Text
'anuary
6, 1999
Dr. Robert C. Mecredy
Vice President,
Ginna Nuclear Operations
Rochester Gas and Electric Corporation
89 East Avenue
Rochester,
New York 14649
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-244/98-12
Dear Dr. Mecredy:
This letter transmits the results of safety inspections conducted by NRC inspectors at the
Ginna Nuclear Power Plant from October 19 through November 29, 1998. At the
conclusion of the inspection, the findings were discussed with Mr. J. Widay and others of
your staff.
During the six weeks covered by this inspection, we noted good operator response to a
partial loss of offsite power and to an inadvertent dilution of the reactor coolant system.
Our review of the Inservice Testing area identified a well designed and implemented
program.
Some minor discrepancies
were identified, but promptly addressed
by your staff.
We noted that seat leak testing conducted on certain containment isolation valves in the
service water system may have been inappropriate, in that the valves were pre-conditioned
prior to leak testing.
We understand that prior to startup from the next refueling outage
you have committed to review the seat leak test procedure and the valve design criteria,
and modify them, as needed, or justify the acceptability of current testing methodology.
Inspector follow-up of your previous commitments to improve long-term service water
system performance, including initiatives to refurbish pumps, modify heat exchangers,
and
develop an improved hydraulic model, identified these items to have been satisfied.
Accordingly, the NRC staff's review of your Generic Letter 89-13 Program is complete.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
Original Signed By:
Lawrence T. Doerflein, Chief
Projects Branch
1
Division of Reactor Projects
990ii90041
990%06
ADOCK OS000244
8
f
~
Dr. Robert C. Mecredy
Docket No.: 50-244
License No: DPR-18
Enclosures:
Inspection Report 50-244/98-12
cc w/encl:
P. Wilkens, Senior Vice President, Generation
Central Records (7 copies)
P. Eddy, Electric Division, Department of Public Service, State of New York
C. Donaldson, Esquire, State of New York, Department of Law
N. Reynolds, Esquire
F. William Valentino, President, New York State Energy Research
and Development Authority
J. Spath, Program Director, New York State Energy'Research
and Development Authority
Dr. Robert C. Mecredy
Distribution w/encl:
H. Miller, RA/J. Wiggins, DRA (1)
Region
I Docket Room (with concurrences)
PUBLIC
NRC Resident Inspector
Nuclear Safety Information Center (NSIC)
L. Doerflein, DRP
W. Cook, DRP
R. Junod, DRP
Distribution w/encl (VIAE-MAIL):
G. Shear,
Rl EDO Coordinator
S. Bajwa, NRR
G. Vissing, NRR
M. Campion, ORA
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
DOCDESK
DOCUMENT NAME: G'iBRANCH1IIGIN9812.INS
To receive a copy of thie document, Indicate In the box: "C
~ Copy without attachment/enclosure
E
Copy with attachment/enclosure
N
No copy
OFFICE
RI/DRP
NAME
PDrysdale
DATE
01/gp/99
RI/DRP
LDoerflein
01/
99