 1980 Distribution:
Dock file
. Ingram ORBIII4 Rdg.
Addressees:
See next page
Subject:
ST-LUCIE PLANT UNIT NO-1 The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated r
Notice of Hearing on Application for Construction Permit Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, VOL Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-
. dated Facility Operating License No. DPR-
, NPF-
, dated AmendmentNo.
to CPPR'-
or DRR--
. dated X
Other Forwards "Annual Nonradiol o c
Vols.
1 2
3 go~79 5
Vols. 2 5 3 discuss biotic monitoring.
Division of Operating Reactors, ORB84 Office of Nuclear Reactor Regulation r
Enclosures:
As stated CC:
OFFICE In SURNAME In DATE NRC 2l (6 76I MBA'DQR
'V.
W Ingeam diglSn
0 4
f f
f
~
f V
f V
fY, f
~
gl Il
Florida Power 6 Light Company Chie-Division o-. Ecological Servi ces Bureau G
Sport Fisheries K 1'ildlife U. S.
De-a rt;.,~n t o, the Interi or
. Hashing on, D.
C.
20240 Director Nationa'i 0 eanographic Data Center Environmental Da a Ser vice t'Iationa 1 0
an i 5 Atmosphe ric Administrati on U. S.
Depar m nt of Co~ rce i'ashington, D. C.
20235 Dr. James T. Tanner ha=.ional Bureau of Standards
'Reactor Build'n: 235
,1'ashinoton, D.C.
20234
~'
~
~
- Director, Tec hni c a 1 D1 vision Office of Radiation (a'-4s.o)
U.
S.
Environ;.~ental Crystal t'all
-.--2 Arlington, Virginia Assess'.
nt Programs Protection Agency 20460
". S. Environmn al Protection Aoency Region IV O=fiice ATTf'c:
E I S COORDINATOR 345 Courtla.".8 Str ct, N.E.
Atlanta, Fe".rc'a 3030B
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 Docket No. 50"335 U.S.E.P.A.
Region IV Office ATTN:
EIS COORDINATOR 345 Courtland Office. H.E.
Atlanta, Georgia 30308
Subject:
ST.
LUCIE PLANT, UNIT HO.
1 April 8, 1980 Distribution:
+0~et file R. Ingram ORBP4 Rdg.
The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No.. dated Notice of Hearing on Application for Construction Permit Notice of Consideration of issuance of Facility Operating License.
Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-
. dated Facility Operating License No. DPR-
, NPF-
, dated Amendment No.
to CPPR-or DRR-
. dated pg Other RO 335-8-80-01:
On 800212 site anal h data indicate surface temp rise, in area of max ocean temp, in excess of 5.5 F on 800113.
Possibl caused b
mean.
Thermograph returned to vendor, Division of Operating Reactors, ORBIII4 Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
,OFFICK p SUANAME do NRC-21 (6 76) 9R8NSSR
R 30gr~m 4/ 9 /80
0 S
~
4
~
I
'S p
J' t
4 F'
UNITED STATES Distirbution:
NUCLEAR REGULATORY COMMISSION WASHINGTON, D,C. 20555 Apri1 3, 1980 ORBII4 Rd ORBII4 Rdg.
Docket No.
50-335 U. S. E. P. A.
Region IY Office, ATTH:
EIS COORDINATOR
'85 Court1and Street, H.E.
At1anta, Georgia 30308
Subject:
ST. LUCIE PLANT, UNIT HO.
1 The following documents concerning our review of the subject facility are transmitted for your information;.
Notice of Receipt of Application.
DraftlFinal Environmental Statement, dated Cl Safely Evaluation. or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration oi'ssuance 'of Facility Operating License.
Application and Safety Analysis Report, VOL Amendment No.
to Application/SAR, dated Construction Permit Noa CPPR-Cl Facility Operating License No. DPR-
, dated
, NPF-
, dated Amendment No.
to CPPR-or DRR-, dated El Other: l31IZiIL
'n~emograph~cean discharge area recording thermograph flotation buoy assembly found missing.
Caused by Cl
'eethemutmnramlQdem Dieision of Operating Reactors, ORB84 Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE ln ORB/4: DO SURNAME Ia 0 ATE NRC 21 I6 76) ngram 4/
/80
1 a
J
'E P 1C'I 1
g
+ ~
C I!
m f
a lt V
4
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 istribution:
File R.
