Text
PR.ICDR.j; j." it.'
CCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION PLOOF,R.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 P
SUBJECT:
Monthly opera t for Jul 1994 for RE Ginna Nuclear
- Power Plant.
/940809 l r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN1 EXTERNAL EGGG BRYCE 1 J H
NRC PDR COPIES LTTR'NCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT
,ID CODE/NAME JOHNSON,A ARDORS OEAB EG F~E 01 NOAC COPIES LTTR ENCL 1
1 1
~
1 1
1 1
1 Y'
C U
N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
//I/////, //Zl/8 ROCHESTER GAS ANDELECTRICCORPORATION o 89 EASTAVENUE, ROCHESTER, N. Y. 14649<001 JOSEPH A. WIDAY Rant Manager Gtnna Nuclear Plant TELEPHONE AREACODE 7l 6 546-2700 GINNA STATION August 9, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for July, 1994 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of July, 1994.
Very truly yours, Joseph A. Widay Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
'I Artn n~
9408220109'40731 PDR ADOCK 05000244 R
lI I
~
II 1
OPERATING DATA REPORT DOCKET NO. 50-244 DATE: August 9, 1994 COMPLETED BY:
Ronald D. Ploof TELEPHONE (315) 524-4446 Ext.673 OE GS US
- 1. Unit N R.E. GINNA NUCLEAR POWER PLANT Notes:
2.
Reporting Period:
July, 1994 3.
Ucensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Not MWo):
470 8.
If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If Any:
This Month Yr.-to.Date Cumulative" 11.
Hours in Reported Period 12.
Number of hours Reactor Was Critical 13.
Roactor Reserve Shutdown Hours 14.
Hours Generator On-line 15.
Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 17.
Gross Electrical Energy Generated (MWH) 18.
Net Electrical Energy Generated (MWH) 19.
Unit Service Factor (%)
20.
Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 744.0 0.0 744.0 0.0 1103845 366443 348165 100.0 100.0 99.6 99.6 7.7 5087.0 3915.1 0.0 3851.9 0.0 5570613 1882634 1788132 75.7 75.7 74.8 74.8 4.2 216335.0 172441.6 1688.0 i 169603.9 8.5
'40526626 79565993 75523505 78.4 78.4 75.4 75.4 5.6 24.
Shutdowns Scheduled Over Noxt 6 Months (Typo, Dato and Duration of Each):
- 25. If Shutdown At End of Report Poriod, Estimato Date of Startup:
26.
Units in Tost Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION 0 CUMULATIVETOTALCOMMENCING JANUARY 1, 1975
" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: Au ust 9
1994 COMPLETED BY:
Ronald Ploof TELEPHONE:
315 524-4446 Ext.
673 MONTH Jul 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2.
3.
476 477 476 17.
18.
19.
. 467 468 467 4,
475 20.
467 5.
474 21.
467 6.
473 22.
466 472 23.
463 8.
472 24.
467 9.
470 25.
462 10.
469 26.
463 27.
463 12.
471 28.
463 13.
468 29.
463 14.
468 30.
462 15.
469 31.
462 16.
467 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT hlONTH DO(KI-T NO 50 244 UNITNAhlE R E. GINNA NUCLEAR POWER. PLANT DATE Au ust 9, 1994 COhlPLETED I3Y Ronald Ploof 1 I.LEPHONE 315 524-4446 Ex 673 Ho.
Date 0
I-00 0
~
0 0 &
Q ~
00 00 0
c u 0
~
0 own 0
0O l.icensee Event Report Il Ew 0
0 0
I/l (J C0 Ml c
0 0
E 0
Cause L Correctrve Action to Prevent Recurrence 1
F: Forced S:
Scheduled REV. 4/85 4949 Reason:
A-Equipment Failure (Explain)
B-hfaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hlethod:
1 hfanual 2-hfanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NAI~TIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 9
1994 COMPLETED BY:
Ronald Ploof TELEPHONE:
315 524-4446 Ext.
673 MONTH Jul 1994 During the month of July the average power was 98%.