ML17264A132

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1995 for Re Ginna Nuclear Power Plant.W/950809 Ltr
ML17264A132
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508150168
Download: ML17264A132 (8)


Text

PRZGRXTY 1 (ACCELERATED RZDS PROCESSZNG) f,r , REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 p AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J.A. . Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operat' for Jul 1995 for RE Ginna Nuclear Power Pla . /950809 Ktr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL TITLE: Monthly Operating Report (per Tech Specs) j SIZE:

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 F~ CENTER 1 1 NRR/DISP/PIPB 1 1 ~4)RPMPP 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE,TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D8 (415 2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON)T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

limni I/1S///S 8//// 0 Ias

>" Ig////II/ IIIIIIIIIII/

Ill/(III(4Ãl IIIIIIII~IE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 1464g-ggg1 TELEPHONE AREA CODE 710 546 2700 GINNA STATION August 9, 1995 I

US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for July, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of July, 1995.

Very truly yours, s h A. Wid y Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

$ 5@~ r,p 9508i50ih8 95073i PDR ADOCK 05000244 R

PDR

OPERATING DATA REPOI 50-244 Au st 9 1995 COMPLETED BY:

John V. Walden TELEPHO E (716) 771-3588

1. Unit Name: -

R.E. GINNA NUCLEAR POWER PLANT Notes:

2. Reporting Period: Jul 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr:to-Date Cumulative

11. Hours in Reported Period 744.0 5087.0 225095.0
12. Number of hours Reactor Was Critical 744.0 4210.5 180026.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6 *
14. Hours Generator On-line 744.0 4149.3 177121.6
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1085722.0 6069254.0 251584491.0
17. Gross Electrical Energy Generated (MWH) 360925.0 2046316.0 83280368.0
18. Net Electrical Energy Generated (MWH) 342637.0 1944703.0 79053933.0
19. Unit Service Factor (%) 100.0 81.6 78.7
20. Unit AvailabilityFactor (%) 100.0 81.6 78.7
21. Unit Capacity Factor (using MDC Net) (%) 98.0 81.3 75.8
22. Unit Capacity Factor (using DER Net) (%) 98.0 81.3 75.8
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

" CUMULATIVETOTAL COMMENCING JANUARY 1, 1975 '

CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 9 1995 COMPLETED BY:

John Walden TELEPHONE: 16 771-3588 MONTH Jul 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 476 17 ~ 462 2 ~ 475 18. 462 3 ~ 471 19 ~ 362 4 ~ 467 20. 459 5 ~ 467 21 ~ 460

6. 466 22. 461 7

8.

~ 466 465 23.

24 '61 461 9

10

~

'65 466 25.

26.

'59 460 460 12 13.

'64 465 465 27 28.

29 '61 461

14. 463 30. 458
15. 461 31. 458
16. 462 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

l I

DO(:KET NO.

UNITNAM(:. R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE st 9 .9 5

(:OhIPLETED BY ohn V. Walden REPORT hlONTH Tl'. LE P HOÃ:

h 0 c c c v Licensee Lo Cause 8 Corrective 0 c 0

Ew Cl c

Date 0 o Event 0 Action to No. o o o o o I- o X.'~ Cl CC 0 lA c Report e IA (J Prevent Recurrence O

0 CL 95-06 7/19/95 13;-8 A Power reduction due to Main Feedwater pump oil cooler leak 3

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-hlanual for Preparation of Data B-hlaintenance or Test 2-Manual Scram. Entry Sheets for Liccnsce C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Other (Explain) Exhibit 1 - Same Source

NARRATXVE

SUMMARY

OP OPERATXNG EXPERXENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A COMPLETED BY:

u t 9 199 John Walden TELEPHONE: 716 71-3588 MONTH Jul 1995 On July 19, power was reduced to 484 capacity due to an oil cooler leak on the "B" Main Feedwater pump. This reduction in power lasted for 13.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Average power for the month was 964.

~ ~ >4 V ~

>~