Ingram ORBIII4 Rdg.
Docket No. 50-335 March 31, 1980 Addressees:
See next page
Subject:
ST. LUCIE PLANT, UNIT NO.
1 The following documents concerning our review of the subject facility are transmitted for your information:
C3 Notice of Receipt of Application.
Q Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No.,
dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.,
Q Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated
Construction Permit No. CPPR-dated Facility Operating License No. DPR-
,NPP-,
dated Amendment No.
to CPPR-or DRR-, dated X
othe,.
Fo iards a
u rara Division of Operating REactors, ORBg4 Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE tn SURNAME fn 0AlK NRC-21 (6 76)
ORBIII4:DOR R. Ingram 3lgISO
- 4,',
4 1
4 44
'3
~ 4 4
F FI 4
I r
~
4 3k J
I.
4
c 3
I f
'1 g4
'I
~Florida Power E Light Company 2
Chi Division of Ecological Services Bvreau of Sport Fisheries 6 Wildlife U.
S.
Depart-.
nt o, the Interior llashington, D.
C.
20240 Direc or flationai 0"eanographic Data Center Environmer.
a',
Data Service ttation= 1 0"eanic
& Atmospheric Administrati on U. S.
Dapartm nt of Cor~erce t'ashington, D.
C.
20235 Dr. James T. Tanner Rational BJreau of Standards Rea".or BUilding 235 Rash-,in".ton, D. C.
2023-'.
~
'irectbr, Technical Division Office of Radiation (u~-~5g)
U.
S.
Environmental Crystal t'a!1
-'.:2 Ar1ington, Virginia Assessment Programs Protection Agency 20460 U. S. Environmental Protection Aoency Region IV Office Aiih:
E!S COORDINATOR 345 Cour:land Stree:,
H.E.
At'an:a, 6 orgia 3030B
~:
t
'l
~ ~ ~ ~
~ ~
- .'4;
- ;;;:;"
I'
Docket No.
5p-335 Distribution:
Bucket fi1e R.
Ingram
)gsO ORB84 Rdg.
Addressees; See 'next page ST. l.uCIE PLANT, mIT No.
1 The following documents concerning our review of the subject facility are transmitted for your information:
T Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated 0
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Vol.
J Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-Facility Operating License No. DPR-
, dated
, dated Cl Ameodmeot No.
to CPPR-orDRR-, doted IEI
- r
~ A ".e. - a Eo.oo fo~Ay-De Division of Operating Reactors, ORM4 Office of Nuclear Reactor Regulation Enclosures".
As stated.
cc; oFF(CK p SURMAMS R, OATE NRG 21 t1 75) orbg4:DOR WA
~
T<<
R.
Ingram 3qCjSO
Ayll
.R).
y' r
y tl
) ay y
)l Fy y
p lh y
<<y i
~ i y.y>>,,g
~ yy"-
b E
y yhy y
1 y
a y;II
@pl
> y'
Florida Power 8 Light Company 2
'hief Divis i on of Ecol og ica 1 Servi ces Bureau of Sport Fisheries 5 Wildlife U. S.
Department of the Interior Washington, D.
C.
20240 Director National Oceanographic Data Center Environm ntal Data Service National Oceanic 8 Atmospheric Administration U. S.
Department of Conrnerce Washington, D. C.
20235 Dr..James T. Tanner National Bureau of Standards Reactor Building 235 Washington, D.C.
20234 Director, Technical Division Office of Radiation (AW-459)
U.
S.
Environmental Crystal Hall A'2 Arlington, Virginia Assessment Programs Protection Agency 20460 U. S. Environmental Protection Agency Region IV Office ATTN:
EI S COORDINATOR 345 Courtl and Street, '.E.
At)anta, Georgia 30308
original and SE ORDER ble date would be I
4 dr
~ d I
fPdNdAfgI o
d,"
~.. "
'NITEO STATES NUCLEAR REGULATORY COMMISSION WASHINGTON,0;C. 20555 d
4 1
~ *"
.oFFIOEGF THE,""-.,"
February,19, 1980 g.
0 '
".; SECRETARY
.-..-"='~.".',.=,Dierector."-,'-.,~.-:...'.':.==,-.-'.
~"===-':~-+;";-.~,-...Office of.'the.,Federal Regtster.,".-,";=-~
- -':-.-..:=: '~r't.
