Advises of Listed Unavoidable Delays in Progress of Level 1 PRA Per Generic Ltr 88-20.Util Anticipates Completion of Level 1 Activities by End of Sept,Completion of Level 2 Results by mid-Nov & PRA by Feb 1994
ML17263A381
Person / Time
Site: Ginna 
Issue date: 09/01/1993
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
References
GL-88-20, NUDOCS 9309090069
Download: ML17263A381 (5)


Text

scen,~X+ Rggukfz~r mls fRu PPN sYs' ACCESSION NBR:9309090069 DOC.DATE: 93/09/01 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH..NAME AUTHOR AFFILIATION MECREDT,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

SUBJECT:

Advises of listed unavoidable delays in progress of level 1

PRA per Generic Ltr 88-20.Util anticipates completion of level 1 activities by end of Sept, completion of level 2

results by mid-Nov

& PRA by Feb 1994.

DISTRIBUTION CODE: AOIID COPIES RECEIVED:LTR

(

ENCL P

SIZE:

TITLE: Generic Ltr 88-20 re Individual Plant Evaluations NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: ACRS HOUSTONgM

, NRR/ARPE/PD1-4 NRR/OGCB RES/DSIR/SAIB/B RGN 1

RGN 3

COPIES LTTR ENCL RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DSP/TPAB NRR J3SSQ/SPSB ES/SSTB RGN 2

RGN 4

COPIES LTTR ENCL D

EXTERNAL: NRC PDR NSIC

)~7] g(

A NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMEN'I'ON'I'ROLDESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAIIE FROM DIS'fRII3UTION LISTS FOR DOCUMENTS YOU DON'T HEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR O

24 ENCL

4 5

Illl/ lll

//IF//I///

ROCHESTER GAS AND ELECTRIC CORPORATION ZZ ':

o 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREDY Vice President Cinna Nuclear Production September 1,

1993 TELEPHONE AREACODE 718 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

Generic Letter 88-20 R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

RG&E's August 31, 1992 letter relative to Generic Letter 88-20 provided our anticipated schedule for submittal of our Level 2 PRA.

Several unavoidable circumstances have delayed our progress.

These include:

~ untimely death of the Level 1 contractor's project manager,

~ extensive additional documentation controls, needed to assure 10CFR50 Appendix B quality,

~ rework required to develop Level 1 to Level 2 interfacing models after changing Level 2 contractor organizations,

~ more detailed plant walkdown information required for internal flooding analyses than originally anticipated, and

~ complete re-review and recompilation of the Ginna-specific MAAP model to take advantage of the latest code improvements.

At this point, all Level 1 system models have been completed, and quantification is 904 complete.

The internal flooding model is 954 complete.

Level 1 to Level 2 interfacing issues are 954'esolved and binning of sequences into plant damage states is in progress.

MAAP scoping runs for Level 2 are in progress; containment event trees have been developed.

Human Reliability Assessment (HRA) procedures are also complete and detailed HRA is being completed and documented.

Based on this progress report, RGGE anticipates completion of Level 1 activities by the end of September, completion of Level 2 results by mid-November, and submittal of the Level 2

PRA to the NRC by February 1994 following a comprehensive in-house and independent review.

We believe that this proposed schedule'xtension is

>>jpnR AG0CK ono00244

/Pg 7/

" 086

J required for RG&E to perform the detailed, rigorous PRA needed to meet our commitments to Generic Letter 88-20, as well as our internal requirements for long-term use of the PRA.

Very truly you s, Robert C. Mecredy GJW/296 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector