ACCEI.ERA.T DOCUMENT IHSTRIBUTIONSYSTEM REGULAT INFORMATION DISTRIBUTIONZSTEM (RIDE)
ACCESSION NBR:9307140068 DOC.DATE: 93/06/30
'OTARIZED:
NO DOCKET t FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUDI.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas
& Electric Corp.
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME REC1PIENT AFFILIATION
SUBJECT:
Monthly operating rept for June 1993 for RE Ginna Nuclear Power Plant.W/930709 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I
ENCL I
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA N
~OR-OEAB LE 01 COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGNl COPIES LTTR ENCL 1
1 1
1 1
1 1
1 EXTERNAL EG&G BRYCE F J ~ H NSIC 1
1 1
1 NRC PDR 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
ZEN 1$ZS ROCHESTER GASANDELECTRICCORPORATION o 89EASTA VENUE, ROCHESTER, N.Y. 14649%001 JOSEPH A. WIDAY Rant Manager Glnna Nuclear Bont GZNNA STATION July 9, 1993 TELEPHONE AREA CODE 716 546-2700 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for June, 1993 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1993.
Very truly yours, DLJ se A. Widay Plant Manager JAW:jkl Attachments c:
Mr. Thomas T. Martin NRC (1)
'9307i40068
'rt30630
'PDR
<"ADOCK 05000244 R
i>900ki
OPERATING DATA REPORT CCMPLETED BY DOCKET NO.
50-2CC D
Jul 9
1993 obert E. Dodge
%%RATING STATUS TELEPHONE 315 524.4446 Ext. 396 1 ~
2.
3.
4.
5.
6.
7.
8.
Unit Name:
R.E. GINNA NKEEAR PGKR PLANT Reporting Period:
June 1993 Licensed Thermal Power (Wt):
Hameplate Rating (Gross HMe):
Design Electrical Rating (Het We):
Haxlmia Dependable Capacity (Gross HMe):
Haxisun Dependable Capacity (Het HMe):
If Changes Occur in Capacity Ratings (Items Notes:
The reactor power level averaged 98K for the report period.
1520 490 C70 490 470 Nwher 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Mhich Restricted, If Any (Het MMe):
10.
Reasons For Restrictions, If Any:
11.
12.
13.
14.
15
'6.
17.
18.
19.
20.
21.
22 ~
23.
Hours In Report Period Narber of Hours Reactor Mas Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (WH)
Gross Electrical Energy Generated (MMH)
Net Electrical Energy Generated (M'MH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 720 720 720 1 068 915 362 817 344 984 100'00X 101.95K 101.95K 0
X Yr.-to-Date 4 343 3 290.29 3 254.25 4 711 465 1 599 620 1 519 793 74.93K 74.93K 74.46K 74 46K 0
Cumjlative 0*
207 233.45 164 25C.96 1 687.55 161 497.38 8.5 228 755 218 75 597 424 71 755 724 78.08K 78.09'4.98K 74.98K 5.76K 24.
Shutdowns Scheduled Over Hext 6 Months (Type, Date and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup 26.
Units In Test Status (Prior to Ccmnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COHMERCIAL OPERATION
- CUMULATIVE TOTAL COMHENCIHG JANUARY 1, 1975
- CUMULATIVE TOTAL CCMHENCIHG NOVEMBER 8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Jul 9
1993 COMPLETED BY Robert E.
Dod e TELEPHONE 315 524-4446 Ext.
396 MONTH Zune 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
481 17.
479 2.
480 18.
479 3.
480 19.
478 4 ~
480 20.
479 5.
481 21.
479 6.
481 22.
477 7 ~
480 23.
477 8.
480 24.
477 9.
480 25.
478 10.
480 26.
477 480 27.
475 12.
480 28.
474 13.
481 29.
474 14.
480 30.
474 15.
480 31.
16.
479 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH r
DO(:KET NO.
UNlTNAME. R.E. GINNA NUCLEAR POWER PLANT DATE
(:OhlPLETED BY ob rt DG~
TELEPHONE 315-524-4446 Ext.396 No.
Date 0
I-c0 0
~
0 O~
c0 00 tx!
al r-0 c 0 o ~
oln C
0O Licensee Event Report 0
Ew 0
0 o
lA c0 ln 0c o
E 0
O Cause 8 Corrective Action to Prevent Recurrence No power reduction for the month of June F: Forced S:
Scheduled REV. 4/89 4949 Reason:
A-Equipment Failure (Explain)
B-hfaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hletbod:
1-hManual 2-htanual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATXVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant D
Jul 9
1993 COMPLETED BY Robert E.
Dodge TELEPHONE 315 524-4446 Ext.
396 MONTH June 1993 The unit operated at approximately 984 reactor power level for the month of June.