Monthly Operating Rept for Dec 1993 for Re Ginna Nuclear Power Plant.W/940111 Ltr
ML17263A519
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1993
From: Dodge R, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9401240137
Download: ML17263A519 (8)


Text

Al'ELERATED DISTRIBUTION DEMONS+ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:9401240137 DOC.DATE: 93/12/31 NOTARXZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Dec 1993 for RE Ginna Nuclear Power Plant.W/940111 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) S 1

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 /

RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 I NRR DORS OEAB 1 1 NRR/DRIL/RPEB 1 1 S

1 1 RGN1 1 1 EXTERNAL EGGG BRYCE i J ~ H 1 1 NRC PDR NSIC 1 1 R

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIS1S FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPXES REQUIRED: LTTR 11 ENCL 11

/I

/rIlrIIrII '//I/I/////

t ES 5'/II///II e,///I/////////

ROCHESTER GASANDELECTRICCORPORATION o 89EASTAVENUE, ROCHESTER, N.Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Plant Manogor AREA CODE Tte 546-2700 Glnna gucloor Pont GINNA STATION January 11, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for December, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1993.

Very truly yours, a.d oseph A. Wida Plant Manager JAW:jkl Attachments c: Mr. Thomas T. Martin NRC (1) 2L0049 940i240i37 931231 PDR R -

ADOCK 05000244 PDR, xP

..'"~<

I ~

~

u

) ! ~

D jl

OPERATING DATA REPORT DOCKET HO. 50-244 D E Jan. 11 1WC COMPLETED BY Robert E Dodge TELEPHONE 315 524-4446 Ext. 396 OPERATING STATUS

1. Unit Nano: R.E. GINNA NUCLEAR PQIER PUNT Iiotcs= The unit operated at approximately
2. Reporting Period: Decetrber 1993 98K power level for the month of 30 Licensed Thermal Power (HWt): 1520 December, except for reduction out-
4. Nameplate Rating (Gross MWe): 490 lined on page 4.
5. Design Electrical Rating (Net We): 470
6. Maxinun Dependable Capacity (Gross MWe): 490
7. Maxiaun Dependable Capacity (Het HWe): 470
8. If Changes Occur in Capacity Ratings (Items Nmher 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-gate Cunui at ive

  • 0
11. Hours In Report Period 744 8 760 211 650.45
12. Nwher of Hours Reactor Was Critical 744 7 561 79 168 526 46
13. Reactor Reserve Shutdown Hours 1 687.55
14. Hours Generator On-Line 744 7 509.25 165 752.38 15 ~ Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (MWH) 1 099 588 10 912 260 234 956 013
17. Gross Electrical Energy Generated (MWH) 374 243 3 685 555 77 683 359
18. Het Electrical Energy Generated (MWH) 355 792 3 499 442 73 735 373
19. Unit Service Factor 100y. 85.72K 78.46K
20. Unit Availability Factor 10(N 85.72K 78.47K
21. Unit Capacity Factor (Using MDC Het) 101.75K 85.00K 75.41K 22 ~ Unit Capacity Factor (Using DER Het) 101.75K 85.00y 75.41K
23. Unit Forced Outage Rate OX 2.11K 5.70K
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refueli and Maintenance March 4 1994 - duration: 38 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup
26. Units In Test Status (Prior to Conmerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CINULATIVE TOTAL COMMEHCING JANUARY 1, 1975 CNIULATIVE TOTAL COMMENCING NOVEHBER 8, 1969

t t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DA  : Jan. 11 1994 COMPLETED BY:

Robert E. Dodg TELEPHONE: 315 524-4446 Ext. 396 MONTH December 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 480 17. 480 2 ~ 480 18. 480 3 ~ 480 19. 480 4 ~ 480 20. 421

5. 480 21. 479
6. 480 22. 479
7. 480 23. 479
8. 480 24. 479
9. 480 25. 480
10. 480 26. 479 480 27. 479
12. 480 28. 47
13. 480 29. 479
14. 480 30. 479
15. 480 31 ~ 479
16. 480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DO(:KET NO. ~o'44 IINITNAMI: R.E. GINNA NUCLEAR POWER PLANT

.UNIT SHUTDOWN AND POWER REDUCTIOHS (:OhlPLI'.1'I D BY Robert E. Dodge REPORT MONTH O'I'.LI'.PIIONI'. 315 524-4446 Ext. 396 I

0cu DI >>0 4 0 IA Cause gI Corrective

.0 III 4 0 4 Licensee E~

0 4 I

Event 0 0 Action to No. Dote 4 0 P

III 4 VI 0 0 0 Report 0 Prevent Recurrence Q ~ CC Ocn 4 II EO Q O 0

O 93-08 12-20-93 F 17.06 HH HTEXCH Wall thinning on upper bearing oil cooler. Installed new copper tubing. -.

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -hfanual for Preparation of Data B-Maintenance or Tesc 2-hlanual Scram. Entry Sheets for Liccnsec C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NIJRFG-D-Regulatory Restriction 4-Other (Fxplain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) ecv. 4/8$ 4set Il-Ocher (Explain) Exhibit I - Same Source

~ J r

wl

NARRATXVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J n. 11 1994 COMPLETED BY:

Robert E.Dod e TELEPHONE: 315 524-4446 Ext. 396 MONTH December 1993 During the month of December the average power level was 984.

On December 20th, 'power was reduced to 704 for repairs of the Heater Drain Tank Pump B lube oil cooler. Returned to full power that day and remained there at the end of report period.