~;;:;=-"
~-"-'. "-:,.Natonal::Archly'es,an'd Records
- Service,
.',.-'-s,
" "'7:.":~~V',"-..LWas'ington~"",D.C.;.':20403='-
P De r Sir:-;=; -.;:
I 4
~ 44..rj.'~
".",-"'- -'P=;:
. Enclosed for.-. publication 'in the. Federal Register are an tdd'"certified copies of-,a document entitled:
I "--,.
'I.ORIDA.PORRRAAND LIGHT COMPANY
. (-') ll: /
O..-.,c~
4
~ -':.",jgg. I..-,, ';,',.'I','.q::', ',,
DocIH.5 No.'0-335 ORDER MODIFYING JANUARY 2, 1980 SHOW CAU
':Publication of the above document at the earliest possi dd -V c
/,'drI 4
d rd
'appr eci ated.'
"-,.'--.This material=is to be charged to requisition number F-1 31.
4 d
d s
~ 'I d
Si
- erely, I
4 Samuel J. Chilk Secretary of the CommissioIWI I
d 4 ~
d d
se
Enclosures:
.t':
-,Original, II"2",ce'rtifie'd c'opies,-.-"
bcc: records Fa'cilit -Branch Office of;Pu ic-.affairs Executive Legal Director Office ofj C(ngressional Affiars Office of',thy General Counsel SECY -
CIIR,, Br'anch d
I' 4
V'
0
. ~
'Enclosure 7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Florida Power
& Light Company St. Lucie, Unit No.
1 Docket No. 50-335 ORDER MODIFYING JANUARY 2, 1980 SI'OW CAUSE ORDER On January 2, 1980, Florida Power 8 Light Company (the licensee) was issued an Order to Show Cause (45 FR 2434, January ll, 1980) why it should not, by February 15, 1980, implement all "Category A" Lessons Learned require-ments (excluding 2.1.7.a) or shut down St. Lucie, Unit No.
1 (the plant) unless among other things, a shutdown would severely impact the power reliability of the Florida subregion of the Southeastern Electric Reliability Council.
The Order provided that it was temporarily effective pending further order.
II The licensee answered the Order on January 22, and February ll, 1980, stating that all "Category A" requirements would be implemented by February 15, 1980, except the valve position indication requirements of Item 2.1.3.a.
Infor-mation on power reliability was provided by the licensee on January 15, 1980.
Completion of the in-containment work associated with this item necessitates a plant shutdown which the, licensee has requested be deferred until the March 15, 1980 refueling outage.
The bases for this request are power reliability, existing position indication for the subject relief va.ves and compensatory measures consisting of a dedicated man to monitor the relief valves in the control room until the outstanding requirements are met.
2 7590-01 The Department of Energy (DOE) has reviewed the power reliability for Southeastern Florida and concluded that there is a risk of severe system reliability impacts if one of the licensee's three units (St. Lucie 1 and Turkey Point.3 and 4) is shut down during February 1980 o) if two of these units are shutdown during March 1980.
Currently, Turkey Point 4 is required by its license to shut down on February 26, 1980, for steam generator tube inspections which will extend into the first half of March.
In view of the power reliability analysis conducted by DOE and the compensatory measures which the licensee could take, I find good cause shown to modify the January 2, 1980 Order.
Accordingly, pursuant to the Atomic Energy Act of 1954, as
- amended, and the Coomission's regulations in 10 CFR Parts 2 and 50, IT IS HEREBY ORDERED THAT the January 2, 1980 Order is modified as follows:
'(a)
St. Lucie, Unit No. 1, shall be shut down for implementation of the "Category A" Lessons Learned requirements (excluding 2.1.7.a) on or before March 15,
- 1980, and (b)
Until implementation of "Category A" Item 2.1.3.a is complete, unless St. Lucie, Unit No.
1 is shut down, the licensee shall provide a
dedicated, qualified person in the control room to monitor the power operated relief valve and the safety valve positions and,to notify the control room operators if any out-of-normal indications are noted.
For the reasons given in the January 2, 1980 Order, I find that the public health, safety, and interest require that this Modification Order be temporarily effective as of this date.
I
w 3 7590-01 IV The licensee may file a written answer to this Order under oath or affirmation within twenty (20) days of the date of the Order.
The licensee I
',:;",:"-:;. or,any other. person whose interest may be affected by this Order may request a
'earing within twenty (20) days of the date of the Order.
