Forwards Insp Rept 50-244/97-12 on 971117-980104 & NOV Re out-of-specification Test Data for B-EDG Which Was Accepted Satisfactory During Last Two Refueling Outages.Security & Safeguards Program Found to Be Adequate
ML17265A168
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/09/1998
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17265A169 List:
References
50-244-97-12, NUDOCS 9802200133
Download: ML17265A168 (5)


See also: IR 05000244/1997012

Text

CATEj ORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9802200133

DOC.DATE: 98/02/09

NOTARIZED- NO

FACIL:50-244 Robert

Emmet Ginna Nuclear Plant, Unit 1,'ochester

G

~

~

AUTH.NAME

AUTHOR AFFILIATION

ERFLEIN,L.T.

Region

1 (Post

820201)

ECIP.NAME

RECIPIENT AFFILIATION

MECREDY,R.C.

Rochester

Gas

&, Electric Corp.

DOCKET

05000244

SUBJECT:

Forwards insp rept 50-244/97-12

on 971117-980104

& NOV re

out-of-specifi'cation test data for B-EDG which was accepted

satisfactory during last two refueling outages.Security

&

safeguards

program found to be adequate.

DISTRIBDTION CODE: IEOIF

COPIES

RECEIVED:LTR

I

ENCL

(

SIZE: 37 3

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:License

Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244

RECIPIENT

ID CODE/NAME

PD1-1

PD

INTERNAL: AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

RNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1 ..1

1

1

'

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

VISSING,G.

AEOD

NTER

R7'DRP

B

NUDOCS -ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL.

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

C

,C

!.OADEDFROM

NRC FLOPPY

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

17

ENCL

17

~ ~

February 9,

1998

Dr. Robert C. Mecredy

Vice President,

Ginna Nuclear Operations

Rochester Gas and Electric Corporation

89 East Avenue

Rochester, New York 14649

~

- 'I

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-244/97-12

AND NOTICE OF VIOLATION ..

Dear Dr..Mecredy:

This letter transmits the results of safety inspections conducted by NRC inspectors at the

Ginna Nuclear Power Plant from November 17 through January 4, 1998. At the

conclusion of the inspection, the findings were discussed with Mr. J. Widay and others of

your staff.

During the seven week period covered by this inspection period, we noted safe plant

operations.

Efforts to reduce the number of operator workarounds were successful during

the recent refueling outage. -Operator response

and subsequent troubleshooting to the

simultaneous loss of both feedwater drain tank pumps was good.

Substantial progress

was observed

in resolving prior open items associated with the service water system.

However, other service water system items; such as the revision of the service water

.

system reliability optimization program, remain open and continue to challenge engineering.

Your plant security program was well managed

and fully implemented, and effective

actions were taken to correct previous deficiencies.

Based on the results of this inspection, the NRC has determined that a violation of NRC

" requirements occurred.

The violation is cited in the enclosed Notice of Violation (Notice),

and the circumstances

surrounding the violation are described in detail in the enclosed

report.

The violation is of concern because out-of-specification test data for the

B-emergency diesel generator was accepted

as satisfactory during the last two refueling

outages,

and the discrepancy was not entered into your Corrective Action Program as

required by your administrative controls.

Please note that you are required to respond to

this letter and should followthe instructions specified in the enclosed Notice when

preparing your response.

The NRC will use your response,

in part, to determine whether

further enforcement action is necessary to ensure compliance with regulatory

requirements.

~onA~2

9802200i33

9S0209

PDR

ADQCK 05000244

8

'DR

OFFICIAL RECORD

COPY

llllllllllllllIllllllllllll

IE: 01

R. C. Mecredy

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

Original Signed

by:

Lawrence T. Doerflein, Chief

Projects Branch

1

Division of Reactor Projects

Docket No.: 50-244

License No: DPR-18

Enclosure:

Inspection Report 50-244/97-12

cc w/encl:

R. Smith, Senior Vice President, Customer Operations

Central Records (7 copies)

P. Eddy, Electric Division, Department of Public Service, State of New York

State of New York, Department of Law

N. Reynolds, Esquire

F. William Valentino, President, New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

Cw

l

R. C. Mecredy

'

Distribution w/encl:

H. Miller, RA/W. Axelson, DRA (1)

Region

I Docket Room (with concurrences)

PUBLIC

NRC Resident Inspector

Nuclear Safety Information Center (NSIC)

L. Doerflein, DRP

R. Junod, DRP

Distribution w/encl (VIAE-MAIL):

B. McCabe, Rl EDO Coordinator

S. Bajwa, NRR

G. Vissing, NRR

M. Campion, ORA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

DOCUMENT NAME: GO,BRANCH1i9712GIN.INS

To receive a copy of this document, hdlcete ht the bosn

C

~ Copy without ettechment/enclosure

E

Copy with ettechment/enclosure

N

~ No copy

OFFICE

NAME

DATE

RI/DRP

PDrysdale

02/

/98

Rl/DRP

LDoerflain

02/

/98

FF

A

R

RD COPY