ML17263B055

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1995 for Re Ginna Nuclear Power Plant.W/950509 Ltr
ML17263B055
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9505180246
Download: ML17263B055 (7)


Text

RIQRITY PACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly Power Plan operat'or

/950509 . r.

Apr 1995 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs ENCL 2 SIZE:

0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CE EER~O 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

N YOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE! COYTACTTIIE DOC!.'MENT CONTROL DESK, ROOK! PI -37 (EAT. 504-2083 ) TO F LI XII NATE YOI 'R NAZIL F ROTI DISTRIBUTION LIS'I'S FOR DOCI, NIEX'I'S 5'OL'ON"I'L'f:.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I EN/II iSZS TORE Z8/ II I/S/III!l STAVE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 7VVI 546-2700 GINNA STATION May 9, 1995 US Nuclear Regulatory Commission Document Control Desk

.Washington, DC 20555

Subject:

Monthly Report for April, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1995.

Very truly yours, A. Wi s

a thManager JAW: t jn Attachments c: Mr. Thomas T. Martin NRC (1)

,950518024b 950430 PDR ;ADOCK'05000244

-R PDR

II I 0 A

It VX003" z-

?

E~g j

1

OPERATING DATA REPO%

50-244 Ma 9 1995 COMPLETED BY V John V. Walden TELEPHONE 15)5244446 Ext.588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: A ril 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Ca pacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr:to-Date Cumulative-

11. Hours In Reported Period 719.0 2879.0 222887.0
12. Number of hours Reactor Was Critical 28.9 2056.3 177872.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 0.0 2027.1 '74999.4
15. Unit Reserve Shutdowri Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 9.0 3007884.0 '48523121.0
17. Gross Electrical Energy Generated (MWH) 0.0 1017317.0 82251369.0
18. Net Electrical Energy Generated (MWH) 0.0 967351.0 78076581.0
19. Unit Service Factor (%) 0.0 70.4 78.5
20. Unit AvailabilityFactor (%) 0.0 70.4 78.5
21. Unit Capacity Factor (using MDC Net) (%) 0.0 71.5 75.6
22. Unit Capacity Factor (using DER Net) (%) 0.0 71.5 75.6
23. Unit Forced Outage Rate (%) ERR 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1 1975 ~

'* CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

'NIT IN REFUELING SHUTDOWN

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Ma 9 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588

'AY MONTH A ril 1995 DAY AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 17

'8.

2 ~

3 ~ 19.

4 ~ 20.

5. 21 ~
6. 22

'3 7 ~

8.

'4.

9. 25.

10 26.

27.

12. 28.

13 29.

'4.

30.

15. 31 ~

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DO(:KET NO.

UNlT NAhfE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE 9 1995

(:OhfPLETED l3Y ohn V. Walden REPORT MONTH 1995 TELEPllON . 588 Pl e4 0 Ol s- a 0 C c u Licensee Ew Cl EO e Cause L Corrective 0 o O Action to Ho. Date o 0 o m 0 Event Cl Q o a o 0 0 Prevent Recurrence n~ Cl own c X 0 Report ll EA n

95-03 3/26/95 S 852.0 C Annual Refueling 1

F: Forced Reason: hfethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-hfanual for Preparation of Data B-Maintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction lf-Other (Explain) 0161)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Ocher (Explain) Exhibit 1 - Same Source

NARRATXVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Ma 9 1995 COMPLETED BY:

John Walden TELEPHONE: 315 24-4446 Ext. 588 MONTH A ril 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage. The unit remained off line during the entire month of April.