ML17264A923
| ML17264A923 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/18/1997 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Vissing G NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TAC-M95759, NUDOCS 9706200275 | |
| Download: ML17264A923 (7) | |
Text
CATEGORY j.
<c REGULA AY INFORMATION DISTRIBUTIO
-SYSTEM (RIDS)
ACCESSION NBR:9706200275 DOC.DATE: 97/06/18 NOTARIZED: NO DOCKET
. FACIL:50;244 Robert Emmet Ginna Nuclear Plant, Unit. 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas !'lectric Corp.
RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
SUBJECT:
Forwards response to 970430 RAI re license amend request for proposed mod to Ginna spent fuel storage pool.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR L ENCL j
SIZE:
TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
T 05000244 E
INTERNA RECIPIENT ID CODE/NAME PDl-1 LA VISSING,G.
NTE 1
NRR/DE/EMCB NRR/DSSA/SPLB'UDOCS-ABSTRACT COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 O.
EXTERNAL: NOAC 1
1 NRC PDR 1
1 D
0 U
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LZSTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
, 13 ENCL 12
,-1 dl llh 4 e
4ND ROCHESTER GASANDEIECTRIC CORPORATION ~ 89 FASTAYENUF, ROCHESTER, N.Y. Id6d94NI AREA CODE716 S I6.2700 ROBERT C. MECREDY Vice President Nueteor Operations June 18, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate I-1 Washington, D.C.
20555
Subject:
Response
to Questions from NRC Staff on Proposed Modification of the Ginna Spent Fuel Storage Pool (TAC No. M95759)
R.E.
Ginna Nuclear Power Plant Docket No. 50-244 Ref. (1):
Letter from G. S. Vissing (NRC) to R.
C. Mecredy (RG&E),
Subject:
Request for Additional Information concerning License Amendment Request of March 31, 1997, relating to a proposed Modification of the Ginna Spent Fuel Storage Pool (TAC No. M95759), dated April 30, 1997.
Dear Mr. Vissing:
By Reference 1,
the NRC staff requested additional information regarding the proposed Modification of the Ginna Spent. Fuel Storage Pool dated March 31, 1997.
Enclosed are responses to each of the questions submitted by the NRC staff.
Very truly yours, Robert C.
Mec dy 9706200275 9706i8 PDR ADQCK 05000244 P
PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII[LIIIIIII xc: Mr. Guy S. Vissing (Mail Stop 14B2)
Senior Project Manager Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr. Paul D.
Eddy State of New York Department of Public Service 3 Empire State Plaza, Tenth Floor
- Albany, NY 12223-1350
U.S. NRC Mr. G, S. Vissing A-1 June 18, 1997 u inN 1
Discuss the remote tools which would be used during dry and wet operation during the spent fuel modtji cation.
Regggn~e'he following is a list and description of the long-handle tools that RG&E anticipates using during the rerack effort:
2.
3.
4.
5.
Tool for installation and removal of the old and new rack liftfixture, approximately 35 feet long.
Tool for the adjustment of rack pedestals/feet, approximately 50 feet long.
Tool for removal of existing rack hold-down bolts.
Tool for underwater T.V. system.
Tool for underwater vacuum system operation, as required.
All long-handle tools willbe of stainless steel, aluminum, or fiberglass.
Allpipes will have drilled holes to allow flooding to prevent radiation streaming to the workers.
Joints will have positive locking devices with lanyards, ifapplicable, to prevent separation and loss of these devices into the pool.
Each device may have multiple uses, e.g., the long-handled rack foot adjustment tool can be used to take elevation readings at rack foot locations or pads, and also to take rack-to-rack or rack-to-wall measurements with an attachment.
U.S. NRC Mr. G. S. Vissing A-2 June 18, 1997 u
ion No. 2:
NRC experiences have shown that when the storage racks are added, the radioactivity concentrations in the spent fuel pool may be expected to increase due to crud deposits spalling Pom spent fuel assemblies which are shuQed.
This crud (spalling) has a loose flu~
layer that falls offthe fuel assemblies to the floor ofthe fuel pools and canals.
This additional crud material has caused the activity ofMn-54 and Co-60 to exceed the values in the TSfor spent fuel pool activities.
Provide a detailed explanation ofthe ALARA considerations that willbe used to combat spalling during spent fuel rerack.
R~ggn~e:
During previous refueling outages, the potential radiological effects of such spalling were controlled by use of an underwater vacuum and fine pore filters. The filters were changed based on dose rate and increased loss of pressure across the filters (dose rate being the first criterion).
The dose rates incorporated beta and alpha emitters which had correlations produced from historical spent fuel pool resin ratios based on 10 CFR 61.
The clarity of the pool was maintained, and there were no indications of high dose rates created by excessive fuel assembly movement.
The underwater vacuum has also proven successful during the full core offloads which have occurred.
RG&E has sufficient experience in the use of this device to ensure control of spalling in the spent fuel pool.
In addition to the use of the underwater vacuum, spalling will be controlled by minimizing the number of fuel assembly shuffles required to establish the geometric configurations set forth in the proposed amendment to the Technical Specifications.
Limited fuel shuffles will be performed to remove fuel from cells on the eastern side of boraflex rack numbers 1E and 1F during removal of existing racks and installation of new racks.
The activity on the floor willbe monitored by an additional underwater probe (RO 7A) dedicated to check for changes caused by the result of workers'ctions.
Because of the use of two underwater probes (one for the use of underwater workers and the second one for the use of the radiological technician), an additional layer of assurance consistent with ALARAobjectives is incorporated.