PR.j!:C)8.1 E'V 1
ACCELERATED RIDS PROCESSING) ---
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas S Electric Corp.
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION P
SUBJECT:
Monthly opera t for Mar 1994 for RE Ginna Nuclear Power Plant. / 50405 tr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 0 05000244 I
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 JOHNSON,A 1
1
~ME ~CEN E~R$ 1 1
1
~BR/>DOPS%OECB 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 D
C U
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE KVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
lt ldlÃ$ÃSKI!/ZA'Z:::
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 7ELEPHONE AREA COOE 7IE 546-2700 GXNNA STATION April 5, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for March, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1995.
Very -truly yours, a.d os h A. Wid Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1) 9504ii0314 95033i=
PDR ADOCK 05000244*
~wypf
g
(~Aid.it
OPERATING DATAREPOI COMPLETED BY:
ril 5 1995 50-244 John V. Walden TELEPHONE (315)5244446 Ext.588 Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
March 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWo):
470 8.
IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, lfAny (Net MWe:
- 10. Reason For Restrictions, IfAn.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 611.4 0.0 611.1 0.0 911453.0 308857.0 293775.0 82.1 84.0 84.0 0.0 2160.0 2027.4 0.0 2027.1 0.0 3007875.0 1017317.0 967351.0 93.8 93.8 95.3 95.3 0.0 222168.0 177843.2 1687.6
'74999.4 8.5
'48523112.0 82251369.0 78076581.0 78.8 78.8 75.9 75.9 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Typo, Date and Duration of Each):
Refuelin and Maintenance Start 3/26/95 Duration 36 da
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION CUMULATIVETOTALCOMMENCINGJANUARY1, 1975 CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
C C
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: A ril 5 1995 COMPLETED BY:
John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH March 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 483 17.
484 2 ~
483 18.
484 3 ~
483 19'84 4 ~
485 20.
484 5.
484 21 ~
483 6.
484 22.
484 7 ~
484 23.
484 8.
484 24.
483 9.
484 25.
483 10.
484 26.
142 484 27
'2.
484 28.
13.
485 29.
14.
485 30.
15.
485 31.
16.
484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DOCKET NO.
50-244 UNITNAMER.E. GINNA NUCLEAR pO~fR PLANg UNlT SHUTDOWN AND POWER REDUCT(ONS DATE A il 5 1995 COMPLETED l3Y a
en r
REPORT MONTH h
1995 TELEPHO:
315 524-4446 E t.
588 No.
Date C
0 a
0 0 ~
C0 oO I0 c u 9
~
4I oOIn C
0 CI Licensee Event Report e
Ew 0
IA (J CO Ill c
Q u0 tJ Cause & Corrective Action to Prevent Recurrence 95-0 3/26/95 S
133.0 C
Annual Refueling 1
F: Forced S:
Scheduled REV. 4/85 4949 Reason:
A-Etluipment Failure (Explain)
B-lIfaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-hfanual 2-hfanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
~1
NARRATIVE SUMN2&Y OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: A r'l 5 1995 COMPLETED BY John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH March 1995 During the first 25 days of March the average power level was 994.
On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.