ACCELERATED DOCUMENT DISTRIBUTION SYSTEM REGULATE% INFORMRTION DISTRIBUTIONOLSTEM (RIDE)
ACCESSION NBR:9310190365 DOC.DATE: 93/09/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION DODGEF'R.E.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Sept 1993 for RE Ginna Nuclear Power Plant.W/931008 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ]
ENCL /
SIZE:
<TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 D
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONFA INTERNAL: AEOD/DOA DORP/
AB REG "FILE 01 EXTERNAL: EGSG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGNl NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESV, ROOM I'1-37 (E>iT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTI1IBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
(/ izrrr Er
~l El/ P,:
ROCHESTER GASANDELECTRICCORPORATIONo 69EASTAVENUE ROCHESTER, N.K 1464M)001 JOSEPH A. WIDAY Rant Monagor Ghna Nuchor Plant TELEPHONE AREACODE 7t6 546-2700 GINNA STATION October 8, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for September, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1993.
Very truly yours, a
s h A. Widay-lant Manager JAW:clp Attachments c:
Mr. Thomas T. Martin NRC (1)
~ O.A.P Q~t 93iOi90365: 930930 PDR ADQCK "05000244
.R
" 'DR
OPERATING STATUS OPERATING DATA REPORT CNIPLETED BY DOCKET HO.
50-244
'ATE Oct
.8 l9ll3 Robert E. Dodge TELEPHONE 315 524-4446 Ext. 396 20 3.
5 ~
6.
70 8.
Reporting Period:
Se tember 1993 Licensed Thermal Power (HWt):
Nameplate Rating (Gross HWe):
Design Electrical Rating (Het We):
Maxim'ependable Capacity (Gross MWe):
Haxiaun Dependable Capacity (Net HWe):
If Changes Occur in Capacity Ratings (Itans 1.
Unit Nane:
R.E.
GINNA NUCLEAR PQIER PLANT Notes:
The unit operated at approximately 98K power level for the month of September.
1520 490 470 490 470 Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Het HWe):
10.
Reasons For Restrictions, If Any:
This Honth Yr.-to-Date Cunulative 11.
12.
13.
14.
15 ~
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (Hii)
Net Electrical Energy Generated (HWH)
Unit Service Factor Unit Availability Factor, Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor. (Using DER Het)
Unit Forced Outage Rate 720 720 720 1 068 747 357 925 339 761 100/
100.40K 100.40K 0
X 6 551 5 498.29 5 462.25 7 974 162 2 688 237 2 552 768 83.38K 83.38N 82.91K 82.91K 0
209 441.45 166 462.96 1 687.55 163 705.38 8.5 232 017 915 76 686 041 72 788 699 78.31K 78.32K 75.24K 75.24K 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refueli snd maintenance Hsrch C
199C.
Duration-40 ds s.
25'fShut Down At End Of Report Period, Estimated Date of Startup 26.
Units In Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCHHERCIAL OPERATION
<<CUWJLATIVE TOTAL COHHEHCING JANUARY 1, 1975
<<*CUMULATIVETOTAL CCHMEHCING NOVEHBER 8, 1969
V 4
t 1
AVERAGE DAILY UNIT POWER LEVEL UNIT DOCKET NO.
50-244 R.E.
Ginna Nuclear Power Plant D
Oc 8
1993 Ext.
396 MONTH Se tember 1993 COMPLETED BY TELEPHONE obert E.
Do e
315 524-4446 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 465 17.
471 2 ~
466 18.
471 3.
469 19.
472 467 20.
471 5.
467 21.
474 6.
468 22.
476 7 ~
469 23.
476 8.
469 24.
474 9.
470 25.
474 10.
470 26.
476 472 27.
475 12.
472 28.
476 13.
472 29.
477 14.
472 30.
477 15.
471 31.
16.
472 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole metgawatt.
V
4 UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
UNI1 NAMI.. R.E. GINNA NUCLEAR POWER PLANT DATE COhlPLETED BY oe oge Tl'.LEPI lONl'.
No.
Date 0
y)
I 0 0 Q ~
C0 00 cn <<0 E 0 0
0 l/l C 00 Licensee Event Report k
Em 0
vl 0 C
Q D E 0 0
Cause g Corrective Action to Prevent Recurrence No shutdown or power reduction for the month of September.
I F: Forced S:
Scheduled REV. 4/85 4949 2
Reason:
A-Equipment Failure (Explain)
B-hlaintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hlethod:
I-hlanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit I - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Oct.
8 1993 COMPLETED BY Robert E.Do ge TELEPHONE 315 524-4446 Ext.
396 MONTH Se tember 1993 The unit operated at approximately 98> reactor power level for the month of September and remained there at the end of the report period.