Text
'
March 25,
1997
Dr. Robert C. Mecredy
Vice President,
Ginna Nuclear Operations
Rochester
Gas and Electric Corporation
89 East Avenue
Rochester,
New York 14649
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-244/97-01
Dear Dr. Mecredy:
This letter transmits, the results of safety inspections conducted
by NRC inspectors at the
Ginna Nuclear Power Plant from January
5 through February 23, 1997. At the conclusion
of the inspection, the findings were discussed with Mr. J. Widay and others of your staff.
During the seven week period covered by this inspection period, we noted overall safe
operation of the plant.
In particular, we observed good operator response to a failed
control rod drive motor generator set.
We also noted effective operator training and
maintenance.
Good engineering support to the plant was observed, for example,
in
resolution of problems with excessive feedwater flow oscillations and with the minimum
service water design inlet temperature.
The inspectors noted some discrepancies
between'esign
basis documents
and plant procedures,
and these were resolved, or 'are currently
being evaluated by your staff.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements
occurred concerning ineffective corrective actions taken in response to poor
radiological work practices and inadequate
contamination boundary controls.
This violation
is cited in the enclosed
Notice of Violation (Notice), and the circumstances
surrounding the
violation are described
in detail in the enclosed report.
Please note that you are required to
respond to this letter and should follow.the. instructions specified in the enclosed
Notice
when preparing your response.,The
NRC will use your response,
in part, to.determine
whether further enforcement actions is necessary to ensure compliance with regulatory
requirements.
97040200i8
970325
ADOCK 05000244
8
ll113llllllll3llll3lllllltllll]lltHRjllll
OFFICIAL RECORD
COPY
IE: 01
~
~
Robert C. Mecredy
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter
and its enclosures
will be placed in the NRC Public Document Room (PDR).
We appreciate your cooperation.
Sincerely,
Original Signed
by:
Lawrence T. Doerflein, Chief
Projects Branch
1
Division of Reactor Projects
'ocket
No.: 50-244
License No: DPR-18
Enclosures:
2. Inspection Report No.'50-'244/97-01.
cc w/encls:
R. Smith, Senior Vice President,
Customer Operations
Central Records (7 copies)
P. Eddy, Director, Electric Division, Department of Public Service, State
of'New York
State of New York, Department of Law
~ N. Reynolds,
Esquire
F. William Valentino, President, New York State Energy Research
and Development Authority
J. Spath, Program Director, New York State Energy Research
"
and Development Authority.
7
Robert C. Mecredy
3
Distribution w/encls:
W. Axelson, DRA
Region
I Docket Room (with concurrences)
PUBLIC
NRC Resident Inspector
Nuclear Safety Information Center (NSIC)
D. Screnci, PAO
R. Correia, NRR
D. R. Taylor, NRR
L. Cunningham,
D. Barss, NRR
L. Doerflein, DRP
'. Moslak, DRP
R. Junod,
Distribution w/encls (VIAE-MAIL):
W. Dean, OEDO
S. Bajwa,
NRR'.
Vissing, NRR
A. Dromerick, NRR
M. Campion, ORA
Inspection Program Branch, NRR'(IPAS)
A
DOCUMENT NAME: G:IIBRANCH1IIIR97-01.GIN
To receive a copy of this document. Indicate In the box: "C
~ Copy without attachment/enclosure
"E
a Copy with attachment/encIosure
N
~ Ifo copy
OFFICE
NAME
DATE
Rl/DRP
PDrysdale
'
J
03/>/97
RI/DRP
LDoerflein
/I
0345/97
OFFICIAL RECORD COPY