ML17263A393

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1993 for Re Ginna Nuclear Power Plant
ML17263A393
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/31/1993
From: Dodge R, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9309140172
Download: ML17263A393 (7)


Text

I

""AC%ELERAT DOCUMENT DISTR UTION SYSTEM REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9309140172 DOC.DATE: 93/08/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

WIDAYiJ.A.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1993 for RE Ginna Nuclear Power Plant.W/930910 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244

/

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: AEOD/DOA NRR ORS OEAB EG F L 01 EXTERNAL: EG6G BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD

,AEOD/DSP/TPAB NRR/DRIL/RPEB RGNl NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI TFIE DOCUMENT COi Jl'l<OL D):.S!'.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

0 SAN'/

81

/i///////////

ROCHESTER GASANDELECTRICCORPORATIONo 89EASTAVENUE, ROCHESTER, N.K 14649%001 JOSEPH A. WIDAY Rant Managor Glnna Nucloot Plant GINNA STATION September 10, 1993 TELEPHONE AREACODE 7le 546-2700 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for August, 1993 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1993.

Very truly yours, a,A s

h A. Widely)

Plant Manager JAW:jkl Attachments c:

Mr. Thomas T. Martin NRC (1) 7 93091'4bi72 93083i PDR ADOCK 05000244 PDR

OPERATXNG DATA REPORT CCHPLETED BY DOCKET NO.

50-244 E

Se t. 10 '1993 Robert E. Dodge GYRATING STATUS TELEPHONE 315 524-4446 Ext. 396 1 ~

20 3.

4.

5 ~

6.

7.

8.

Unit Nane:

R.E. GIHHA 1HH:LEAR PRIER PLANT Reporting Period:

Au ust 1993 Licensed Thermal Power (MWt):

Nameplate Rating (Gross We):

Design Electrical Rating (Net We):

Haxiaun Dependable Capacity (Gross NWe):

Haxiram Dependable Capacity (Net NWe):

If Changes Occur in Capacity Ratings (Items Notes:

The unit operated at approximately 98K power level for the month of August, except for reduction explained on page 4.

1520 490 470 490 470 Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net HWe):

10.

Reasons For Restrictions, If Any:

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Report Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (NWH)

Gross Electrical Energy Generated (HWH)

Net Electrical Energy Generated (HWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using ICC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Honth 744 744 744 1 MB 384 360 682 341 971 100K 10(C 97.80K 97.80K 0

Yr.-to-gate 5 831 4 778.29 4 742.25 6 905 415 2 330 312 2 213 007 81.33/

81.33K 80.75K 80.75K 0

Cunuiative

  • 0 208 721.45 165 742.96 1 687.55 162 985.38 8.5 230 949 168 76 328 116 72 448 938 78.24/.

78.24K 75.15K 75.15K 5.71K 24.

Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period, Estimated Date of Startup 26.

Units In Test Status (Prior to Comnerciai Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COHHERCIAL OPERATION

  • CUN/LATIVETOTAL COHHENCING JANUARY 1, 1975
    • CUIIJLATIVETOTAL COHHENCING NOVEHBER 8, 1969

AVERAGE DAILY UNIT POWER LAPEL MONTH Au ust 1993 DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant E

e t.

10 1993 COMPLETED BY Robert E.

odge TELEPHONE 315 524-4446 Ext.

396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 468 17.

469 2.

469 18.

473 3

~

468 19.

472 4

~

469 20.

472 5.

468 21.

469 6.

468 22.

470 7.

471 23.

470 8.

469 24.

470 9.

472 25.

467 10.

474 26.

466 472 27.

466 12'76 28.

466 13.

468 29.

403 14.

466 30.

277 15.

466 31.

427 16.

467 INSTRUCTIONS On this format, list the average daily unit power l'evel in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

UNITNAhfi:R.E. GINNA NUCLEAR POWER PLANT DATE Sept 10, 1993 l

COhfp LETED I3Y o ert E.

Do ge TI:.Ll:.PIIONF (315) 524-4446, Ext.

396 1

Ho.

Date 0

~

o b~

C0 00 Cn o-0 C u 0

0IA C 0b Licensee Event Report e

Ew 0

0 o

EA U C0 lA C

0 Q

0 E

0 CJ Cause g Corrective Action to Prevent Recurrence 93-04 8-29-93 44.87 A

HH HTEXCH Hall thinning on upper bearing oil cooler, repaired pin hole leak.

Long range plan is to replace cooler during 1994, AI60.

F: Forced S:

Scheduled Rtv. 4/$9 4949 Reason:

A-Eriuipment Failure (Explain)

B-hfaintenancc or Test C-Refueling D-Regulatory Restriction E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hfethod:

1 hfanual 2-hfanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsec Event Rcport (LER) File (NUREG-0161)

Exhibit I - Same Source

NARRATIVE SVMIGLRY OF OPERATING EXPERIENCE UNIT DOCKET NO. 50-244 R.E.

Ginna Nuclear Power Plant D

E Se t.

10 1993 COMPLETED BY Robert E.

Do e

TELEPHONE 315 524-4446 Ext.

396 MONTH Au ust 1993 The unit operated at approximately 98% reactor power level for the month of August.

On August 29, power was reduced to repair an upper bearing oil cooler leak on the B Heater Drain Tank Pump.

Power was returned to full load on August 31, at 10:03 a.m.

and remained there at the end of the report period.

/

~

~