ML17263A906

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1994 for Ginna Station. W/950106 Ltr
ML17263A906
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1994
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9501180196
Download: ML17263A906 (6)


Text

RIG RITY PACCELERATED Rl DS P ROCESSli 1

G)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mo 950106 crating rept for r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

Dec 1994 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

j for Ginna ENCL Station.

3 SIZE:

05000244 I

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE-CENTER 0 1 1 NRR/DIS P/PI PB 1 1 NRR/DOPS/OECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUh!ENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO EL I %1INATE YOUR NAiIE PRO%I DISTRIBUTION LISTS I:OR DOCI;MENTS YOU DON"I'LED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

t izzzzg< ~r~ivzzirl ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 7ld 546 2700 GINNA STATION January 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for December, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1994.

Very truly yours, a,.d s h A. Wid Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) 950118019b 941231 PDR ADOCK 05000244 s(c

OPERATING DATA REPORT 50-244 Jan a B, 1995 COMPLETED BY:

John V. Walden TELEPHONE (315)524-444B Ext.588 0 RATI G S US

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: December, 1994
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470 B. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Levol to Which Rostricted, If Any (Net MWo):
10. Reason For Rostrictions, If An:

This Month Yr.-to. Date Cumulative""

11. Hours in Ropcrtod Period 744.0 8700.0 220008.0
12. Number of hours Reactor Was Critical 744.0 7289.3 176816.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 1087.0 i
14. Hours Generator On-line 744.0 7219.9 172972.3
15. Unit Rosorvo Shutdown Hours 0.0 0.0
10. Gross Thermal Energy Generated (MWH) 1115511.0 10559224.0 245616237.0
17. Gross Electrical Energy Generated (MWH) 377181.0 3550B93.0 81234052.0
18. Net Electrical Enorgy Gonoratod (MWH) 358923.0 3373857.0 77109230.0
19. Unit Servico Factor (%) 100.0 82.4 78.0
20. Unit Availability Factor (%) 100.0 82.4 78.0
21. Unit Capacity Factor (using MDC Net) (%) 102.0 81.9 75.7
22. Unit Capacity Factor (using DER Net) (%) 102.B 81.9 75.7
23. Unit Forced Outage Rate (%) 0.0 5.9
24. Shutdowns Scheduled Over Next B Months (Type, Dato and Duration of Each):

Refueling and Maintonanco, Start 3/20195, Duration 30 days

25. If Shutdown At End of Roport Period, Estimato Dato of Startup:
20. Units in Tost Status (Prior to Commercial Operation): Forcast Achiovod INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

" CUMULATIVETOTAL COMMENCING JANUARY 1, 1975

"" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1909

AVERAGE DAILY UNIT POWER IZVEL DOCKET NO 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Januar 6 1995 COMPLETED BY:

John Walden TELEPHONE: 3 5 524-4446 Ext. 588 MONTH December 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 482 17 ~ 483 2 ~ 482 18. 483

3. 483 19. 483 4

5.

6.

~ 483 482 482 20.

21 22.

'83 482 483

7. 482 23. 483
8. 482 24. 483
9. 482 25. 483
10. 483 26. 483 482 27. 483
12. 482 28. 483 13 ~ 482 29. 484
14. 483 30. 484
15. 483 31. 483
16. 483 INSTRUCTIONS On this format, list the average daily unit p'ower level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DO(:KET NO. ~0 244 UNIT NAhfl: R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhfPLETl:D BY on . a en REPORT MONTH December f'f:.1 lipllO l: ( 3~5 ) 524-4446 Ext'. 588 0 c c v Licensee c~ Cause 8 Corrective Cl 0 c Em 0 0 O Ho. Date 0 >

Event 0 Action to o

Qr0

~

Q~

Cl n

Ix.'

c Report a EA o

(J E o Prevent Recurrence O

0 Q

1 F: Forced Reason: hfethod: Fxhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hfanual for Preparation of Data B-hfaintenance or Test 2-hfa nual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

REV. 4/SS 4949 H-Other (Explain) Exhibit 1 - Same Source

NARRATXVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J n ar 6 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH December 1994 During the month of December the average power was 99%.