ML17264B188
| ML17264B188 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/05/1997 |
| From: | Krainik A ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03952-AKK-D, 102-3952-AKK-D, NUDOCS 9706110125 | |
| Download: ML17264B188 (5) | |
Text
CATEQORY-REGULA Y INFORMATION" DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR 9706110125 DOC.DATE: 97/06/05 NOTARIZED: NO DOCKET EACIL:STN-50-528 Palo Verde Nuclear Station, Uni.t 1, Arizona Publi 05000528 STh-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station,. Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION KRAINIK,A.K.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Extends invitation to listed NRC personnel to attend final testing phase of Security Barrier Enhancement Project on 970620 at Goldwater Bombing Range.
DISTRIBUTION CODE:
S003D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Non-Proprietary Info Re Security Plans NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
A T
E 05000528 05000529 6
05000530 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME CLIFFORD,J, ILE CENTER COPIES LTTR ENCL D
M E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL O
DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 5
ENCL
<Std I
1 I"
I r
I
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 102-03952-AKK/DGM/DRL June 5, 1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station: P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Security Barrier Enhancement Project Testing On behalf of Arizona Public Service Company (APS), PVNGS would like to extend an invitation to Mr. Blaine Murray, Region IV Plant Support Branch Chief, Inspector Bruce
- Earnest, Region IV, Mr. Lemoine J.
Cunningham, Nuclear Reactor Regulations Safeguards Branch Chief, Mr. David Orrik and Mr. Eugene McPeek of the Office of Nuclear Reactor Regulations Safeguards Branch to attend the final testing phase of the Security Barrier Enhancement Project.
Extensive preliminary testing has been completed and modifications made to the design of the barriers which PVNGS believes will significantly enhance our Design Basis Threat (DBT) program. Final phase testing of the current design is expected to document results necessary to produce a fullyfunctional barrier.
PVNGS engineers and management will be present for the testing, as well as consultants from the Luke Air Force Base Explosives Ordinance Disposal(EOD) squadron who will assist in conducting this phase of tests as they have done throughout the project.
Testing will begin at approximately 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> and is expected to be completed no later than 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on June 20, 1997. The testing will be held at the Barry M.
Goldwater Bombing Range which is located just south of Gila Bend, Arizona;
~Ifyou would like to attend or should you have any further questions, please contact IVlr Craig Seaman, Emergency Services Director, at (602) 393-2099.
970biiOi25 970605 PDR ADOCK 05000528 F
PDR 1IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ggd3 I
II
C
t
'.'S".Nuclear Regulatory Commission ATTN'. Document Control Desk Security Barrier Enhancement Project Testing
'Page 2 Sincerely, AKK/DGM/DRL cc:
E. W. Merschoff B. Murray L. J. Cunningham K. E. Perkins A. B. Earnest D. N. Orrik E. W. McPeek F. L. Brush J. W. Clifford