RIG)RITY ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~,
~
~
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION.
WALDEN,J.
Rochester Gas
& Electric Corp.
WODAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION P
SUBJECT:
Monthly operatin t for Jan 1995 for RE Ginna Nuclear Power Plant.
50207 tr.
DISTRIBUTION CODE IE24D COPIES RECEIVED LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
0 05000244 P
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME JOHNSON,A FILE CENTER 0 3 NRR/.DOPS/OECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
0 U
E NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIXIINATE YOUR i'AXIEFROW!
DISTRIBUTIONLISTS I'OR DOCL.'MEN'I'S YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
II IS IIIIIIIIIIII t/
A lVO ig'IIIIIIIIIII I)IV/SF!!Z
- I IIIIIkIif IIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, 3Z.::::
N. K 14649-0001 TELEPHONE
- RE* CODE 7ID 546-2700 GINNA STATION February 7,
1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for January, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1995.
Very truly yours,
~
~
o ph A. Wi Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
~ErI a<;
9502140386 95013i PDR ADDCK 00000244 R
0 4
COMPLETED BY 50-244 J nua 7 1995 r
John V. Waiden TELEPHONE (315)5244446 Ext.588 Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Janus 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Ca pacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
470 8.
IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny(Net MWe:
- 10. Reason For Restrictions, IfAn.
This Month Yr.-to.Date Cumulative
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 744.0 0.0 744.0 0.0 1095892.0 370072.0 351805.0 100.0 100.0 100.6 100.6 0.0 744.0 744.0 0.0 744.0 0.0 1095892.0 370072.0 351805.0 100.0 100.0 100.6 100.6 0.0 220752.0 176559.8 1687.6
- 173716.3 8.5
- 246611129.0 81604124.0 77461035.0 78.7 78.7 75.8 75.8 5.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Start 3/26/95 Duration 36 da
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Februar 7
1995 COMPLETED BY:
John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH Januar 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
2 ~
3 ~
4 ~
5.
6.
7 ~
8.
9.
10.
12.
13.
14.
15.
16.
483 483 483 483 483 483 483 483 483 483 483 483 483 483 483 483 17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27
'8.
29.
30.
31.
483 483 483 483 483 483 483 483 482 483 483 248 406 482 483 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Februar 7
1995 COMPLETED BY:
John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH Januar 1995 During the month of January the average power was 97%.
Power was reduced to 45%
on January 28 to allow condenser water box isolations and tube plugging.
The unit was restored to full power on January 29.
DOCKET NO.
R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE F b 1
5 COhlPLI:.1'I:.D BY ohn V. Walden REPORT hlONTH January,1995 TELIIPIIONE 315 524-4446 E~t.
588 No.
Date 0
I 00 0
~-
0 00 00 tx!
0l 4 S~0 E u 0
0 I/l C 0
Cl I icensee Event Report 4I Ew 0
0 0
1/l c0 L/l 0
0 00 O
Cause 8 Corrective Action to Prevent Recurrence 95-01 1/28/95 F
34.5 Condenser Tube leaks caused a
deviation in Steam Generator Secondary Chemistry.
Power was reduced to 45% to allow condenser tube plugging.
1 F: Forced S:
Scheduled REV. 4/85 4949 Reason:
A-Eciuipment Failure (Explain)
B-hlaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)
EI-Other (Explain) hlethod:
1 hlanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Source