Any request for a hearing will not stay the temporary effectiveness of this Order.
Any request for a hearing shall be addressed to the Director, Office of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Washington, D. C.
20555. If a hearing is requested by a person whose interest may be affected by this Order, the Commission will issue an Order designating the time and place of any such hearing.
In the event a hearing is requested, the issue to be considered at such
.hearing shall be:
Jl whether the remaining "Category A" requirements and the compensatory measures should be implemented in accordance.
with the schedule prescribed by this Order.
Operation of the facility on terms consistent with this Order is not stayed by the pendency of any proceedings on the Order.
FOR THE YUCLEAR REGULATORY COMMISSION Dated at Bethesda,
- Maryland, this 14 day of ~Febroar
, 1980 Edson G. 'Case, Act'fng.Director Offi'ce of Nuclear Reactor Regulat'ion
~P,ll 8K~I, Wp0
/g
- dye,
'+*<<+
OFFICE OF THE SECRETARY UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
.)anuary 29, 1980 Director Office of the Federal Register National Archives and Records Service Washington, D.C.
20403
Dear Sir:
Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:
FLORIDA POWER AND LIGHT COMPANY d
Docket
.No. 50-335 NOTICE OF ISSUANCE OF AMENDMENT'TO FACILITY OPERATING LICENSE Publication of the above document at the earliest possible date would be appreciated.
This material is to be charged to requisition number F-131.
.Si
- erely, II
Enclosures:
Original Im 2 certified copies Samuel J. Chilk Secretary of'Ile Commissioh I
d~d-Office of Public Affairs Executive Legal Director Office of Congressional Affiars Office of the General Counsel SECY -
CER Branch
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-335 FLORIDA POWER AND LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No.
3 4 to Facility Operating License No.
DPR-67 issued to Florida Power and Light Company (the licensee),
which revised Technical Specifications (TS) for operation of St. Lucie Plant, Unit No.
1 (the facility), located in St.
Lucie County, Florida.
The amendment is effective as of its date of issuance.
This amendment deletes the fuel enrichment limit from TS 5.3. 1 (Reactor Core/Fuel Assemblies) and adds a fuel enrichment limit to TS 5.6. 1 (Fuel Storage/
Criticality).
This places the enrichment limit in the appropriate part of the TS.
The application for the amendment complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Comnission's rules and regulations.
The Commission has made appropriate findings as required by the Act and the Comnission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this'amendment was not required since the amendment does not involve a significant hazards con-sideration.
The Commission has determined that the issuance of this amendment will not
/
result in any significant environmental'mpact and that pursuant to
- 10. CFR Section 51.5(d)(4) an environmental inpact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.
M2w 7590-01 For further details with respect to this action, see (1) the application for amendment dated October 4, 1979, as supplemented December 12, 1979, (2)
Amendment No.
3 4 to License No. DPR-67, and (3) the Conmission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N. W., Washington, D. C.,
and at the Indian River Junior College Library, 3209 Virginia Avenue, Ft. Pierce, Florida.
A copy of items (2) and (3) may be obtained upon request addressed to the U.
S. Nuclear Regulatory Commission, Washington, D.
C.
20555, Attention:
Director, Division of Operating Reactors.
Dated at Bethesda, Maryland, this 23rd day of January, 1980.
FOR THE NUCLEAR REGULATORY CON1ISSION-Robert W. Reid, Chief Operating Reactors Branch b4 Division of Operating Reactors
1
~y,ie AEGI
~C ce 0 '.$ ~
'". g
>gv ee ee*g4 OFFICE OF THE SECRETA R Y
~
4 UNITED STATES NUCLEAR R EGULATORY COMMISSION WASHINGTON, O.C. 20555 January g, 1980 cc Director Office of the Federal Register National Archives and Records Service Washington, D.C.
20403
Dear Sir:
Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:
FLORIDA POMER AtID LIGIIT CenPANY Docket No. 50-335 ORDER TQSHOV QgSE Publication of the above document at the earliest possible date would be appreciated.
This material is to be charged to requisition number F-131.
Si
- erely,
Enclosures:
Original
& 2 certified copies I
Samuel J. Chilk Secretary of the Commission I
bcc:
Reccr
'race~
lce of Public Affairs Executive Legal Director Office of Congressional Affiars Of,ice of the General Counsel
.'SECY -
C&R Branch
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION.
