Text
PRZGRXTY 1 (ACCELERATED RZDS PROCESSZNG)
, REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) f,r FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas
& Electric Corp.
WIDAY,J.A.
. Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 p
SUBJECT:
Monthly operat' for Jul 1995 for RE Ginna Nuclear Power Pla
. /950809 Ktr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I ENCL j SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 JOHNSON,A 1
1 F~
CENTER 1
1
~4)RPMPP 1
1 1
1 NOAC 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
N NOTE,TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D8 (415 2083)
TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON)T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
I/1S///S 8////
limni 0 Ias
>" Ig////II/
IIIIIIIIIII/
Ill/(III(4Ãl IIIIIIII~IE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 1464g-ggg1 TELEPHONE AREA CODE 710 546 2700 GINNA STATION August 9, 1995 I
US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for July, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of July, 1995.
Very truly yours, s
h A. Wid y Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
$ 5@~ r,p 9508i50ih8 95073i PDR ADOCK 05000244 R
OPERATING DATAREPOI COMPLETED BY:
50-244 Au st 9 1995 John V. Walden TELEPHO E
(716) 771-3588
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Jul 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
470 8.
IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
Notes:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrictions, IfAn:
This Month Yr:to-Date Cumulative
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 744.0 0.0 744.0 0.0 1085722.0 360925.0 342637.0 100.0 100.0 98.0 98.0 0.0 5087.0 4210.5 0.0 4149.3 0.0 6069254.0 2046316.0 1944703.0 81.6 81.6 81.3 81.3 0.0 225095.0 180026.2 1687.6
- 177121.6 8.5
- 251584491.0 83280368.0 79053933.0 78.7 78.7 75.8 75.8 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
" CUMULATIVETOTALCOMMENCINGJANUARY 1, 1975 '
CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: Au ust 9
1995 COMPLETED BY:
John Walden TELEPHONE:
16 771-3588 MONTH Jul 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 1 ~
2 ~
476 475 17 ~
18.
462 462 3 ~
471 19 ~
362 4 ~
467 20.
459 5 ~
467 21 ~
460 6.
466 22.
461 7 ~
466 23.
461 8.
465 24'61 9 ~
466 25.
460 10'65 26.
460 465 27'59 12'64 28.
461 13.
465 29'61 14.
463 30.
458 15.
461 31.
458 16.
462 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
l I
REPORT hlONTH DO(:KET NO.
UNITNAM(:.R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE st 9
.9 5
(:OhIPLETED BY ohn V. Walden Tl'.LE P HOÃ:
No.
Date 0
I-c0 o
o o X.'~
c0 o
Cl CC h0 c v o
0 lA c 0
CL Licensee Event Report e
Ew o
IA (J c
Cl Lo 0c o
O Cause 8 Corrective Action to Prevent Recurrence 95-06 7/19/95 13;-8 A
Power reduction due to Main Feedwater pump oil cooler leak F: Forced S:
Scheduled REV. 4/85 4949 Reason:
A-Equipment Failure (Explain)
B-hlaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hlethod:
1-hlanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsce Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATXVE
SUMMARY
OP OPERATXNG EXPERXENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: A u t 9 199 COMPLETED BY:
John Walden TELEPHONE:
716 71-3588 MONTH Jul 1995 On July 19, power was reduced to 484 capacity due to an oil cooler leak on the "B" Main Feedwater pump.
This reduction in power lasted for 13.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Average power for the month was 964.
~
~