ACCELERATED D STRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9312150081 DOC.DATE: 93/12/09 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3 DOCKET 05000244 R
D
/
05000244 A
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
SUBJECT:
Forwards Relief Request 25,requesting relief from provisions of ASME Code,Section XI requirements for hydrostatic testing for welded repair 6 replacement activities on service water sys,for approval by 940204.
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DSP/ROAB NRR/EMCB 0 /~BF 13 EG F E
01 EXTERNAL EGGG BROWN i B NRC PDR COPIES LTTR ENCL 1
0 2
2 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DE/EMEB NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EGGG RANSOME,C NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
0 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 13
II
'0 A,
P t
t
~.
y "II
ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY Vice President Cinna Nudear Production December 9,
1993 TELEPHONE AREACODE 716 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Ginna Nuclear Power Plant Inservice Program Quality Assurance Manual, Appendix B
ASME Section XI Required Examinations Relief Request No.
25 R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
The purpose of this letter is to request relief from the provisions of the ASME Code,Section XI requirements for hydrostatic testing for welded repair and replacement activities on the Ginna service water system.
These activities are planned for the spring 1994 Refueling Outage.
This relief request is made in accordance with the provisions of 10CFR50.55a(a)(3)(i).
The basis for this relief request is consistent with the ASME Section XI safety philosophy espoused in pending Code Case N-416-1, which is currently in the approval process.
This case has been reviewed by the
- NRC, and comments have been provided back to ASME.
Our relief request No.
25 incorporates the NRC comments.
We believe that the alternative examination and testing presented in this relief request provides the acceptable level of quality and safety required.
Because of the extensive Service Water System repair work currently scheduled for the 1994 Refueling Outage (beginning March 4),
we request that this Relief Request be approved by February 4,
1994.
Very truly yours, Robert C. Mecredy GJWIL310 Attachment
~conf:~ --
93i2i5008i 932209,
0 J
t'l
$ :i '" C+l.
)
re Pl I
xc: Mr. Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector
RELIEF REQUEST NO.
25 I.
Components for which Relief is Requested.
The Class 3
portions of the Service Water System (SWS),
including SWS supply to Auxiliary Feedwater, when hydrostatic pressure tests are required due to repair or replacement activities.
II. ASME Requirements from which Relief is Requested:
Relief is requested from the requirements specified in IAW-4400 and IWD-5223(a) of the 1986 Edition, no addenda.
Hydrostatic testing of repairs or replacements in Class 3
systems is required by IWA-4400.
The pressure testing rules of IWA-4400(a):
After repairs by welding on the pressure retaining boundary, a system hydrostatic test shall be performed in accordance with IWA-5000.
IWA-5000 specifies that hydrostatic testing shall be performed to IWD-5223(a).
IWA-5223(a) states in part the following:
The system hydrostatic test pressure shall be at least 1.10 times the system pressure P~ for systems with Design Temperature of 200'F or less,...
and III. Basis Industry studies have shown that the hydrostatic pressure test specified in IWD-5223(a) is not an integrity test of the weld, but is in fact a leakage test run at a high pressure.
Using surface examination methods on different passes of the weld or volumetric examinations methods on a completed weld provide more comprehensive results in the determination of the integrity of the weld.
In addition, a system inservice or functional test and VT-2 examination will be performed on the completed welds.
The SWS is a moderate energy system that operates at a nominal 75 psig, which is only 90 psig below the Code required hydrostatic test pressure.
The Code required hydrostatic test would not offer any significant increase in the ability to determine the leak-tightness of the repairs over testing performed at system nominal operating pressure.
The structural integrity will be ensured by the controls instituted in the repair or replacement procedures and
r 4
verified with NDE.
its integrity is redundancy in SWS requirements.
IV. Proposed Alternate I
Since the system is in constant operation, continually monitored.
In addition, the gives added assurance of meeting heat load Method In lieu of performing the hydrostatic pressure test required by IWA-4400 for welded repairs or installation of replacement items in the Service Water System (Class 3) by welding, the following examinations and tests shall be performed.
1.
NDE shall be performed in accordance with the methods and acceptance criteria of Subsection ND of the 1986 Edition of Section III.
In addition, when the surface examination method is used in accordance with ND-5222 for a butt weld, an additional surface examination shall be performed on the root (pass) layer.
- 2. Prior to or immediately upon return to service, a
VT-2 visual examination shall be performed in conjunction with a system inservice or functional test, using the 1986 Edition of Section XI, in accordance with IWA-5000, at nominal operating pressure and temperature.
3.
Use of this Case shall be documented on an NIS-2"Form.