In the Matter of Florida Power 5 Light Company (St. Lucie Unit No. 1)
Docket No. 50-335 ORDER TO SHOW CAUSE The Florida Power 5 Light Company (the Licensee) is the holder of Facility Operating License No.
DPR-67 which authorizes the Licensee to operate the St. Luci e Nuclear Power Plant, Unit No.
1 at power levels not in excess of 2560 megawatts thermal (rated power).
The facility is a pressurized water reactor located at the Licensee's site in St. Lucie County, Florida.
Fol'lowing the Three Mile Island Unit 2 (TMI-2) accident on March 28,
- 1979, a TMI-2 Lessons Learned Task Force of the Nuclear Regulatory Commission (NRC)
Staff conducted an intensive review of the design and operational aspects of nuclear power plants and the emergency procedures for coping with potential accidents.
The Task Force identified measures to be taken in the short-term to reduce the likelihood of accidents and to improve emergency preparedness in responding to accidents.
These measures are set forth in NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-term Recommendations".
The NRC has concluded that prompt implementation of the actions denominated "Category A" requirements at operating nuclear power plants is necessary to provide continued assurance of public health and safety.
These "Category A" requirements were transmitted to all licensees operating nuclear power plants by letter dated September 13, 1979.
By letter to affected licensees dated October 30, 1979, further clarification of these requirements was provided.
The Licensee has committed to implementation of each "Category A" require-ment albeit not in all cases prior to January 31, 1980.
NUREG-0578 and ap letters of September 13 and October 30, 1979, which are hereby incorporated into this Order by reference, describe in detail the basis for implementing "Category A" requirements.
The majority of licensees have committed to implement the "Category A" requirements by January 31, 1980 or the reactor will shutdown until such implementation is complete.
However, other licensees have indicated that additional necessary equipment, which is on order, will be delivered after this date.
Thirty days after delivery of equipment is a
practical time period during which the equipment can be installed.
Based on available information, all equipment should be delivered and capable of being installed by June 1,
1980.
Licensees are requi red to meet the January 31, 1980 schedule unless they adequately demonstrate, in accordance with this Order, that delay based on equipment availability is justified.
Available information
indicates that the Florida bulk power system is currently encountering reliability problems.
In view of the potential adverse impact of multiple nuclear plant shutdowns on power reliability in the Southeastern Electric Reliability Council, I have determined that a two week extension to February 15, 1980, for nuclear facilities in this Council is justified to permit staggering of plant shutdowns.
For reasons discussed, timely implementation of these requirements is necessary to provide continued assurance of public health and safety.
Requirements should be satisfied as soon as practicable and in no instance shall a licensee with incomplete "Category A" actions continue operation beyond June 1, 1980.
IY
'Accordingly, pursuant to the Atomic Energy Act of 1954, as
- amended, and the Commission's regulations in 10 CFR Parts 2 and 50, IT IS HEREBY ORDERED THAT the Licensee show cause, in the manner hereinafter provided, why it should not:
By February 15, 1980, implement all "Category A" requirements (except the requirement of 2.1.7.a of NUREG-0578) referred to in Part II of this Order, except those for which necessary equipment is shown, by appropriate and timely documentation, to the Director, Office of NRR, to be unavailable, or place and maintain its facilities in a cold shutdown or refueling mode of operation unless shutdown would severely impact the power reliability in the Florida subregion of the.
Southeastern Electric Reliability Council by requiring more than one nuclear plant within the subregion to be shutdown at the same time, as shown by appropriate and timely
documentation to the Director, Office of NRR.
"Category A" requirements not implemented by February 15, 1980, owing to the unavailability of necessary equipment shall be implemented within 30 days of the date such equipment becomes available.
All "Category A" requirements must be imple-mented no later than June I, 1980.
In view of the importance of the prompt implementation of "Category A" requirements to the health and safety of the pub1ic, I have determined that the public health, safety or interest requires that this Order be temporarily effective as of this date, pending further Order of the Cormission.
The Licensee may file a written answer to this Order under oath or affirmation within twenty (20) days of the date of the Order.
The Licensee or any other person whose interest may be affected by this Order may,request a hearing within twenty (20) days of the date of tge Order.
Any request for a hearing will not stay the temporary effectiveness of this Order.
Any request for a hearing shall be addressed to the Director, Office of Nuclear Reactor Regulation, U.
