Monthly Operating Rept for Mar 1994 for Re Ginna Nuclear Power Plant.W/950405 Ltr
ML17263B005
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9504110314
Download: ML17263B005 (9)


Text

PR.j!:C)8.1 E'V 1 ---

ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas S Electric Corp. P WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly opera Power Plant. / 50405 ttr.for Mar 1994 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE 0 TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 I

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ~ME ~CEN E~R$ 1 1 1 NRR/DISP/PIPB 1 1 ~BR/>DOPS%OECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

lt ldlÃ$Ã SKI!/ZA'Z:::

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 7ELEPHONE AREA COOE 7IE 546-2700 GXNNA STATION April 5, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1995.

Very -truly yours, a.d os h A. Wid Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) 9504ii0314 95033i=

PDR ADOCK 05000244*

PDR ~wypf

g

(~ Aid.it

OPERATING DATA REPOI 50-244 ril 5 1995 COMPLETED BY:

John V. Walden TELEPHONE (315)5244446 Ext.588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: March 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWo): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, lf Any (Net MWe:
10. Reason For Restrictions, If An .

This Month Yr.-to-Date Cumulative

11. Hours In Reported Period 744.0 2160.0 222168.0
12. Number of hours Reactor Was Critical 611.4 2027.4 177843.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 611.1 2027.1 '74999.4
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 911453.0 3007875.0 '48523112.0
17. Gross Electrical Energy Generated (MWH) 308857.0 1017317.0 82251369.0
18. Net Electrical Energy Generated (MWH) 293775.0 967351.0 78076581.0
19. Unit Service Factor (%) 93.8 78.8
20. Unit AvailabilityFactor (%) 82.1 93.8 78.8
21. Unit Capacity Factor (using MDC Net) (%) 84.0 95.3 75.9
22. Unit Capacity Factor (using DER Net) (%) 84.0 95.3 75.9
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Typo, Date and Duration of Each):

Refuelin and Maintenance Start 3/26/95 Duration 36 da

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION CUMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

C C

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A ril 5 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH March 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 483 17. 484 2

3 4

~

~

~

483 483 485 18.

19 20.

'84 484 484

5. 484 21 ~ 483
6. 484 22. 484 7 ~ 484 23. 484
8. 484 24. 483
9. 484 25. 483
10. 484 26. 142 484 27 484 28.

'2.

13. 485 29.
14. 485 30.
15. 485 31.
16. 484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO. 50-244 pO~fR PLANg UNlT SHUTDOWN AND POWER REDUCT(ONS UNITNAME DATE A COMPLETED l3Y R.E.

il GINNA NUCLEAR 5 1995 a en r REPORT MONTH > h 1995 TELEPHO: 315 524-4446 E t. 588 I

0 C C

C c u Licensee Ew O Ill Cause & Corrective 0 9 ~

c No. Date 0 0 4I Event Q u Action to a o o 0 0 Prevent Recurrence 0~ O OIn C Report e IA (J tJ 0

CI 95-0 3/26/95 S 133.0 C Annual Refueling 1 3 F: Forced Reason: Method: Fxhibit G - Instructions S: Scheduled A-Etluipment Failure (Explain) 1-hfanual for Preparation of Data B-lIfaintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Other (Explain) Exhibit 1 - Same Source

~1 NARRATIVE SUMN2&Y OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A r'l 5 1995 COMPLETED BY John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH March 1995 During the first 25 days of March the average power level was 994. On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.