ML17266A117

From kanterella
Jump to navigation Jump to search
Forwards LER 79-032/03L-0
Date released: 10/31/2019 Download: ML17266A117


Forwards LER 79-032/03L-0
ML19290B745
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/15/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290B745 (1)
LER 79-032/03L-0:on 791016,during Plant Test of Emergency Diesel Generator 1A,generator Failed to Indicate Voltage or Frequency After Engine Started.Caused by Failed Voltage Regulator Surge Suppressor SP-3.Suppressor Replaced
ML17266A116
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/15/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A116 (1)