ML17263A519
| ML17263A519 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 12/31/1993 |
| From: | Dodge R, Widay J ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9401240137 | |
| Download: ML17263A519 (8) | |
Text
Al'ELERATED DISTRIBUTION DEMONS+ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:9401240137 DOC.DATE: 93/12/31 NOTARXZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION R
SUBJECT:
Monthly operating rept for Dec 1993 for RE Ginna Nuclear Power Plant.W/940111 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
D S
1 05000244 /
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA NRR DORS OEAB EXTERNAL EGGG BRYCE iJ
~ H NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DSP/TPAB NRR/DRIL/RPEB RGN1 NRC PDR COPXES LTTR ENCL 1
1 1
1 1
1 1
1 D
I S
R D
NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIS1S FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPXES REQUIRED:
LTTR 11 ENCL 11
/I t /rIlrIIrII '//I/I/////
ES 5'/II///II e,///I/////////
ROCHESTER GASANDELECTRICCORPORATION o 89EASTAVENUE, ROCHESTER, N.Y. 14649<001 JOSEPH A. WIDAY Plant Manogor Glnna gucloor Pont TELEPHONE AREA CODE Tte 546-2700 GINNA STATION January 11, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for December, 1993 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1993.
Very truly yours, a.d oseph A. Wida Plant Manager JAW:jkl Attachments c:
Mr. Thomas T. Martin NRC (1) 2L0049
, 940i240i37 931231 PDR ADOCK 05000244 R
- PDR, xP
..'"~<
~
) ! ~
I
~
u D
jl
OPERATING DATA REPORT COMPLETED BY DOCKET HO.
50-244 D
E Jan.
11 1WC OPERATING STATUS Robert E
Dodge TELEPHONE 315 524-4446 Ext. 396 1.
2.
30 4.
5.
6.
7.
8.
Unit Nano:
R.E.
GINNA NUCLEAR PQIER PUNT Reporting Period:
Decetrber 1993 Licensed Thermal Power (HWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net We):
Maxinun Dependable Capacity (Gross MWe):
Maxiaun Dependable Capacity (Het HWe):
If Changes Occur in Capacity Ratings (Items Iiotcs=
The unit operated at approximately 98K power level for the month of
- December, except for reduction out-lined on page 4.
1520 490 470 490 470 Nmher 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
11.
12.
13.
14.
15 ~
16.
17.
18.
19.
20.
21.
22 ~
23.
Hours In Report Period Nwher of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Het Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Het)
Unit Capacity Factor (Using DER Het)
Unit Forced Outage Rate This Month 744 744 744 1 099 588 374 243 355 792 100y.
10(N 101.75K 101.75K OX Yr.-to-gate 8 760 7 561 79 7 509.25 10 912 260 3 685 555 3 499 442 85.72K 85.72K 85.00K 85.00y 2.11K Cunui at ive
- 0 211 650.45 168 526 46 1 687.55 165 752.38 8.5 234 956 013 77 683 359 73 735 373 78.46K 78.47K 75.41K 75.41K 5.70K 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refueli and Maintenance March 4 1994 - duration: 38 da s.
25.
If Shut Down At End of Report Period, Estimated Date of Startup 26.
Units In Test Status (Prior to Conmerciai Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION CINULATIVE TOTAL COMMEHCING JANUARY 1, 1975 CNIULATIVE TOTAL COMMENCING NOVEHBER 8, 1969
t t
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DA
- Jan.
11 1994 COMPLETED BY:
Robert E.
Dodg TELEPHONE:
315 524-4446 Ext.
396 MONTH December 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
480 17.
480 2 ~
480 18.
480 3 ~
480 19.
480 4 ~
480 20.
421 5.
480 21.
479 6.
480 22.
479 7.
480 23.
479 8.
480 24.
479 9.
480 25.
480 10.
480 26.
479 480 27.
479 12.
480 28.
47 13.
480 29.
479 14.
480 30.
479 15.
480 31 ~
479 16.
480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DO(:KET NO.
~o'44 IINITNAMI:R.E. GINNA NUCLEAR POWER PLANT
.UNIT SHUTDOWN AND POWER REDUCTIOHS
(:OhlPLI'.1'I D BY Robert E.
Dodge REPORT MONTH O'I'.LI'.PIIONI'.
315 524-4446 Ext.
396 No.
Dote
.0 III I
4P 0 Q ~
40III40 CC I
DI >>0 0cu 4
Ocn 4 0O Licensee Event Report II E~
0 0
0 O
Cause gI Corrective Action to Prevent Recurrence 93-08 12-20-93 F
17.06 HH HTEXCH Wall thinning on upper bearing oil cooler.
Installed new copper tubing.
F: Forced S:
Scheduled ecv. 4/8$ 4set Reason:
A-Equipment Failure (Explain)
B-Maintenance or Tesc C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Il-Ocher (Explain) hlethod:
I-hfanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Fxplain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsec Event Rcport (LER) File (NIJRFG-0161)
Exhibit I - Same Source
~
J r
wl
NARRATXVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: J n.
11 1994 COMPLETED BY:
Robert E.Dod e TELEPHONE:
315 524-4446 Ext.
396 MONTH December 1993 During the month of December the average power level was 984.
On December 20th, 'power was reduced to 704 for repairs of the Heater Drain Tank Pump B lube oil cooler.
Returned to full power that day and remained there at the end of report period.