ML17263A757

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1994 for Re Ginna Nuclear Power Plant.W/940809 Ltr
ML17263A757
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1994
From: Ploof R, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408220109
Download: ML17263A757 (7)


Text

PR.ICDR.j; j." it.'

CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION PLOOF,R. Rochester Gas 6 Electric Corp. P WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly opera Power Plant. /940809 tl for Jul r.

1994 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR'NCL ,ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/DSP/TPAB 1 1 ARDORS OEAB 1 ~

1 Y' NRR/DRI L/RPEB 1 1 EG F~E 01 1 1 RGN1 1 1 EXTERNAL EGGG BRYCE 1 J H 1 1 NOAC 1 1 NRC PDR 1 1 C

U N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

//I/////, //Zl/8 ROCHESTER GAS ANDELECTRIC CORPORATION o 89 EASTA VENUE, ROCHESTER, N. Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Rant Manager AREA CODE 7l 6 546-2700 Gtnna Nuclear Plant GINNA STATION August 9, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for July, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of July, 1994.

Very truly yours, Joseph A. Widay Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

'I Art n n~

9408220109'40731 PDR ADOCK 05000244 R PDR

lI 1

I

~ II

OPERATING DATA REPORT DOCKET NO. 50-244 DATE: August 9, 1994 COMPLETED BY:

Ronald D. Ploof TELEPHONE (315) 524-4446 Ext.673 OE GS US

1. Unit N R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: July, 1994
3. Ucensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Not MWo): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If Any:

This Month Yr.-to. Date Cumulative"

11. Hours in Reported Period 744.0 5087.0 216335.0
12. Number of hours Reactor Was Critical 744.0 3915.1 172441.6
13. Roactor Reserve Shutdown Hours 0.0 0.0 1688.0 i
14. Hours Generator On-line 744.0 3851.9 169603.9
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 1103845 5570613 '40526626
17. Gross Electrical Energy Generated (MWH) 366443 1882634 79565993
18. Net Electrical Energy Generated (MWH) 348165 1788132 75523505
19. Unit Service Factor (%) 100.0 75.7 78.4
20. Unit Availability Factor (%) 100.0 75.7 78.4
21. Unit Capacity Factor (using MDC Net) (%) 99.6 74.8 75.4
22. Unit Capacity Factor (using DER Net) (%) 99.6 74.8 75.4
23. Unit Forced Outage Rate (%) 7.7 4.2 5.6
24. Shutdowns Scheduled Over Noxt 6 Months (Typo, Dato and Duration of Each):
25. If Shutdown At End of Report Poriod, Estimato Date of Startup:
26. Units in Tost Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 0

" CUMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 9 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-4446 Ext. 673 MONTH Jul 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 476 17. . 467

2. 477 18. 468
3. 476 19. 467 4, 475 20. 467
5. 474 21. 467
6. 473 22. 466 472 23. 463
8. 472 24. 467
9. 470 25. 462
10. 469 26. 463
27. 463
12. 471 28. 463
13. 468 29. 463
14. 468 30. 462
15. 469 31. 462
16. 467 INSTRUCTIONS On this format, for each list inthe average daily unit power level in to the nearest MWe-Net day reporting month. Compute whole megawatt.

DO(KI-T NO 50 244 UNITNAhlE R E. GINNA NUCLEAR POWER. PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE Au ust 9, 1994 COhlPLETED I3Y Ronald Ploof REPORT hlONTH 1 I.LEPHONE 315 524-4446 Ex 673 0 C 0 c u l.icensee 0 Ml Cause L Correctrve 0 0 0 0 Ew 0 0 c 0 ~

0 Event Action to Ho. Date 0 0 0 0 0 E 0

~

I- 0 & 0 0 Prevent Recurrence Q ~ own 0 Report Il I/l (J 0

O 1

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 hfanual for Preparation of Data B-hfaintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Other (Explain) Exhibit 1 - Same Source

NAI~TIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 9 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-4446 Ext. 673 MONTH Jul 1994 During the month of July the average power was 98%.