S ~ Nuclear Regulatory Cormission, Washington, D. C.,
20555.
If a hearing is requested by a person whose interest may be affected by this Order, the Commission will issue an Order, designating the time and place of any such hearing.
e'
In light.of the Licensee's expressed willingness to implement "Category A" requirements, except as indicated in Part III of this Order, in the event a
hearing is requested, the issue to be considered at such hearing shall be:
whether all "Category A" requirements (except the requirements of 2.1.7.a of NUREG-0578) should be, implemented in accordance with the schedule prescribed by this Order.
Operation of the facility on terms consistent with this Order is not stayed by the pendency of any proceedings on the Order.
FOR THE NUCLEAR REGULATORY COMMISSION Dated at Bethesda, Maryland this 2nd day of January, 1980 Harold R. Denton, Director Office of Nuclear Reactor Regulation
Docket No.
50-335 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> O.C. 20555 October 3, 1979 Distribution:
Docket file ORB¹A Rdg RIngram U. S. Environmental Protection Agency Region IV Office ATTN:
EIS COORDINATOR 345 Courtland Street, NE
- Atlanta, GA 3030S
Subject:
ST.
LUCIE PLANT, UNIT 1 The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safely Evaluation. or Supplement No.. dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report. VOL Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-dated Facility Operating License No. DPR-
, NPF-
, dated Amendment No.
to CPPR-or DRR-
. dated other.
Dis lacement of thermo ra h from monitor b
assible vandali m to an r
Caused Operating Reactors Branch 84, DOR Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE 0 SURNAME ~
OArE NRC 2l (6 76)
ORB¹4:DOR RINGRAM
1
l
~
~pS RKgy Wp.0 lw I
pm'(
y'
~**<<+
OFFICE OF THE SECRETARY UNITED STATES NUCMLAR REGULATORY COMMISStON WASHINGTON,D.C. 20555 August 27, 1979 Director Office of the Federal Register National Archives and Records Service Washington, D.
C.
20403
Dear Sir:
Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:
FLORIDA POl!ER AND LIGHT COI!PANY Docket No. 50-335 NOTICE OF ISSUANCE OF AMENDMENT TO FACILElY OPEPATING LICENSE Publication of the above document at the earliest possibI+ date would be appreciated.
f This material is to be charged to requisition number E-146.
Sincerely,
/;
Samuel J. Chilk Secretary of the Commiss"ton
Enclosures:
Original and 2 certified copies
.bcc:
Records Facili t Branch e
o u
tc, a>rs
'Executiv'e Legal Director Office of Congressional Affairs Office of the General Counsel SECY -
C8R Branch
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION
'DOCKET NO. 50-335 FLORIDA POWER 5 LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENMENT TO FACILITY OPERATING LICENSE The U.
S. Nuclear Regulatory Commission (the Commission) has isssued Amendment No.
33 to Facility Operating License No.
DPR-67, issued to Florida Power and Light Company which amended the license for operation of the St. Lucie Plant, Unit No. 1, located in St. Lucie County, Florida.
This amendment will become effective twenty days after its date of issuance provided no hearing is requested.
.The amendment adds license conditions relating to the completion of
. facility modifications and implementation of administrative controls for fire protection.
The licensee's filings comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Commission had made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of the amendment was not required since the amendment does not involve a significant hazards consideration.
The Commission has determined that the issuance of the amendment will not result in any significant environmental impact and that pursuant to 10 CFR 351.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with I
issuance o.
the amendment.
For further details with respect to this action, see (1) the licensee's filings dated March 31,
- 1977, as revised July 18, December 14, and December 22,
- 1977,
7590-01
~
t February 23, Harch 6, April 13, June 23, August 28 and September 29,
- 1978, January 26, April 3 and July 27,
- 1979, (2) Amendment No.
33 to L'icense No.
DPR-67 and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N.W., l<ashington, D.C.
and at the Indian River Junior College Library, 3209 Virginia Avenue, Ft. Pierce, Florida.
A copy of items (2) and (3) may be obtained upon request addressed to the U. S.
Nuclear Regulatory Commission, llashington, D.
C.
20555, Attention: Director,
.Division of Operating Reactors.
Dated at Bethesda, maryland, this 17th day of'ugust 1979.
FOR THE NUCLEAR REGULATORY COMMISSION Robert ll. Reid, Chief Operating Reactors Branch 84 Division of Operating Reactors